Search Legislation

Commission Decision of 26 April 2011 concerning a technical specification for interoperability relating to the ‘infrastructure’ subsystem of the trans-European conventional rail system (notified under document C(2011) 2741) (Text with EEA relevance) (2011/275/EU) (repealed)

 Help about what version

What Version

More Resources

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Changes to legislation:

This version of this Decision was derived from EUR-Lex on IP completion day (31 December 2020 11:00 p.m.). It has not been amended by the UK since then. Find out more about legislation originating from the EU as published on legislation.gov.uk. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

  1. Introductory Text

  2. Article 1.. . . . . . . . . ....

  3. Article 2.. . . . . . . . . ....

  4. Article 3.. . . . . . . . . ....

  5. Article 4.. . . . . . . . . ....

  6. Article 5.. . . . . . . . . ....

  7. Article 6.. . . . . . . . . ....

  8. Article 7.. . . . . . . . . ....

  9. Article 8.. . . . . . . . . ....

  10. Article 9.. . . . . . . . . ....

  11. Article 10.. . . . . . . . . ....

    1. ANNEX

      1. . . . . . . . . . ....

      2. DIRECTIVE 2008/57/EC ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE COMMUNITY

        1. TECHNICAL SPECIFICATION FOR INTEROPERABILITY ‘Infrastructure’ subsystem for conventional rail

          1. 1. INTRODUCTION

            1. 1.1. Technical scope

            2. 1.2. Geographical scope

            3. 1.3. Content of this TSI

          2. 2. DEFINITION AND SCOPE OF SUBSYSTEM

            1. 2.1. Definition of the infrastructure subsystem

            2. 2.2. Interfaces of this TSI with other TSIs

            3. 2.3. Interfaces of this TSI with the persons with reduced mobility...

            4. 2.4. Interfaces of this TSI with the safety in railway tunnels...

            5. 2.5. Inclusion of infrastructure into the scope of the noise TSI...

          3. 3. ESSENTIAL REQUIREMENTS

          4. 4. DESCRIPTION OF THE INFRASTRUCTURE SUBSYSTEM

            1. 4.1. Introduction

              1. (1) . . . . . . . . . ....

              2. (2) Article 5(7) of the Directive says ‘the TSIs shall not...

              3. (3) . . . . . . . . . ....

              4. (4) . . . . . . . . . ....

            2. 4.2. Functional and technical specifications of subsystem

              1. 4.2.1. TSI categories of line

                1. (1) . . . . . . . . . ....

                2. (2) The requirements to be met by the infrastructure subsystem are...

                3. (3) . . . . . . . . . ....

                4. (4) . . . . . . . . . ....

              2. 4.2.2. Performance parameters

                1. (1) The performance levels of the TSI categories of line defined...

                2. (2) The performance levels for each TSI category of line are...

                3. (3) Article 5(7) of Directive 2008/57/EC states:

                4. (4) . . . . . . . . . ....

                5. (5) . . . . . . . . . ....

                6. (6) . . . . . . . . . ....

                7. (7) . . . . . . . . . ....

                8. (8) . . . . . . . . . ....

              3. 4.2.3. Basic parameters characterising the infrastructure subsystem

                1. 4.2.3.1. List of basic parameters

                  1. (1) . . . . . . . . . ....

                  2. A. Line layout:

                  3. B. Track parameters:

                  4. C. Switches and crossings

                  5. D. Track resistance to applied loads

                  6. E. Structures resistance to traffic loads

                  7. F. Track geometrical quality and limits on isolated defects

                  8. G. Platforms

                  9. H. Health, safety and environment

                  10. I. Provision for operation

                  11. J. Fixed installations for servicing trains

                2. 4.2.3.2. Requirements for basic parameters

                  1. (1) . . . . . . . . . ....

                  2. (2) . . . . . . . . . ....

                  3. (3) . . . . . . . . . ....

                  4. (4) . . . . . . . . . ....

                  5. (5) . . . . . . . . . ....

                  6. (6) . . . . . . . . . ....

                  7. (7) . . . . . . . . . ....

                  8. (8) . . . . . . . . . ....

              4. 4.2.4. Line layout

                1. 4.2.4.1. Structure gauge

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. (2) . . . . . . . . . ....

                    3. (3) . . . . . . . . . ....

                2. 4.2.4.2. Distance between track centres

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. (2) . . . . . . . . . ....

                    3. (3) . . . . . . . . . ....

                3. 4.2.4.3. Maximum gradients

                  1. TSI categories of line IV-P and VI-P

                    1. (1) Gradients as steep as 35 mm/m are permitted for main...

