PART IVU.K.LOAD-FREQUENCY CONTROL AND RESERVES

TITLE 11U.K.TRANSPARENCY OF INFORMATION

Article 189U.K.Information on RR

1.All TSOs of each LFC block that operates a reserve replacement process shall [F1publish] the RR availability requirements specified in accordance with Article 161(2) and the technical requirements for the connection specified in accordance with Article 161(3) for their LFC block available F2... within 3 months before their applicability.

2.All TSOs of [F3the GB synchronous area] shall [F1publish], by 30 November of each year, an outlook of the reserve capacities RR of each LFC block for the following year F2....

3.All TSOs of [F3the GB synchronous area] shall [F1publish], within 30 days after the end of the quarter, the actual reserve capacities RR of each LFC block of the past quarter F2....