xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

ANNEX I CU.K. Requirements for construction, testing, installation, and inspection

5.INSTALLATION OF RECORDING EQUIPMENTU.K.

5.3 Sealing U.K.

(405)Seal manufacturers and their distributors shall maintain full traceability records of the seals sold to be used in the frame of Regulation (EU) No 165/2014 and shall be prepared to produce them to competent national authorities whenever need be.U.K.