                    2. (2) . . . . . . . . . ....

                  2. TSI categories of line IV-F, IV-M, VI-F and VI-M

                    1. (3) . . . . . . . . . ....

                    2. (4) . . . . . . . . . ....

                    3. (5) . . . . . . . . . ....

                    4. (6) . . . . . . . . . ....

                  3. TSI categories of line V-P, V-F, V-M, VII-P, VII-F and...

                    1. (7) . . . . . . . . . ....

                  4. All TSI categories of line

                    1. (8) . . . . . . . . . ....

                    2. (9) . . . . . . . . . ....

                    3. (10) . . . . . . . . . ....

                4. 4.2.4.4. Minimum radius of horizontal curve

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. (2) . . . . . . . . . ....

                    3. (3) . . . . . . . . . ....

                    4. (4) . . . . . . . . . ....

                    5. (5) . . . . . . . . . ....

                5. 4.2.4.5. Minimum radius of vertical curve

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. (2) . . . . . . . . . ....

              5. 4.2.5. Track parameters

                1. 4.2.5.1. Nominal track gauge

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. (2) . . . . . . . . . ....

                2. 4.2.5.2. Cant

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. (2) . . . . . . . . . ....

                  2. TSI categories of line IV-P, V-P, VI-P and VII-P

                    1. (3) . . . . . . . . . ....

                  3. TSI categories of line IV-F, IV-M, V-F, V-M, VI-F, VI-M,...

                    1. (4) . . . . . . . . . ....

                  4. TSI categories of line IV-F, IV-M, VI-F and VI-M

                    1. (5) On curves with a radius less than 290 m, the...

                3. 4.2.5.3. Rate of change of cant (as a function of time)...

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. (2) . . . . . . . . . ....

                4. 4.2.5.4. Cant deficiency

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. 4.2.5.4.1. Cant deficiency on plain track and on the through route...

                      1. (1) . . . . . . . . . ....

                      2. (2) For trains which are not fitted with cant deficiency compensation...

                      3. (3) . . . . . . . . . ....

                    3. 4.2.5.4.2. Abrupt change of cant deficiency on diverging track of switches...

                      1. (1) The maximum design values of abrupt change of cant deficiency...

                      2. (2) . . . . . . . . . ....

                5. 4.2.5.5. Equivalent conicity

                  1. All TSI categories of line

                    1. (1) The limiting values for equivalent conicity quoted in Table 4...

                    2. 4.2.5.5.1. Design values for equivalent conicity

                      1. (1) Design values of track gauge, railhead profile and rail inclination...

                      2. (2) The following wheelsets shall be modelled passing over the designed...

                    3. 4.2.5.5.2. Requirements for controlling equivalent conicity in service

                      1. (1) . . . . . . . . . ....

                      2. (2) . . . . . . . . . ....

                      3. (3) The infrastructure manager shall maintain the mean track gauge on...

                      4. (4) . . . . . . . . . ....

                6. 4.2.5.6. Railhead profile for plain line

                  1. All TSI categories of line

                    1. (1) The design of railhead profiles for plain line shall comprise:...

                7. 4.2.5.7. Rail inclination

                  1. All TSI categories of line

                    1. 4.2.5.7.1. Plain line

                      1. (1) . . . . . . . . . ....

                      2. (2) . . . . . . . . . ....

                      3. (3) . . . . . . . . . ....

                    2. 4.2.5.7.2. Requirements for switches and crossings

                      1. (1) . . . . . . . . . ....

                      2. (2) . . . . . . . . . ....

                      3. (3) . . . . . . . . . ....

                      4. (4) . . . . . . . . . ....

                      5. (5) . . . . . . . . . ....

                8. 4.2.5.8. Track stiffness

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

              6. 4.2.6. Switches and crossings

                1. 4.2.6.1. Means of locking

                  1. TSI categories of line IV-P, IV-F, IV-M, VI-P, VI-F and...

                    1. (1) . . . . . . . . . ....

                  2. TSI categories of line V-P, V-F, V-M, VII-P, VII-F and...

                    1. (2) . . . . . . . . . ....

                2. 4.2.6.2. In-service geometry of switches and crossings

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. Figure 2 Point retraction in fixed common crossings

                    3. (2) The technical characteristics of switches and crossings shall comply with...

                    4. (3) . . . . . . . . . ....

