PART IIOPERATIONAL SECURITY

TITLE 2DATA EXCHANGE

CHAPTER 4Data exchange between TSOs, owners of interconnectors or other lines and power generating modules connected to the transmission system

Article 46Scheduled data exchange

1.

Each SGU which is a power generating facility owner of a type B, C or D power generating module connected to the transmission system shall provide the TSO with at least the following data:

(a)

active power output and active power reserves amount and availability, on a day-ahead and intra-day basis;

(b)

without any delay, any scheduled unavailability or active power restriction;

(c)

any forecasted restriction in the reactive power control capability F1...

F1(d)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2.

Each HVDC system operator shall provide the TSOs with at least the following data:

(a)

active power schedule and availability on a day-ahead and intra-day basis;

(b)

without delay its scheduled unavailability or active power restriction; and

(c)

any forecast restriction in the reactive power or voltage control capability.

3.

Each AC interconnector or line operator shall provide its scheduled unavailability or active power restriction data to the TSOs.