- Latest available (Revised)
- Original (As adopted by EU)
Commission Regulation (EU) 2017/2196 of 24 November 2017 establishing a network code on electricity emergency and restoration (Text with EEA relevance)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
There are currently no known outstanding effects by UK legislation for Commission Regulation (EU) 2017/2196, Article 11.![]()
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
1.By 18 December 2018, each TSO shall design a system defence plan in consultation with relevant DSOs, SGUs, [F1the regulatory authority] and the other TSOs in its synchronous area.
2.When designing its system defence plan, each TSO shall take into account at least the following elements:
(a)the operational security limits set out in accordance with Article 25 of Regulation (EU) 2017/1485;
(b)the behaviour and capabilities of load and generation within the synchronous area;
(c)the specific needs of the high priority significant grid users listed pursuant to point (d) of paragraph 4; and
(d)the characteristics of its transmission system and of the underlying DSOs systems.
3.The system defence plan shall contain at least the following provisions:
(a)the conditions under which the system defence plan is activated, in accordance with Article 13;
(b)the system defence plan instructions to be issued by the TSO; and
(c)the measures subject to real-time consultation or coordination with the identified parties.
4.In particular, the system defence plan shall include the following elements:
(a)a list of the measures to be implemented by the TSO on its installations;
(b)a list of the measures to be implemented by DSOs and of the DSOs responsible for implementing those measures on their installations;
(c)a list of the SGUs responsible for implementing on their installations the measures that result from the mandatory requirements set out in Regulation (EU) 2016/631, (EU) 2016/1388 and (EU) 2016/1447 or from national legislation and a list of the measures to be implemented by those SGUs;
(d)a list of high priority significant grid users and the terms and conditions for their disconnection, and
(e)the implementation deadlines for each measure listed in the system defence plan.
5.The system defence plan shall include at least the following technical and organisational measures specified in Section 2 of Chapter II:
(a)system protection schemes including at least:
automatic under-frequency control scheme in accordance with Article 15;
automatic over-frequency control scheme in accordance with Article 16; and
automatic scheme against voltage collapse in accordance with Article 17.
(b)system defence plan procedures, including at least:
frequency deviation management procedure in accordance with Article 18;
voltage deviation management procedure in accordance with Article 19;
power flow management procedure in accordance with Article 20;
assistance for active power procedure in accordance with Article 21; and
manual demand disconnection procedure in accordance with Article 22.
6.The measures contained in the system defence plan shall comply with the following principles:
(a)their impact on the system users shall be minimal;
(b)they shall be economically efficient;
(c)only those measures that are necessary shall be activated; and
(d)they shall not lead the TSO's transmission system or the interconnected transmission systems into emergency state or blackout state.
Textual Amendments
F1Words in Art. 11(1) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 2 para. 11 (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.
The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.
For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: