Article 4Technical components of the interim migration architecture
In order to ensure the migration from SIS 1+ to SIS II, the following components shall be made available to the extent necessary:
- (a)
the C.SIS and the connection to the converter;
- (b)
the communication infrastructure for SIS 1+ allowing the C.SIS to communicate with the N.SIS;
- (c)
the N.SIS;
- (d)
Central SIS II, NI-SIS and the communication infrastructure for SIS II allowing the Central SIS II to communicate with N.SIS II and the converter;
- (e)
the N.SIS II;
- (f)
the converter.