Options Considered
Three options were considered:
Do nothing – not feasible, as the existing provisions are not adequate to cope with the requirements of modern buildings and increasing EU demands,
Radical overhaul of the entire building regulations process – not necessary, as evidence indicates contentment with the current regime; and
Amend the existing Order and introduce new provisions as appropriate – the preferred option, given the nature of the amendments proposed.