xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

ANNEX I CU.K.Requirements for construction, testing, installation, and inspection

Appendix 15

MIGRATION: MANAGING THE CO-EXISTENCE OF EQUIPMENT GENERATIONS U.K.

3.MAIN STEPS DURING THE PERIOD BEFORE THE INTRODUCTION DATEU.K.
MIG_020Member states shall be able to issue second generation workshop cards at the latest 3 months before the introduction date.U.K.