CHAPTER VIIIU.K. PUBLICATION REQUIREMENTS

Article 31U.K.Form of publication

1.The information referred to in Articles 29 and 30 shall be published as set out in Article 32 via F1... the website of the respective entity.

Such information shall be accessible to the public, free of charge and of any limitations as to its use. It shall be published:

(a)in a user-friendly manner;

(b)in a clear, easily accessible way and on a non-discriminatory basis;

(c)in a downloadable format;

F2(d). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2.The following information shall be published for interconnection points [F3by the national regulatory authority or the transmission system operator, as decided by the national regulatory authority, on the respective entity's website]:

(a)at the same time as set out in Article 29, the reserve prices for standard capacity products for firm capacity and for standard capacity products for interruptible capacity;

(b)at the same time as set out in Article 30, a flow-based charge referred to in Article 4(3)(a), where applied.

3.The information referred to in paragraph 2 shall be published in the following manner:

(a)as set out in paragraph 1(a) to (c);

F4(b). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(c)in a standardised table which shall include at least the following information:

(i)

the interconnection point;

(ii)

the direction of the gas flow;

(iii)

the names of the relevant transmission system operators;

(iv)

the start and the end time of the product;

(v)

whether the capacity is firm or interruptible;

(vi)

the indication of the standard capacity product;

(vii)

the applicable tariff per kWh/h and per kWh/d in [F5pounds sterling ] taking into account the following:

(1)

where the applied capacity unit is kWh/h, the information on the applicable tariff per kWh/d shall be non-binding, and vice versa;

(2)

F6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

In addition, at the same time as set out in Article 30, such standardised table shall include the simulation of all the costs for flowing 1 GWh/day/year for each interconnection point in [F7pounds sterling] subject to point vii(2).

F84.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .