Search Legislation

The Renewables Obligation Order (Northern Ireland) 2009

Status:

This is the original version (as it was originally made).

Generating stations first commissioned before 1st January 1990

18.—(1) This Article applies to a generating station—

(a)which was first commissioned before 1st January 1990,

(b)the main components of which have not been renewed since 31st December 1989, and

(c)which is not a micro hydro generating station.

(2) No NIROCs are to be issued in respect of electricity generated in any month by a generating station to which this Article applies unless all of the electricity generated by that station during that month—

(a)Is generated—

(i)partly from fossil fuel, and

(ii)partly from renewable sources which consist wholly of—

(aa)biomass,

(bb)biomass and Solid Recovered Fuel, or

(cc)a liquid or gaseous fuel produced by means of gasification, pyrolysis or anaerobic digestion;

(b)is generated from biomass and the following conditions are met—

(i)where that station generated electricity in any month prior to April 2003, no less than 75 per cent of the energy content of the fuel used to generate that electricity was derived from fossil fuel,

(ii)the first month in which all of the electricity generated by that station was generated from biomass occurred after March 2004, and

(iii)in relation to electricity generated in any month after that first month by that station, no more than 75 per cent of the energy content of the fuel used to generate that electricity was derived from fossil fuel.

(3) For the purposes of paragraph (1)(b), the main components of a generating station are only to be regarded as having been renewed since 31st December 1989—

(a)in the case of a hydro generating station, where the following parts have been installed in the generating station after 31st December 1989 and were not used for the purpose of electricity generation prior to their installation—

(i)all the turbine runners or all the turbine blades or the propeller; and

(ii)all the inlet guide vanes or all the inlet guide nozzles;

(b)in the case of any other generating station, where all the boilers and turbines (driven by any means including wind, water, steam or gas) have been installed in the generating station after 31st December 1989 and were not used for the purpose of electricity generation prior to their installation.

(4) For the purposes of paragraph (2)—

(a)in sub-paragraph (a)(i) fossil fuel does not include waste which is a renewable source, and

(b)in determining whether or not the requirements of sub-paragraph (a) or (b) are met, no account is to be taken of any fossil fuel or waste which the generating station uses for permitted ancillary purposes.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources