- Latest available (Revised)
- Point in Time (31/01/2020)
- Original (As adopted by EU)
Regulation (EU) 2017/1938 of the European Parliament and of the Council of 25 October 2017 concerning measures to safeguard the security of gas supply and repealing Regulation (EU) No 994/2010 (Text with EEA relevance)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
Version Superseded: 31/12/2020
Point in time view as at 31/01/2020.
There are currently no known outstanding effects by UK legislation for Regulation (EU) 2017/1938 of the European Parliament and of the Council, ANNEX V.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Name of the competent authority responsible for the preparation of the present risk assessment(1).
the main gas consumption figures(3): annual final gas consumption (bcm and MWh) and breakdown per type of customers(4), peak demand (total and breakdown per category of consumer in mcm/d);
a description of the functioning of the gas system(s) in the relevant risk groups: main flows (entry/exit/transit), entry/exit point's infrastructure capacity to and out of the risk groups' region(s) and per Member State, including utilisation rate, LNG facilities (maximal daily capacity, utilisation rate and access regime), etc.;
a breakdown, to the extent possible, of percentage gas import sources per country of origin(5);
a description of the role of storage facilities relevant for the risk group, including cross-border access:
the storage capacity (total and working gas) compared to heating season demand;
the maximal daily withdrawal capacity at different filling levels (ideally with full storages and end-of-season levels);
a description of the role of domestic production in the risk group(s):
the volume of production with regard to the annual final gas consumption;
the maximal daily production capacity and description of how it can cover maximum daily consumption;
a description of the role of gas in the electricity production (e.g. importance, role as a back-up for renewables), including gas-fired generating capacity (total (MWe) and as percentage of the total generating capacity) and cogeneration (total (MWe) and as percentage of the total generating capacity).
the main gas consumption figures: annual final gas consumption (bcm) and breakdown by type of customers, peak demand (mcm/d);
a description of the functioning of the gas system at national level, including infrastructure (to the extent not covered by point 1.1(b)). If applicable, include L-gas system;
the identification of the key infrastructure relevant for the security of gas supply;
a breakdown, to the extent possible, at national level of gas import sources per country of origin;
a description of the role of storage and include:
the storage capacity (total and working) compared to heating season demand;
the maximal daily withdrawal capacity at different filling levels (ideally with full storages and end-of-season levels);
a description of the role of domestic production and include:
the volume of production with regard to the annual final gas consumption;
the maximal daily production capacity;
a description of the role of gas in the electricity production (e.g. importance, role as a back-up for renewables), including gas-fired generating capacity (total (MWe) and as percentage of the total generating capacity) and cogeneration (total (MWe) and as percentage of the total generating capacity).
Describe how the infrastructure standard is complied with, including the main values used for the N – 1 formula and alternative options for its compliance (with directly connected Member States, demand-side measures) and the existing bidirectional capacities, as follows:
N – 1 formula
the identification of the single largest gas infrastructure;
the calculation of the N – 1 formula at national level;
a description of the values used for all elements in the N – 1 formula, including intermediate values used for their calculation (e.g. for EPm indicate the capacity of all entry points considered under this parameter);
an indication of the methodologies used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations);
an explanation of the results of the calculation of the N – 1 formula considering the level of storages at 30 % and 100 % of the maximum working volume;
an explanation of the main results of the simulation of the N – 1 formula using a hydraulic model;
if so decided by the Member State, a calculation of the N – 1 formula using demand-side measures:
calculation of the N – 1 formula in accordance with point 2 of Annex II,
description of the values used for all elements in the N – 1 formula, including intermediate figures used for the calculation (if different to the figures described under point 2(a)(iii)),
indicate the methodologies used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations),
explain the market-based demand-side measures adopted/to be adopted to compensate a disruption of gas supply and its expected impact (Deff);
if so agreed with the competent authorities of the relevant risk group(s) or with directly connected Member States, joint calculation(s) of the N – 1 formula:
calculation of the N – 1 formula in accordance with point 5 of Annex II,
description of the values used for all elements in the N – 1 formula, including intermediate values used for their calculation (if different to the figures described under point 2(a)(iii)),
indicate the methodologies and assumptions used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations),
explain the agreed arrangements to ensure compliance with the N – 1 formula;
bi-directional capacity
indicate the interconnection points equipped with bidirectional capacity and the maximal capacity of bi-directional flows;
indicate the arrangements governing the use of the reverse flow capacity (e.g. interruptible capacity);
indicate interconnection points where an exemption has been granted in accordance with Article 5(4), the duration of the exemption and the grounds on which it was granted.
Describe the risk factors which could have negative impact on the security of gas supply in the Member State, their likelihood and consequences.
Non-exhaustive list of types of risk factors that have to be included in the assessment only if applicable according to the competent authority:
political
gas disruption from third countries because of different reasons,
political unrest (either in country of origin or in transit country),
war/civil war (either in country of origin or in transit country),
terrorism;
technological
explosion/fires,
fires (internal to a given facility),
leakages,
lack of adequate maintenance,
equipment malfunction (failure to start, failure during working time, etc.),
lack of electricity (or other energy source),
ICT failure (hardware or software failure, internet, SCADA problems, etc.),
cyber-attack,
impact due to excavation works (digging, piling), ground works, etc.;
commercial/market/financial
agreements with third-country suppliers,
commercial dispute,
control of infrastructure relevant for the security of gas supply by third-country entities, which may imply, among others, risks of underinvestment, undermining diversification or non-respect of Union law,
price volatility,
underinvestment,
sudden, unexpected peak demand,
other risks which could lead to structural underperformance;
social
strikes (in different related sectors, such as the gas sector, ports, transport, etc.),
sabotage,
vandalism,
theft;
natural
earthquakes,
landslides,
floods (heavy rain, river),
storms (sea),
avalanches,
extreme weather conditions,
fires (external to the facility, like nearby forests, grassland, etc.).
identify the relevant risk factors for the Member State, including their likelihood and impact;
describe the criteria used to determine whether a system is exposed to high/unacceptable risks;
set a list of relevant risk scenarios in accordance with the risk factors and their likelihood and describe how the selection was made.
Analyse the set of relevant risk scenarios identified under point 3. In the simulation of risk scenarios include the existing security of gas supply measures, such as the infrastructure standard calculated using the N – 1 formula as set out in point 2 of Annex II, and the gas supply standard. Per risk scenario:
describe in detail the risk scenario, including all assumptions and, if applicable, the underlying methodologies for their calculation;
describe in detail the results of the simulation carried out, including a quantification of the impact (e.g. volumes of unserved gas, the socioeconomic impact, the impact on district heating, the impact on electricity generation).
Describe the main results of the common risk assessment the Member States has been involved in, including the identification of risk scenarios that require further action.
Where this task has been delegated by the competent authority, indicate the name of the body/(ies) responsible for the preparation of the present risk assessment on its behalf.
For the sake of simplicity, present the information at the highest level of the risk groups if possible and merge details as necessary.
For the first assessment, include data from the last two years. For updates, include data from the last four years.
Including industrial customers, electricity generation, district heating, residential and services and other (specify the type of customers included here). Indicate as well the volume of consumption of protected customers.
Describe the methodology applied.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.
The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.
For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: