2000 No. 150
The Town and Country Planning (Fees for Applications and Deemed Applications) (Scotland) Amendment Regulations 2000
Made
Coming into force
The Scottish Ministers, in exercise of the powers conferred on them by section 252 of the Town and Country Planning (Scotland) Act 19971 and of all other powers enabling them in that behalf, hereby make the following Regulations, a draft of which has, in accordance with sub-section (4) of the said section 252, been laid before, and approved by resolution of the Scottish Parliament:
Citation, commencement, interpretation and application1
1
These Regulations may be cited as the Town and Country Planning (Fees for Applications and Deemed Applications) (Scotland) Amendment Regulations 2000.
2
These Regulations shall come into force on 1st June 2000.
3
In these Regulations “the principal Regulations” means the Town and Country Planning (Fees for Applications and Deemed Applications) (Scotland) Regulations 19972.
4
These Regulations apply to:—
a
applications referred to at regulation 1(2)(a) of the principal Regulations which are made on or after the day on which these Regulations come into force;
b
deemed applications for planning permission in connection with an enforcement notice issued on or after the day on which these Regulations come into force.
General increase
2
1
The principal Regulations shall be amended in accordance with this and the following regulations.
2
In regulation 12—
a
in paragraph (5)(b) for “£90, and on or after 1 October 1997, £95” there shall be substituted “£105”; and
b
in paragraph (6) from “£180” to “£9,500” there shall be substituted “£210 for each dwellinghouse, subject to a maximum of £10,500”;
3
In regulation 13(1) for “£33, and on or after 1 October 1997, £35” there shall be substituted “£40”; and
4
In regulation 14(2) for “£90, and on or after 1 October 1997, £95” there shall be substituted “£105”.
3
In the Schedule to the principal Regulations—
a
in paragraphs 4(1) and 5(2) and (3)(b) for “£180, and on or after 1 October 1997, £190” there shall be substituted “£210”;
b
in paragraphs 6 and 7(b) for “£90, and on or after 1 October 1997, £95” there shall be substituted “£105”;
c
in paragraph 14 for “£180” to “£4,750” there shall be substituted “£210 for each 0.1 hectares of the site area, subject to a maximum of £5,250”.
4
In place of Tables I and II of the Schedule to the principal Regulations there shall be substituted the Table contained in the Schedule to these Regulations.
Savings5
These Regulations shall not affect the principal Regulations in so far as they apply to—
a
any application or deemed application referred to at regulation 1(2)(a) of the principal Regulations made before 1st June 2000;
b
any deemed application for planning permission in connection with an enforcement notice issued before 1st June 2000.
SCHEDULE
TABLESCALE OF FEES ON AND AFTER 1 JUNE 2000
1
2
(Category of development)
(Fee Payable)
I. Operations
1
The erection of dwellinghouses (other than development within category 5).
Where the application is for—
- a
outline planning permission, £210 for each 0.1 hectare of the site area, subject to a maximum of £5,250; or for one dwellinghouse, £210;
- b
other than outline planning permission, £210 for each dwellinghouse to be created by the development, subject to a maximum of £10,500.
2
The erection of buildings (other than buildings coming within category 1, 3, 3A or 5).
Where the application is for—
- a
outline planning permission, £210 for each 0.1 hectare of the site area, subject to a maximum of £5,250;
- b
other than outline planning permission—
- i
where no floor space is to be created by the development, £105;
- ii
where the area of gross floor space to be created by the development does not exceed 40 square metres, £105;
- iii
where the area of gross floor space to be created by the development exceeds 40 square metres but does not exceed 75 square metres, £210; and
- iv
where the area of gross floor space to be created by the development exceeds 75 square metres, £210 for each 75 square metres, subject to a maximum of £10,500.
3
The erection on land used for the purposes of agriculture, of those works, structures or buildings excluded by virtue of paragraph 2(d) of Class 18 in Schedule 1 to the General Permitted Development Order from that class (other than buildings coming within category 3A).
a
Where the application is for outline planning permission, £210 for each 0.1 hectare of the site area, subject to a maximum of £5,250;
b
in all other cases—
i
where the ground area to be covered by the development exceeds 465 square metres but does not exceed 540 square metres, £210;
ii
where the ground area to be covered by the development exceeds 540 square metres, £210 for the first 540 square metres and £210 for each 75 square metres in excess of that figure, subject to a maximum of £10,500.
3A
The erection on land used for the purposes of agriculture, of glasshouses excluded by virtue of paragraph 2(d) of Class 18 of the General Permitted Development Order 1992.
Where the ground area to be covered by the development exceeds 465 square metres, £1,195.
4
The erection, alteration or replacement of plant or machinery
£210 for each 0.1 hectare of the site area, subject to a maximum of £10,500.
5
The enlargement, improvement or other alteration of existing dwellinghouses.
a
Where the application relates to one dwellinghouse, £105;
b
where the application relates to 2 or more dwellinghouses, £210.
6
a
The carrying out of operations, including the erection of a building, within the curtilage of an existing dwellinghouse, for purposes ancillary to the enjoyment of the dwellinghouse as such;
b
the erection or construction of gates, fences, walls or other means of enclosure along a boundary of the curtilage of an existing dwellinghouse; or
c
the construction of car parks, service roads and other means of access on land used for the purposes of a single undertaking, where the development is required for a purpose incidental to the existing use of the land.
£105.
7
The carrying out of any operations connected with exploratory drilling for oil or natural gas.
£210 for each 0.1 hectare of the site area, subject to a maximum of £15,750.
8
The carrying out of any operations not within categories 1 to 7.
In the case of operations for—
- a
the winning and working of minerals, £105 for each 0.1 hectare of the site area, subject to a maximum of £15,750;
- b
the winning and working of peat, £105 for each hectare of the site area, subject to a maximum of £1,575;
- c
any other purpose, £105 for each 0.1 hectare of the site area, subject to a maximum of £1,050.
II. Uses of Land
9
The change of use of a building to use as one or more separate dwellinghouses.
£210 for each additional dwellinghouse to be created by the development, subject to a maximum of £10,500.
10
a
The use of land for the disposal of refuse or waste materials for the deposit of material remaining after minerals have been extracted from land; or
b
the use of land for the storage of minerals in the open.
£105 for each 0.1 hectare of the site area, subject to a maximum of £15,750.
11
The making of a material change in the use of a building or land, other than a material change of use within category 9 or 10.
£210.
(This note is not part of the Regulations)