                3. 4.2.6.3. Maximum unguided length of fixed obtuse crossings

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

              7. 4.2.7. Track resistance to applied loads

                1. 4.2.7.1. Track resistance to vertical loads

                  1. All TSI categories of line

                    1. (1) The track, including switches and crossings, shall be designed to...

                2. 4.2.7.2. Longitudinal track resistance

                  1. All TSI categories of line

                    1. 4.2.7.2.1. Design forces

                      1. (1) . . . . . . . . . ....

                      2. (2) . . . . . . . . . ....

                    2. 4.2.7.2.2. Compatibility with braking systems

                      1. (1) . . . . . . . . . ....

                      2. (2) . . . . . . . . . ....

                      3. (3) . . . . . . . . . ....

                3. 4.2.7.3. Lateral track resistance

                  1. All TSI categories of line

                    1. (1) The track, including switches and crossings, shall be designed to...

              8. 4.2.8. Structures resistance to traffic loads

                1. (1) . . . . . . . . . ....

                2. 4.2.8.1. Resistance of new bridges to traffic loads

                  1. All TSI categories of line — only for new structures...

                    1. 4.2.8.1.1. Vertical loads

                      1. (1) Structures shall be designed to support vertical loads in accordance...

                      2. (2) . . . . . . . . . ....

                      3. (3) The value of alpha (α) shall be equal to or...

                      4. (4) . . . . . . . . . ....

                    2. 4.2.8.1.2. Centrifugal forces

                      1. (1) . . . . . . . . . ....

                    3. 4.2.8.1.3. Nosing forces

                      1. (1) . . . . . . . . . ....

                    4. 4.2.8.1.4. Actions due to traction and braking (longitudinal loads)

                      1. (1) . . . . . . . . . ....

                    5. 4.2.8.1.5. Design track twist due to rail traffic actions

                      1. (1) . . . . . . . . . ....

                3. 4.2.8.2. Equivalent vertical loading for new earthworks and earth pressure effects...

                  1. All TSI categories of line — only for new structures...

                    1. (1) . . . . . . . . . ....

                    2. (2) . . . . . . . . . ....

                4. 4.2.8.3. Resistance of new structures over or adjacent to tracks

                  1. All TSI categories of line — only for new structures...

                    1. (1) . . . . . . . . . ....

                5. 4.2.8.4. Resistance of existing bridges and earthworks to traffic loads

                  1. All TSI categories of line — only for existing structures...

                    1. (1) . . . . . . . . . ....

                    2. (2) . . . . . . . . . ....

                    3. (3) The following cases are relevant:

                    4. (4) . . . . . . . . . ....

              9. 4.2.9. Track geometrical quality and limits on isolated defects

                1. 4.2.9.1. Determination of immediate action, intervention, and alert limits

                  1. All TSI categories of line

                    1. (1) The infrastructure manager shall determine appropriate immediate action, intervention and...

                    2. (2) . . . . . . . . . ....

                    3. (3) . . . . . . . . . ....

                    4. (4) . . . . . . . . . ....

                2. 4.2.9.2. The immediate action limit for track twist

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. (2) The track twist limit is a function of the measurement...

                    3. (3) . . . . . . . . . ....

                  2. TSI categories of line IV-F, IV-M, V-F, V-M, VI-F, VI-M,...

                    1. (4) If the radius of horizontal curve is less than 420...

                3. 4.2.9.3. The immediate action limit for variation of track gauge

                  1. All TSI categories of line

                4. 4.2.9.4. The immediate action limit for cant

                  1. TSI categories of line IV-P, V-P, VI-P and VII-P

                    1. (1) . . . . . . . . . ....

                  2. TSI categories of line IV-F, IV-M, V-F, V-M, VI-F, VI-M,...

                    1. (2) . . . . . . . . . ....

              10. 4.2.10. Platforms

                1. (1) . . . . . . . . . ....

                2. 4.2.10.1. Usable length of platforms

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. (2) . . . . . . . . . ....

                    3. (3) . . . . . . . . . ....

                3. 4.2.10.2. Width and edge of platforms

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                4. 4.2.10.3. End of platforms

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                5. 4.2.10.4. Height of platforms

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                6. 4.2.10.5. Offset of platforms

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

              11. 4.2.11. Health, safety and environment

                1. 4.2.11.1. Maximum pressure variations in tunnels

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                2. 4.2.11.2. Noise and vibration limits and mitigation measures

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. (2) . . . . . . . . . ....

                3. 4.2.11.3. Protection against electric shock

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                4. 4.2.11.4. Safety in railway tunnels

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                5. 4.2.11.5. Effect of crosswinds

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

              12. 4.2.12. Provision for operation

                1. 4.2.12.1. Distance markers

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. (2) . . . . . . . . . ....

