PART IIOPERATIONAL SECURITY

TITLE 2DATA EXCHANGE

CHAPTER 4Data exchange between TSOs, owners of interconnectors or other lines and power generating modules connected to the transmission system

Article 45Structural data exchange

1.

Each SGU which is a power generating facility owner of a type D power generating module connected to the transmission system shall provide the TSO with at least the following data:

(a)

general data of the power generating module, including installed capacity and primary energy source;

(b)

turbine and power generating facility data including time for cold and warm start;

(c)

data for short-circuit current calculation;

(d)

power generating facility transformer data;

(e)

FCR data of power generating modules offering or providing that service, in accordance with Article 154;

(f)

FRR data of power generating modules offering or providing that service, in accordance with Article 158;

(g)

RR data of power generating modules that offer or provide that service in accordance with Article 161;

(h)

data necessary for restoration of the transmission system;

(i)

data and models necessary for performing dynamic simulation;

(j)

protection data;

F1(k)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(l)

voltage and reactive power control capability.

2.

Each SGU which is a power generating facility owner of a type B or a type C power generating module connected to the transmission system shall provide the TSO with at least the following data:

(a)

general data of the power generating module, including installed capacity and primary energy source;

(b)

data for short-circuit current calculation;

(c)

FCR data F2... for power generating modules offering or providing that service;

(d)

FRR data for power generating modules that offer or provide that service;

(e)

RR data for power generating modules that offer or provide that service;

(f)

protection data;

(g)

reactive power control capability;

F3(h)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(i)

data necessary for performing dynamic stability assessment according to Article 38.

3.

A TSO may request the power generating facility owner of a power generating module connected to the transmission system to provide further data where appropriate for operational security analysis in accordance with TitleĀ 2 of PartĀ III.

4.

Each HVDC system owner or interconnector owner shall provide the TSO with the following data regarding the HVDC system or interconnector:

(a)

nameplate data of the installation;

(b)

transformers data;

(c)

data on filters and filter banks;

(d)

reactive power compensation data;

(e)

active power control capability;

(f)

reactive power and voltage control capability;

(g)

active or reactive operational mode prioritization, if existing;

(h)

frequency response capability;

(i)

dynamic models for dynamic simulation;

(j)

protection data; and

(k)

fault-ride-through capability.

5.

Each AC interconnector owner shall provide the TSO with at least the following data:

(a)

nameplate data of the installation;

(b)

electrical parameters;

(c)

associated protections.