SCHEDULES
SCHEDULE 3 - TariffsTable 1
Tariff name | Sources of energy or Technology | Installation capacity | Tariff Pence/kWh |
---|---|---|---|
Small Biomass | Solid biomass including solid biomass contained in municipal solid waste and CHP | Less than 20kWth | 6.2 |
Medium Biomass | As above | 20kWth and above up to but not including 100kWth | 5.9 |
Large Biomass | As above | 100kWth and above up to but not including 1000kWth | 1.5 |
Small heat pumps | Ground source heat pump, water source heat pump, deep geothermal | Less than 20kWth | 8.4 |
Medium heat pumps | As above | 20kWth and above up to but not including 100kWth | 4.3 |
Large heat pumps | As above | 100kWth and above | 1.3 |
All Solar collectors | Solar collectors | Below 200kWth | 8.5 |
Biomethane and biogas combustion | Biomethane injection and biogas combustion | All biomethane injection and biogas combustion below 200kWth | 3.0 |