Interpretation2.
(1)
In this Order–
“the Act” means the Electricity Act 1989;
“advanced conversion technologies” means gasification, pyrolysis or anaerobic digestion, or any combination thereof;
“anaerobic digestion” means the bacterial fermentation of organic material in the absence of free oxygen;
“banking day” means a day on which banks are generally open in the City of London excluding Saturdays or Sundays;
“biomass” means fuel used in a generating station of which at least 98 per cent. of the energy content (measured over a period of one month) is derived from plant or animal matter or substances derived directly or indirectly therefrom (whether or not such matter or substances are waste) and includes agricultural, forestry or wood wastes or residues, sewage and energy crops (provided that such plant or animal matter is not or is not derived directly or indirectly from fossil fuel);
“commissioned” means the completion of a process of such procedures and tests as from time to time constitute usual industry standards and practices for commissioning a generating station in order to demonstrate that the generating station is capable of commercial operation;
“declared net capacity” means, in relation to a hydro generating station, the highest generation of electricity (calculated by adding together the highest generation of electricity at the main terminals of each alternator and dynamo) which, on the assumption that the source of power is available uninterruptedly, can be maintained indefinitely without causing damage to the plant less so much of that electricity as is consumed by the plant;
“designated electricity supplier” means any electricity supplier supplying electricity in Scotland;
“eligible renewable sources” has the meaning given to it in article 8;
“energy crops” means a plant crop planted after 31st December 1989 and grown primarily for the purpose of being used as fuel;
“gasification” means the substoichiometric oxidation or steam reformation of a substance to produce a gaseous mixture containing two or all of the following: oxides of carbon, methane and hydrogen;
“hydro generating station” means a generating station which is wholly or mainly driven by water (other than a generating station driven by tidal flows, waves, ocean currents or geothermal sources) and the “generating station” extends to all turbines supplied by the same civil works, except that any turbine driven by a compensation flow supplied by those civil works where there is a statutory obligation to maintain such compensation flow in a natural water course shall be regarded as a separate hydro generating station;
“interconnector” means the electric lines, electrical plant and meters operated solely for the transfer of electricity between the transmission and distribution network in Great Britain and the transmission and distribution network in another country or Northern Ireland;
“large hydro generating station” means a hydro generating station which has, or has had at any time since 1st April 2002, a declared net capacity of more than 20 megawatts;
“micro hydro generating station” means a hydro generating station with a declared net capacity of 1.25 megawatts or less provided that the generating station has always been in private ownership and has never generated electricity under an arrangement which has ever been a qualifying arrangement as defined in section 33 of the Act (as that section was originally enacted);
“minimal fossil use generating station” has the meaning given to it in article 8(13);
“obligation period” means any of the periods referred to in the first column of Schedule 1;
“on land” in relation to the location of a generating station means wholly or partly on land above mean high water level;
“plant” with reference to crops or plant matter, includes shrubs and trees;
“pyrolysis” means the thermal degradation of a substance in the absence of any oxidising agent (other than that which forms part of the substance itself) to produce char and one or both of gas and liquid;
“qualifying arrangement” means (except in the definition of “micro hydro generating station”) an arrangement which was originally made pursuant to a Non-Fossil Fuel Order (including any replacement of such an arrangement where that replacement was made pursuant to an order made under section 67 of the Utilities Act 2000);
“Register” has the meaning given to it in article 4(1);
“registered holder” has the meaning given to it in paragraph 2 of Schedule 2;
“renewables obligation” has the meaning given to it in article 3;
“replacement SROC” means a SROC issued in accordance with article 5(3)(b) and (4);
“SROC” means a certificate issued by the Authority under section 32B of the Act and pursuant to this Order and, save where otherwise provided, includes a replacement SROC;
“SROC sequence number” has the meaning given to it in article 4(9);
“specified day”, in relation to an obligation period, means the 1st October immediately following it;
(2)
The civil works which are to be regarded as supplying a particular turbine (“the relevant turbine”) are all the man-made weirs, man-made structures and man-made works for holding water which are located on the inlet side of the relevant turbine, but excluding any such weirs, structures or works which supply another turbine before water is supplied to the weirs, structures and works which supply the relevant turbine.
(3)
Unless the context otherwise requires any reference in this Order to the provision of information “in writing” shall include the transmission of such information by either electronic mail or facsimile.