              13. 4.2.13. Fixed installations for servicing trains

                1. 4.2.13.1. General

                  1. (1) . . . . . . . . . ....

                  2. (2) . . . . . . . . . ....

                2. 4.2.13.2. Toilet discharge

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                3. 4.2.13.3. Train external cleaning facilities

                  1. All TSI categories of line

                    1. (1) Where a washing plant is provided it shall be able...

                    2. (2) . . . . . . . . . ....

                4. 4.2.13.4. Water restocking

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                    2. (2) . . . . . . . . . ....

                    3. (3) . . . . . . . . . ....

                5. 4.2.13.5. Refuelling

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

                6. 4.2.13.6. Electrical shore supply

                  1. All TSI categories of line

                    1. (1) . . . . . . . . . ....

            3. 4.3. Functional and technical specification of the interfaces

              1. 4.3.1. Interfaces with the rolling stock subsystem

              2. 4.3.2. Interfaces with the energy subsystem

              3. 4.3.3. Interfaces with the control command and signalling subsystem

              4. 4.3.4. Interfaces with the operation and traffic management subsystem

            4. 4.4. Operating rules

              1. 4.4.1. Exceptional conditions relating to pre-planned works

                1. (1) . . . . . . . . . ....

              2. 4.4.2. Degraded operation

                1. (1) . . . . . . . . . ....

              3. 4.4.3. Protection of workers against aerodynamic effects

                1. (1) . . . . . . . . . ....

                2. (2) . . . . . . . . . ....

            5. 4.5. Maintenance plan

              1. 4.5.1. Before placing a line in service

                1. (1) A maintenance file shall be prepared setting out at least:...

              2. 4.5.2. After placing a line in service

                1. (1) The infrastructure manager shall have a maintenance plan containing the...

            6. 4.6. Professional competences

              1. (1) . . . . . . . . . ....

            7. 4.7. Health and safety conditions

              1. (1) . . . . . . . . . ....

            8. 4.8. Register of infrastructure and European register of authorised types of...

          5. 5. INTEROPERABILITY CONSTITUENTS

            1. 5.1. Basis on which interoperability constituents have been selected

              1. (1) . . . . . . . . . ....

              2. (2) . . . . . . . . . ....

            2. 5.2. List of constituents

              1. (1) For the purposes of this technical specification for interoperability, only...

              2. (2) . . . . . . . . . ....

              3. (3) . . . . . . . . . ....

            3. 5.3. Constituents performances and specifications

              1. 5.3.1. The rail

                1. (1) The specifications of the ‘rail’ interoperability constituent are the following:...

                2. 5.3.1.1. Railhead profile

                  1. (1) . . . . . . . . . ....

                  2. (2) . . . . . . . . . ....

                3. 5.3.1.2. Moment of inertia of the rail cross section

                  1. (1) . . . . . . . . . ....

                  2. (2) . . . . . . . . . ....

                4. 5.3.1.3. Rail hardness

                  1. (1) . . . . . . . . . ....

                  2. (2) . . . . . . . . . ....

              2. 5.3.2. The rail fastening systems

                1. (1) . . . . . . . . . ....

                2. (2) The rail fastening system shall comply in laboratory test conditions...

              3. 5.3.3. Track sleepers

                1. (1) . . . . . . . . . ....

          6. 6. ASSESSMENT OF CONFORMITY OF INTEROPERABILITY CONSTITUENTS AND EC VERIFICATION OF...

            1. 6.1. Interoperability constituents

              1. 6.1.1. Conformity assessment procedures

                1. (1) . . . . . . . . . ....

              2. 6.1.2. Application of modules

                1. (1) The following modules for conformity assessment of interoperability constituents are...

                2. (2) The modules for conformity assessment of interoperability constituents shall be...

                3. (3) . . . . . . . . . ....

                4. (4) . . . . . . . . . ....

              3. 6.1.3. Innovative solutions for interoperability constituents

                1. (1) . . . . . . . . . ....

                2. (2) . . . . . . . . . ....

                3. (3) . . . . . . . . . ....

                4. (4) . . . . . . . . . ....

              4. 6.1.4. EC declaration of conformity for interoperability constituents

                1. 6.1.4.1. Interoperability constituents subject to other Community Directives

                  1. (1) . . . . . . . . . ....

                  2. (2) . . . . . . . . . ....

                2. 6.1.4.2. EC declaration of conformity for the rail

                  1. (1) . . . . . . . . . ....

                3. 6.1.4.3. EC declaration of conformity for rail fastening systems

                  1. (1) The EC declaration of conformity shall be accompanied by statement...

                4. 6.1.4.4. EC declaration of conformity for track sleepers

                  1. (1) . . . . . . . . . ....

            2. 6.2. Infrastructure subsystem

              1. 6.2.1. General provisions

                1. (1) . . . . . . . . . ....

                2. (2) . . . . . . . . . ....

                3. (3) . . . . . . . . . ....

                4. (4) . . . . . . . . . ....

              2. 6.2.2. Application of modules

                1. (1) For the EC verification procedure of the infrastructure subsystem, the...

                2. 6.2.2.1. Application of module SG

                  1. (1) . . . . . . . . . ....

                3. 6.2.2.2. Application of module SH1

                  1. (1) . . . . . . . . . ....

              3. 6.2.3. Innovative solutions

                1. (1) . . . . . . . . . ....

                2. (2) . . . . . . . . . ....

                3. (3) . . . . . . . . . ....

                4. (4) . . . . . . . . . ....

              4. 6.2.4. Particular assessment procedures for subsystem

                1. 6.2.4.1. Assessment of structure gauge

                  1. (1) . . . . . . . . . ....

                2. 6.2.4.2. Assessment of distance between track centres

                  1. (1) . . . . . . . . . ....

                3. 6.2.4.3. Assessment of cant deficiency

                  1. (1) . . . . . . . . . ....

                  2. (2) . . . . . . . . . ....

                4. 6.2.4.4. Assessment of design values for equivalent conicity

                  1. (1) . . . . . . . . . ....

                5. 6.2.4.5. Assessment of minimum value of mean track gauge

                  1. (1) . . . . . . . . . ....

                6. 6.2.4.6. Assessment of maximum pressure variations in tunnels

                  1. (1) . . . . . . . . . ....

                  2. (2) . . . . . . . . . ....

                  3. (3) The reference cross section areas of the interoperable trains to...

                  4. (4) . . . . . . . . . ....

                7. 6.2.4.7. Assessment of geometry of switches and crossings

                  1. (1) . . . . . . . . . ....

                  2. (2) . . . . . . . . . ....

                8. 6.2.4.8. Assessment of new structures

                  1. (1) . . . . . . . . . ....

                9. 6.2.4.9. Assessment of existing structures

                  1. (1) . . . . . . . . . ....

                10. 6.2.4.10. Assessment of fixed installations for servicing trains

                  1. (1) . . . . . . . . . ....

              5. 6.2.5. Technical solutions giving presumption of conformity at design phase

                1. 6.2.5.1. Assessment of track resistance for plain line

                  1. (1) Plain line ballasted track conforming to the following characteristics is...

                2. 6.2.5.2. Assessment of track resistance for switches and crossings

                  1. (1) Switches and crossings in ballasted track conforming to the following...

            3. 6.3. EC verification when speed is used as a migration criterion...

              1. (1) . . . . . . . . . ....

              2. (2) Some limiting values set out in Chapter 4 depend on...

              3. (3) . . . . . . . . . ....

              4. (4) . . . . . . . . . ....

            4. 6.4. Assessment of maintenance plan

              1. (1) . . . . . . . . . ....

              2. (2) . . . . . . . . . ....

              3. (3) . . . . . . . . . ....

            5. 6.5. Assessment of Register of Infrastructure

              1. (1) . . . . . . . . . ....

            6. 6.6. Subsystems containing interoperability constituents not holding an EC declaration

              1. 6.6.1. Conditions

                1. (1) During the transition period provided for in Article 6 of...

                2. (2) . . . . . . . . . ....

              2. 6.6.2. Documentation

                1. (1) . . . . . . . . . ....

                2. (2) The EC declaration of verification of the subsystem shall indicate...

              3. 6.6.3. Maintenance of the subsystems certified according to 6.6.1

                1. (1) . . . . . . . . . ....

                2. (2) . . . . . . . . . ....

          7. 7. IMPLEMENTING THE INFRASTRUCTURE TSI

            1. 7.1. Application of this TSI to conventional rail lines

              1. (1) . . . . . . . . . ....

              2. (2) . . . . . . . . . ....

            2. 7.2. Application of this TSI to new conventional rail lines

              1. (1) . . . . . . . . . ....

              2. (2) . . . . . . . . . ....

              3. (3) . . . . . . . . . ....

              4. (4) The following situations, for example to increase speed or capacity,...

