PART IVLOAD-FREQUENCY CONTROL AND RESERVES
TITLE 11TRANSPARENCY OF INFORMATION
Article 189Information on RR
1.
All TSOs of each LFC block that operates a reserve replacement process shall F1publish the RR availability requirements specified in accordance with Article 161(2) and the technical requirements for the connection specified in accordance with Article 161(3) for their LFC block available F2... within 3 months before their applicability.