The West of Scotland Water Authority (Eredine, Allt Garbh) Water Order 2000
Citation and commencement
1.
This Order may be cited as the West of Scotland Water Authority (Eredine, Allt Garbh) Water Order 2000 and shall come into force on 1st August 2000.
Interpretation
2.
In this Order–
“the Act” means the Water (Scotland) Act 1980;
“day” means a period of 24 hours reckoned from midnight;
“deposited plan” means the plan, prepared in duplicate, docketed and signed as relative to this Order and marked “The West of Scotland Water Authority (Eredine, Allt Garbh) Water Order 2000, Plan of Catchment Area, Location Plan and Plan and Section of Works”, one copy of which is deposited at the Scottish Executive, Victoria Quay, Edinburgh, and the other at the office of the Chief Executive of the Authority at 419 Balmore Road, Glasgow, G22 6NU;
“intake” includes any work by which water is taken by the Authority for the purposes of the undertaking;
“undertaking” means the water undertaking for the time being of the Authority;
Incorporation and application of the provisions of Schedule 4 to the Act
3.
Water rights
4.
Subject to the provisions of this Order, the Authority may, for the purposes of the undertaking, take water from the river known as the Allt Garbh, in the Argyll and Bute Council area, by means of the intake structure of the works.
5.
(1)
During construction of the works, the Authority may take from the said Allt Garbh such water as they may require for such construction.
(2)
After completion of the works, the Authority may take from the said Allt Garbh, in any day, a quantity of water not exceeding 33 cubic metres at a rate not exceeding 23 litres per minute.
6.
If the power to take water conferred by this Order has not been exercised by 1st August 2010 the said power shall cease.
Miscellaneous
7.
The Authority shall at all times after 1st February 2001 keep at the office of the Chief Executive of the Authority a copy of this Order and a copy of the deposited plan.
Victoria Quay,
Edinburgh
SCHEDULE 1
The works referred to in this Order and shown on the deposited plan marked “The West of Scotland Water Authority (Eredine, Allt Garbh) Water Order 2000, Plan of Catchment Area, Location Plan and Plan and Section of Works” are–
Refurbishment of the existing intake channel at the weir on the said Allt Garbh and covering of said channel up to and including the construction of a new intake channel which incorporates a weir plate with a rectangular notch designed for a maximum abstraction of 33 cubic metres per day. Concrete infill of channel beyond proposed abstraction channel and box screen to new channel and weir.
SCHEDULE 2
The modifications and adaptations of Schedule 4 to the Act referred to in article 3 of this Order are–
Section 10(3)
“If the Authority take any water contrary to the provisions of the West of Scotland Water Authority (Eredine, Allt Garbh) Water Order 2000 they shall, without prejudice to their civil liability, if any, to a person aggrieved, be liable, in the case of an offence under paragraph (a) of this subsection, on summary conviction to a fine not exceeding level 3 on the standard scale and, in the case of an offence under paragraph (b) of this subsection–
(i)
on summary conviction, to a fine not exceeding the statutory maximum; and
(ii)
on conviction on indictment, to a fine.”.