xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

ANNEX I CU.K.Requirements for construction, testing, installation, and inspection

Appendix 13

ITS INTERFACE U.K.

4.INTERFACE WORKING PRINCIPLESU.K.
4.1. Preconditions to data transfer via the ITS interface U.K.

The VU shall be responsible to keep updated and maintain the data to be stored in the VU, without any involvement of the ITS interface. The means by which this is achieved is internal to the VU, specified elsewhere in the Regulation, and is not specified in this Appendix.

4.1.1 Data provided through the ITS interface U.K.

The VU shall be responsible to update the data that will be available through the ITS interface at a frequency determined within VU procedures, without any involvement of ITS interface. The VU data shall be used as a basis to populate and update the Data, the means by which this is achieved is specified elsewhere in the Regulation or if there is no such specification is a function of product design and is not specified in this Appendix.

4.1.2 Content of the Data U.K.

The content of the Data shall be as specified in Annex 1 of this appendix.

4.1.3 ITS Applications U.K.

ITS applications will be using the data made available through the ITS interface for instance to optimize driver activities management while respecting the Regulation, to detect possible faults of the tachograph or to use the GNSS data. The specification of the applications is not within the scope of this Appendix.