1.Existing power-generating modules are not subject to the requirements of this Regulation, except where:
(a)a type C or type D power-generating module has been modified to such an extent that its connection agreement must be substantially revised in accordance with the following procedure:
power-generating facility owners who intend to undertake the modernisation of a plant or replacement of equipment impacting the technical capabilities of the power-generating module shall notify their plans to the relevant system operator in advance;
(b)[F5the regulatory authority] decides to make an existing power-generating module subject to all or some of the requirements of this Regulation, following a proposal from the relevant TSO in accordance with paragraphs 3, 4 and 5.
2.For the purposes of this Regulation, a power-generating module shall be considered existing if:
(a)it is already connected to the network on the date of entry into force of this Regulation; or
(b)the power-generating facility owner has concluded a final and binding contract for the purchase of the main generating plant [F6before 17 May 2018]. The power-generating facility owner [F7must have notified] the relevant system operator and relevant TSO of conclusion of the contract [F8before 17 November 2018].
The notification submitted by the power-generating facility owner to the relevant system operator and to the relevant [F9TSO must at least have indicated] the contract title, its date of signature and date of entry into force and the specifications of the main generating plant to be constructed, assembled or purchased.
[F10The regulatory authority may determine whether a power-generating module] is to be considered an existing power-generating module or a new power-generating module.
3.Following a public consultation in accordance with Article 10 and in order to address significant factual changes in circumstances, such as the evolution of system requirements including penetration of renewable energy sources, smart grids, distributed generation or demand response, the relevant TSO may propose to the regulatory authority [F11that] the application of [F12the requirements set out in] this Regulation [F13be extended] to existing power-generating modules.
For that purpose a sound and transparent quantitative cost-benefit analysis shall be carried out, in accordance with Articles 38 and 39. The analysis shall indicate:
(a)the costs, in regard to existing power-generating modules, of requiring compliance with this Regulation;
(b)the socioeconomic benefit resulting from applying the requirements set out in this Regulation; and
(c)the potential of alternative measures to achieve the required performance.
4.Before carrying out the quantitative cost-benefit analysis referred to in paragraph 3, the relevant TSO shall:
(a)carry out a preliminary qualitative comparison of costs and benefits;
(b)obtain approval from the F14... regulatory authority F15....
5.The F16... regulatory authority F17... shall decide on the extension of the applicability of this Regulation to existing power-generating modules within six months of receipt of the report and the recommendation of the relevant TSO in accordance with Article 38(4). The decision of the regulatory authority F17... shall be published.
6.The relevant TSO shall take account of the legitimate expectations of power-generating facility owners as part of the assessment of the application of this Regulation to existing power-generating modules.
7.The relevant TSO may assess the application of some or all of the provisions of this Regulation to existing power-generating modules every three years in accordance with the criteria and process set out in paragraphs 3 to 5.
Textual Amendments
F1Word in Art. 4(1)(a)(ii) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(2)(a)(i)
F2Words in Art. 4(1)(a)(ii) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(2)(a)(ii)
F3Word in Art. 4(1)(a)(iii) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(2)(b)(i)
F4Words in Art. 4(1)(a)(iii) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(2)(b)(ii)
F5Words in Art. 4(1)(b) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(2)(c)
F6Words in Art. 4(2)(b) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(3)(a)(i)
F7Words in Art. 4(2)(b) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(3)(a)(ii)
F8Words in Art. 4(2)(b) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(3)(a)(iii)
F9Words in Art. 4(2) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(3)(b)
F10Words in Art. 4(2) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(3)(c)
F11Word in Art. 4(3) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(4)(a)
F12Words in Art. 4(3) inserted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(4)(b)
F13Words in Art. 4(3) inserted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(4)(c)
F14Word in Art. 4(4)(b) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(5)(a)
F15Words in Art. 4(4)(b) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(5)(b)
F16Word in Art. 4(5) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(6)(a)
F17Words in Art. 4(5) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 1 para. 4(6)(b)