            3. 7.3. Application of this TSI to existing conventional rail lines

              1. 7.3.1. Upgrading of a line

                1. (1) . . . . . . . . . ....

                2. (2) The infrastructure subsystem of a line is considered to be...

                3. (3) . . . . . . . . . ....

                4. (4) . . . . . . . . . ....

                5. (5) . . . . . . . . . ....

              2. 7.3.2. Renewal of a line

                1. (1) . . . . . . . . . ....

                2. (2) . . . . . . . . . ....

                3. (3) . . . . . . . . . ....

                4. (4) . . . . . . . . . ....

                5. (5) . . . . . . . . . ....

              3. 7.3.3. Substitution in the framework of maintenance

                1. (1) . . . . . . . . . ....

                2. (2) . . . . . . . . . ....

                3. (3) In order to get a valuable part of the infrastructure...

                4. (4) . . . . . . . . . ....

              4. 7.3.4. Existing lines that are not subject to a renewal or...

                1. (1) . . . . . . . . . ....

                2. (2) . . . . . . . . . ....

            4. 7.4. Speed as migration criterion

              1. (1) . . . . . . . . . ....

              2. (2) . . . . . . . . . ....

              3. (3) . . . . . . . . . ....

            5. 7.5. Compatibility of infrastructure and rolling stock

              1. (1) . . . . . . . . . ....

              2. (2) . . . . . . . . . ....

              3. (3) . . . . . . . . . ....

              4. (4) . . . . . . . . . ....

            6. 7.6. Specific cases

              1. 7.6.1. Particular features on the Estonian network

              2. 7.6.2. Particular features on the Finnish network

                1. 7.6.2.1. Structure gauge (4.2.4.1)

                  1. P cases

                    1. All TSI categories of line — clauses (1) and (2)...

                      1. (1) . . . . . . . . . ....

                      2. (2) . . . . . . . . . ....

                2. 7.6.2.2. Minimum radius of horizontal curve (4.2.4.4)

                  1. P cases

                    1. All TSI categories of line — clause (4)

                      1. (4) . . . . . . . . . ....

                3. 7.6.2.3. Nominal track gauge (4.2.5.1)

                  1. P cases

                    1. All TSI categories of line — clause (1)

                      1. (1) . . . . . . . . . ....

                4. 7.6.2.4. Design values for equivalent conicity (4.2.5.5.1)

                  1. P cases

                    1. All TSI categories of line — clause (2)

                      1. (2) For the nominal track gauge of 1 524 mm the...

                5. 7.6.2.5. Requirements for controlling equivalent conicity in service (4.2.5.5.2)

                  1. P cases

                    1. All TSI categories of line — Table 5

                6. 7.6.2.6. In-service geometry of switches and crossings (4.2.6.2)

                  1. P cases

                    1. All TSI categories of line — clause (2)

                      1. (2) The technical characteristics of switches and crossings for the nominal...

              3. 7.6.3. Particular features on the Hellenic network

                1. 7.6.3.1. Performance parameters (4.2.2)

                  1. P cases

                    1. All TSI categories of line — clauses (2), (6) and...

                      1. (2) . . . . . . . . . ....

                      2. (6) . . . . . . . . . ....

                      3. (7) . . . . . . . . . ....

                2. 7.6.3.2. Structure gauge (4.2.4.1)

                  1. P cases

                    1. All TSI categories of line — clauses (1) and (2)...

                      1. (1) . . . . . . . . . ....

                3. 7.6.3.3. Distance between track centres (4.2.4.2)

                  1. P cases

                    1. All TSI categories of line — clause (1) and (2)...

                      1. (1) . . . . . . . . . ....

                4. 7.6.3.4. Maximum gradients (4.2.4.3)

                  1. P cases

                    1. TSI categories of line IV-F, IV-M, VI-F and VI-M —...

                      1. (3) . . . . . . . . . ....

                5. 7.6.3.5. Minimum radius of horizontal curve (4.2.4.4)

                  1. P cases

                    1. All TSI categories of line — clause (2)

                      1. (2) . . . . . . . . . ....

                6. 7.6.3.6. Minimum radius of vertical curve (4.2.4.5)

                  1. P cases

                    1. All TSI categories of line — clause (1)

                      1. (1) . . . . . . . . . ....

                7. 7.6.3.7. Nominal track gauge (4.2.5.1)

                  1. P cases

                    1. All TSI categories of line — clause (1)

                      1. (1) . . . . . . . . . ....

