PART IPRELIMINARY

Interpretation2.

(1)

In this Order, except where the context otherwise requires–

“Authority” means Mallaig Harbour Authority;

“construct” includes make, build, erect, install, provide, execute, place, alter, maintain and renew and “construction” shall be construed accordingly;

“deposited plans” and “deposited sections” mean respectively the plans and sections prepared in duplicate, signed by a member of the Scottish Executive and marked “The Mallaig Harbour Revision Order 2004” copies of which have been deposited with the Scottish Ministers at the Scottish Executive and at the office of the Authority;

“harbour undertaking” means the harbour undertaking of the Authority as for the time being authorised;

“the limits of deviation” means the limits so shown on the deposited plans; and

“works” means works authorised by this Order, or as the case may require, any part thereof and includes any work constructed pursuant to Article 3 (Power to carry out works) and any work carried out pursuant to Article 5 (Subsidiary Works).

(2)

All areas, directions, distances, lengths and widths as stated in any description of works, powers or lands other than Article 4 (Power to deviate) of this Order shall be construed as if the words “or thereabouts” were inserted after each such area, direction, distance, length and width and any reference in a description of works to a point shall be a reference to that point on the deposited plans.

(3)

Reference points specified in this Order shall be construed as references to Ordnance Survey National Grid reference points.