PART IVLOAD-FREQUENCY CONTROL AND RESERVES

TITLE 11TRANSPARENCY OF INFORMATION

Article 189Information on RR

1.

All TSOs of each LFC block that operates a reserve replacement process shall F1publish the RR availability requirements specified in accordance with Article 161(2) and the technical requirements for the connection specified in accordance with Article 161(3) for their LFC block available F2... within 3 months before their applicability.

2.

All TSOs of F3the GB synchronous area shall F1publish, by 30 November of each year, an outlook of the reserve capacities RR of each LFC block for the following year F2....

3.

All TSOs of F3the GB synchronous area shall F1publish, within 30 days after the end of the quarter, the actual reserve capacities RR of each LFC block of the past quarter F2....