1.Unless otherwise provided by the TSO, each power generating facility owner of a power generating module which is a SGU pursuant to Article 2(1)(a) and by aggregation of the SGUs pursuant to Article 2(1)(e) connected to the distribution system shall provide at least the following data to the TSO and to the DSO to which it has a connection point:
(a)general data of the power generating module, including installed capacity and primary energy source or fuel type;
(b)FCR data F1... for power generating facilities offering or providing the FCR service;
(c)FRR data for power generating facilities offering or providing the FRR service;
(d)RR data for power generating modules offering or providing the RR service;
(e)protection data;
(f)reactive power control capability;
(g)capability of remote access to the circuit breaker;
(h)data necessary for performing dynamic simulation according to the provisions in Regulation (EU) 2016/631; and
(i)voltage level and location of each power generating module.
2.Each power generating facility owner of a power generating module which is a SGU in accordance with Article 2(1)(a) and (e) shall inform the TSO and the DSO to which it has a connection point, within the agreed time and not later than the first commissioning or any changes to the existing installation, about any change in the scope and the contents of the data listed in paragraph 1.
Textual Amendments
F1Words in Art. 48(1)(b) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 41 (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)