                8. 7.6.3.8. In-service geometry of switches and crossings (4.2.6.2)

                  1. P cases

                    1. All TSI categories of line — clause (2)

                      1. (2) The technical characteristics of switches and crossings for the nominal...

                9. 7.6.3.9. Track resistance to vertical loads (4.2.7.1)

                  1. P cases

                    1. All TSI categories of line — clause (a)

                      1. (a) . . . . . . . . . ....

                10. 7.6.3.10. Resistance of new bridges to traffic loads (4.2.8.1) — vertical...

                  1. P cases

                    1. All TSI categories of line — only for new structures...

                      1. (3) . . . . . . . . . ....

              4. 7.6.4. Particular features on the Irish network

                1. 7.6.4.1. Performance parameters (4.2.2) — clause (2) — Table 3, column...

                  1. (2) . . . . . . . . . ....

                2. 7.6.4.2. Structure gauge (4.2.4.1)

                  1. P cases

                    1. TSI categories of line IV-P, IV-F, IV-M, VI-P, VI-F and...

                      1. (1) . . . . . . . . . ....

                    2. TSI categories of line V-P, V-F, V-M, VII-P, VII-F and...

                      1. (1) . . . . . . . . . ....

                3. 7.6.4.3. Distance between track centres (4.2.4.2)

                  1. P cases

                    1. TSI categories of line IV-P, IV-F, IV-M, VI-P, VI-F and...

                      1. (1) . . . . . . . . . ....

                    2. TSI categories of line V-P, V-F, V-M, VII-P, VII-F and...

                      1. (1) . . . . . . . . . ....

                4. 7.6.4.4. Nominal track gauge (4.2.5.1)

                  1. P cases

                    1. All TSI categories of line — clause (1)

                      1. (1) . . . . . . . . . ....

                5. 7.6.4.5. Design values for equivalent conicity (4.2.5.5.1)

                  1. P cases

                    1. All TSI categories of line — clause (2)

                      1. (2) For the nominal track gauge of 1 600 mm the...

                6. 7.6.4.6. Requirements for controlling equivalent conicity in service (4.2.5.5.2)

                  1. P cases

                    1. All TSI categories of line — Table 5

                7. 7.6.4.7. In-service geometry of switches and crossings (4.2.6.2)

                  1. P cases

                    1. All TSI categories of line — clause (2)

                      1. (2) The technical characteristics of switches and crossings for the nominal...

              5. 7.6.5. Particular features on the Latvian network

              6. 7.6.6. Particular features on the Lithuanian network

              7. 7.6.7. Particular features on the Polish network

                1. 7.6.7.1. Structure gauge (4.2.4.1)

                  1. P cases

                    1. All TSI categories of line — clauses (1) and (2)...

                      1. (1) . . . . . . . . . ....

                2. 7.6.7.2. Nominal track gauge (4.2.5.1)

                  1. P cases

                    1. All TSI categories of line — additional clause (3)

                      1. (3) . . . . . . . . . ....

                3. 7.6.7.3. Design values for equivalent conicity (4.2.5.5.1)

                  1. P cases

                    1. All TSI categories of line — clause (2)

                      1. (2) For the nominal track gauge of 1 520 mm the...

                4. 7.6.7.4. Requirements for controlling equivalent conicity in service (4.2.5.5.2)

                  1. P cases

                    1. All TSI categories of line — Table 5

                5. 7.6.7.5. In-service geometry of switches and crossings (4.2.6.2)

                  1. P cases

                    1. All TSI categories of line — clause (2)

                      1. (2) The technical characteristics of switches and crossings for the nominal...

                6. 7.6.7.6. Maximum unguided length of fixed obtuse crossings (4.2.6.3)

                  1. P cases

                    1. All TSI categories of line — clause (1)

                      1. (1) . . . . . . . . . ....

              8. 7.6.8. Particular features on the Portuguese network

                1. 7.6.8.1. Structure gauge (4.2.4.1)

                  1. P cases

                    1. All TSI categories of line — clauses (1) and (2)...

                2. 7.6.8.2. Nominal track gauge (4.2.5.1)

                  1. P cases

                    1. All TSI categories of line — clause (1)

                      1. (1) . . . . . . . . . ....

                3. 7.6.8.3. Design values for equivalent conicity (4.2.5.5.1)

                  1. P cases

                    1. All TSI categories of line — clause (2)

                      1. (2) For the nominal track gauge of 1 668 mm the...

