CHAPTER VIIIINFORMATION PROVISION
Article 36Non daily metered off-takes
1.
Where the information model base case is applied:
(a)
on gas day D-1, the transmission system operator shall provide network users with a forecast of their non daily metered off-takes for gas day D no later than F112.00 p.m.;
(b)
on gas day D, the transmission system operator shall provide network users with a minimum of two updates of the forecast of their non daily metered off-takes.
2.
The first update shall be provided no later than F21.00 p.m..
3.
The time of the second update provision shall be defined upon approval by the national regulatory authority and published by the transmission system operator. This shall take into consideration the following:
(a)
access to short term standardised products on a trading platform;
(b)
accuracy of the forecast of a network users non daily off-takes as compared to the time of its provision;
(c)
time when the re-nomination period ends, as provided in Article 15(1);
(d)
time of the first update of the forecast for a network user’s non daily metered off-takes.
4.
Where the information model variant 1 is applied, on gas day D, the transmission system operator shall provide network users with a minimum of two updates of their apportionment of measured flows for at least the aggregate non daily metered off-takes as referred to in Article 35.
5.
Where the information model variant 2 is applied, on gas day D-1, the transmission system operator shall provide network users with a forecast of their non daily metered off-takes for gas day D as referred to in paragraph 1(a).