F1F2ANNEX I BREQUIREMENTS FOR CONSTRUCTION, TESTING, INSTALLATION AND INSPECTION
- 1.
BASIC PICTOGRAMS
People
Actions
Modes of operation
Company
Company mode
Controller
Control
Control mode
Driver
Driver
Operational mode
Workshop/test station
Inspection/calibration
Calibration mode
Manufacturer
Activities
Duration
Available
Current availability period
Driving
Continuous driving time
Rest
Current rest period
Work
Current work period
Break
Cumulative break time
Unknown
Equipment
Functions
Driver slot
Co-driver slot
Card
Clock
Display
Displaying
External storage
Downloading
Power supply
Printer/printout
Printing
Sensor
Tyre size
Vehicle/vehicle unit
Specific conditions
Out of scope
Ferry/train crossing
Miscellaneous
Events
Faults
Start of daily work period
End of daily work period
Location
Manual entry of driver activities
Security
Speed
Time
Total/summary
Qualifiers
Daily
Weekly
Two weeks
From or to
- 2.
PICTOGRAM COMBINATIONS
Miscellaneous
Control place
Location start of daily work period
Location end of daily work period
From time
To time
From vehicle
Out of scope begin
Out of scope end
Cards
Driver card
Company card
Control card
Workshop card
- - -
No card
Driving
Crew driving
Driving time for one week
Driving time for two weeks
Printouts
Driver activities from card daily printout
Driver activities from VU daily printout
Events and faults from card printout
Events and faults from VU printout
Technical data printout
Over speeding printout
Events
Insertion of a non valid card
Card conflict
Time overlap
Driving without an appropriate card
Card insertion while driving
Last card session not correctly closed
Over speeding
Power supply interruption
Motion data error
Security breach
Time adjustment (by workshop)
Over speeding control
Vehicle Motion Conflict
Faults
Card fault (driver slot)
Card fault (co-driver slot)
Display fault
Downloading fault
Printer fault
Sensor fault
VU internal fault
Manual entries procedure
Still same daily work period?
End of previous work period?
Confirm or enter location of end of work period
Enter start time
Enter location of start of work period.
Inserted by Council Regulation (EC) No 2135/98 of 24 September 1998 amending Regulation (EEC) No 3821/85 on recording equipment in road transport and Directive 88/599/EEC concerning the application of Regulations (EEC) No 3820/85 and (EEC) No 3821/85.