xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

PART 2N.I.The Renewables Obligation

Determining the number of renewables obligation certificates to be produced in an obligation periodN.I.

11.—(1) Following the determination of [F1calculations A and B] for an obligation period, the Department is to determine the total number of renewables obligation certificates required to be produced by designated suppliers (“the total obligation”) for that period in accordance with paragraphs (2) to (5).

(2) Where calculation A is [F2equal to or] greater than calculation B for an obligation period, the total obligation for that period is calculation A.

(3) F3... Where calculation B is greater than calculation A for an obligation period, the total obligation for that period is calculation B.

F4(4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(5) References to the total obligation in Article 12 shall be construed accordingly.

F5(6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .