The Nutrient Action Programme Regulations (Northern Ireland) 2019 No. 81 xmlns:atom="http://www.w3.org/2005/Atom"
Introductory Text
PART 1 Preliminary
1.Citation and commencement
2.Purpose and application of the Regulations
3.Interpretation
PART 2 General
4.Duty of the controller to prevent water pollution
5.Duty of the controller to comply with these Regulations
6.Exemption granted by the Department
PART 3 Prevention of water pollution from the application of fertilisers
7.Prohibited application of fertiliser
8.Requirements as to the manner of land application of fertiliser to any agricultural land
9.General measures governing the limits on land application of nitrogen fertiliser
10.Measures governing the limits on land application of nitrogen fertiliser to grassland
11.Measures governing the limits on land application of nitrogen fertiliser to land other than grassland
12.Measures governing the application of anaerobic digestate
13.Measures governing the limits on the land application of chemical phosphorus fertiliser
14.Measures governing the limits on land application of organic manures with a high proportion of phosphorus
15.Measures governing the location of supplementary feeding sites and livestock drinking points
16.Fertilisation plans
PART 4 Storage requirements
17.General obligations as to storage facilities for livestock manure and silage effluent
18.Obligations as to livestock manure storage capacity on pig and poultry enterprises
19.Manner of storage of slurry
20.Manner of storage of farmyard manure and location of storage facilities
21.Manner of storage of poultry litter or anaerobic digestate fibre and location of storage facilities
22.Manner of storage of dirty water
23.Calculation of livestock manure storage capacity
24.Making and storage of silage
25.Cover in winter
PART 5 Measures relating to land management
26.Crop management
PART 6 Record keeping and compliance monitoring
27.Records required
28.Duty of the controller not to provide false or misleading information
PART 7 Enforcement
29.Enforcement
30.Notices
31.Appeals against notices requiring works etc.
32.Offences
33.Penalties
PART 8 Powers, duties and functions of the Department
34.Implementation Report
35.Reviewing the action programme
PART 9 Miscellaneous
36.Transitional provisions
37.Consequential amendments
38.Revocation and saving provisions
Signature
SCHEDULES
SCHEDULE 1
Livestock units of cattle
SCHEDULE 2
Criteria for nutrient management
SCHEDULE 3
Criteria as to nutrient management for phosphorus
SCHEDULE 4
Risk assessment for fertiliser application to steeply sloping land
1.If an application of organic manure (including livestock manure) or...
SCHEDULE 5
Soil test for Phosphorus
1.Reference to the results of a soil test is a...
2.The taking of soil samples and the analysis for phosphorus...
3.Soil sampling procedure
4.Time of sampling: Sampling every fourth year shall be satisfactory...
5.Depth of sampling: Grassland shall be sampled to a depth...
6.Method of sampling: A soil sample shall be made up...
7.Soil analysis for phosphorus
8.Air-drying and grinding soil: The entire soil sample shall be...
9.Soil analysis for Olsen extractable phosphorus: The measure of phosphorus...
10.Classification of soil analysis results into indices: The Olsen extractable...
SCHEDULE 6
Requirement for slurry storage systems
1.The requirements which have to be satisfied in relation to...
2.The base of the slurry storage tank, the base and...
3.The base and walls of the slurry storage tank, any...
4.The base and walls of the slurry storage tank and...
5.(1) Any facilities used for the temporary storage of slurry...
6.(1) Subject to sub-paragraph (2), the capacity of storage facilities...
7.(1) Subject to paragraphs (2) and (3), no part of...
8.The slurry storage tank and any effluent tank, channels, pipes...
9.Where the walls of the slurry tank are not impermeable,...
10.(1) Subject to sub-paragraph (2), where the slurry storage tank,...
11.In the case of a slurry storage tank with walls...
12.Any slurry storage tank constructed, substantially enlarged or substantially reconstructed...
SCHEDULE 7
Requirements for silos
1.The requirements which have to be satisfied in relation to...
2.The base of the silo shall, where the silo has...
3.(1) Subject to sub-paragraph (2), the capacity of the effluent...
4.The base of the silo, the base and walls of...
5.The base and any walls of the silo, its effluent...
6.No part of the silo, its effluent tank or channels...
7.If the silo has retaining walls— (a) the retaining walls...
8.Subject to paragraph 9, the silo, its effluent tank and...
9.Where any part of an effluent tank is installed below...
Explanatory Note