                4. 7.6.8.4. Requirements for controlling equivalent conicity in service (4.2.5.5.2)

                  1. P cases

                    1. All TSI categories of line — Table 5

                5. 7.6.8.5. In-service geometry of switches and crossings (4.2.6.2)

                  1. P cases

                    1. All TSI categories of line — clause (2)

              9. 7.6.9. Particular features on the Romanian network

                1. 7.6.9.1. In-service geometry of switches and crossings (4.2.6.2)

                  1. P cases

                    1. All TSI categories of line — clause (2)(f)

                      1. (2)(f) . . . . . . . . . ....

              10. 7.6.10. Particular features on the Spanish network

                1. 7.6.10.1. Structure gauge (4.2.4.1)

                  1. P cases

                    1. TSI categories of line V-P, V-F, V-M, VII-P, VII-F and...

                      1. (1) . . . . . . . . . ....

                    2. All TSI categories of line — additional clause (4)

                      1. (4) . . . . . . . . . ....

                2. 7.6.10.2. Distance between track centres (4.2.4.2)

                  1. P cases

                    1. TSI categories of line IV-P, IV-F, IV-M, VI-P, VI-F and...

                      1. (1) The distance between track centres such for 1 668 mm...

                    2. TSI categories of line V-P, V-F, V-M, VII-P, VII-F and...

                      1. (1) The minimum distance between track centres such for 1 668...

                3. 7.6.10.3. Maximum gradients (4.2.4.3)

                  1. P cases

                    1. TSI categories of line IV-F, IV-M, VI-F and VI-M —...

                      1. (3) . . . . . . . . . ....

                4. 7.6.10.4. Nominal track gauge (4.2.5.1)

                  1. P cases

                    1. All TSI categories of line — clause (1) and additional...

                      1. (1) . . . . . . . . . ....

                      2. (3) . . . . . . . . . ....

                5. 7.6.10.5. Design values for equivalent conicity (4.2.5.5.1)

                  1. All TSI categories of line — clause (2)

                    1. (2) For the nominal track gauge of 1 668 mm the...

                6. 7.6.10.6. Requirements for controlling equivalent conicity in service (4.2.5.5.2)

                  1. P cases

                    1. All TSI categories of line — Table 5

                7. 7.6.10.7. In-service geometry of switches and crossings (4.2.6.2)

                  1. P cases

                    1. All TSI categories of line — clause (2)

              11. 7.6.11. Particular features on the Swedish network

              12. 7.6.12. Particular features on the UK network for Great Britain

                1. 7.6.12.1. Performance parameters (4.2.2)

                  1. P cases

                    1. All TSI categories of line — clause (7)

                      1. (7) The published information relating to axle load shall use the...

                2. 7.6.12.2. Structure gauge (4.2.4.1)

                  1. P cases

                    1. TSI categories of line V-P, V-F, V-M, VII-P, VII-F and...

                      1. (1) For the upgrading or renewal of conventional lines with respect...

                3. 7.6.12.3. Distance between track centres (4.2.4.2)

                  1. P cases

                    1. TSI categories of line V-P, V-F, V-M, VII-P, VII-F and...

                      1. (1) The nominal distance between track centres shall be 3 400...

                4. 7.6.12.4. Nominal track gauge (4.2.5.1)

                  1. P cases

                    1. TSI categories of line V-P, V-F, V-M, VII-P, VII-F and...

                      1. (3) . . . . . . . . . ....

                5. 7.6.12.5. In-service geometry of switches and crossings (4.2.6.2)

                  1. P cases

                    1. TSI categories of line V-P, V-F, V-M, VII-P, VII-F and...

                      1. (4) . . . . . . . . . ....

              13. 7.6.13. Particular features on the UK network for Northern Ireland

      3. ANNEX A

        1. ASSESSMENT OF INTEROPERABILITY CONSTITUENTS

      4. ANNEX B

        1. ASSESSMENT OF THE INFRASTRUCTURE SUBSYSTEM

      5. ANNEX C

        1. CAPABILITY REQUIREMENTS FOR STRUCTURES ACCORDING TO TSI CATEGORY OF LINE...

      6. ANNEX D

        1. ITEMS TO BE INCLUDED IN THE REGISTER OF INFRASTRUCTURE

      7. ANNEX E

        1. CAPABILITY REQUIREMENTS FOR STRUCTURES ACCORDING TO TSI CATEGORY OF LINE...

      8. ANNEX F

        1. LIST OF OPEN POINTS

      9. ANNEX G

        1. GLOSSARY

      10. ANNEX H

        1. LIST OF REFERENCED STANDARDS

Back to top

Options/Help

Print Options

You have chosen to open the Whole Decision

The Whole Decision you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources