Search Legislation

Council Directive 1999/31/ECShow full title

Council Directive 1999/31/EC of 26 April 1999 on the landfill of waste

 Help about what version

What Version

Close

This is a legislation item that originated from the EU

After exit day there will be three versions of this legislation to consult for different purposes. The legislation.gov.uk version is the version that applies in the UK. The EU Version currently on EUR-lex is the version that currently applies in the EU i.e you may need this if you operate a business in the EU.

The web archive version is the official version of this legislation item as it stood on exit day before being published to legislation.gov.uk and any subsequent UK changes and effects applied. The web archive also captured associated case law and other language formats from EUR-Lex.

Status:

EU Directives are being published on this site to aid cross referencing from UK legislation. After IP completion day (31 December 2020 11pm) no further amendments will be applied to this version.

  1. Introductory Text

  2. Article 1.Overall objective

  3. Article 2.Definitions

  4. Article 3.Scope

  5. Article 4.Classes of landfill

  6. Article 5.Waste and treatment not acceptable in landfills

  7. Article 5a. Rules on the calculation of the attainment of the targets

  8. Article 5b. Early warning report

  9. Article 5c. Exchange of information and best practices

  10. Article 6.Waste to be accepted in the different classes of landfill

  11. Article 7.Application for a permit

  12. Article 8.Conditions of the permit

  13. Article 9.Content of the permit

  14. Article 10.Cost of the landfill of waste

  15. Article 11.Waste acceptance procedures

  16. Article 12.Control and monitoring procedures in the operational phase

  17. Article 13.Closure and after-care procedures

  18. Article 14.Existing landfill sites

  19. Article 15. Reporting

  20. Article 15a. Instruments to promote a shift to a more circular economy

  21. Article 15b. Determination of the permeability coefficient for landfills

  22. Article 15c. Union standard for sampling of waste

  23. Article 16. Review of the Annexes

  24. Article 17. Committee procedure

  25. Article 18.Transposition

  26. Article 19.Entry into force

  27. Article 20.Addressees

    1. ANNEX I

      GENERAL REGUIREMENTS FOR ALL CLASSES OF LANDFILLS

      1. 1. Location

        1. 1.1. The location of a landfill must take into consideration requirements...

        2. 1.2. The landfill can be authorised only if the characteristics of...

      2. 2. Water control and leachate management

      3. 3. Protection of soil and water

        1. 3.1. A landfill must be situated and designed so as to...

        2. 3.2. The geological barrier is determined by geological and hydrogeological conditions...

        3. 3.3. In addition to the geological barrier described above a leachate...

        4. 3.4. If, on the basis of an assessment of environmental risks...

        5. 3.5. . . . . . . . . . ....

      4. 4. Gas control

        1. 4.1. Appropriate measures shall be taken in order to control the...

        2. 4.2. Landfill gas shall be collected from all landfills receiving biodegradable...

        3. 4.3. The collection, treatment and use of landfill gas under paragraph...

      5. 5. Nuisances and hazards

      6. 6. Stability

      7. 7. Barriers

      8. 8. Temporary storage of metallic mercury

    2. ANNEX II

      WASTE ACCEPTANCE CRITERIA AND PROCEDURES

      1. 1. Introduction

      2. 2. General principles

      3. 3. General procedures for testing and acceptance of waste

      4. 4. Guidelines for preliminary waste acceptance procedures

      5. 5. Sampling of waste

      6. 6. Specific requirements for metallic mercury

    3. ANNEX III

      CONTROL AND MONITORING PROCEDURES IN OPERATION AND AFTER-CARE PHASES

      1. 1. Introduction

      2. 2. Meteorological data

      3. 3. Emission data: water, leachate and gas control

      4. 4. Protection of groundwater

        1. A. Sampling

        2. B. Monitoring

        3. C. Trigger levels

      5. 5. Topography of the site: data on the landfill body

      6. 6. Specific requirements for metallic mercury

    4. ANNEX IV

      IMPLEMENTATION PLAN TO BE SUBMITTED PURSUANT TO ARTICLE 5(6)

      1. The implementation plan to be submitted pursuant to Article 5(6)...

      2. assessment of the past, current and projected rates of recycling,...

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources