[F1 [F2ANNEX I B U.K. REQUIREMENTS FOR CONSTRUCTION, TESTING, INSTALLATION AND INSPECTION

Appendix 3 PICTOGRAMS

[PIC_001] [F3The recording equipment may optionally use the following pictograms and pictogram combinations (or pictograms and combination similar enough to be unambiguously identifiable with these):]

1.

BASIC PICTOGRAMS

People Actions Modes of operation

Company Company mode

Controller Control Control mode

Driver Driver Operational mode

Workshop/test station Inspection/calibration Calibration mode

Manufacturer
Activities Duration

Available Current availability period

Driving Continuous driving time

Rest Current rest period

Work Current work period

Break Cumulative break time

Unknown
Equipment Functions

Driver slot

Co-driver slot

Card

Clock

Display Displaying

External storage Downloading

Power supply

Printer/printout Printing

Sensor

Tyre size

Vehicle/vehicle unit
Specific conditions

Out of scope

Ferry/train crossing
Miscellaneous

Events

Faults

Start of daily work period

End of daily work period

Location

Manual entry of driver activities

Security

Speed

Time

Total/summary
Qualifiers

Daily

Weekly

Two weeks

From or to
2.

PICTOGRAM COMBINATIONS

Miscellaneous

Control place

Location start of daily work period

Location end of daily work period

From time

To time

From vehicle

Out of scope begin

Out of scope end
Cards

Driver card

Company card

Control card

Workshop card

- - -

No card
Driving

Crew driving

Driving time for one week

Driving time for two weeks
Printouts

Driver activities from card daily printout

Driver activities from VU daily printout

Events and faults from card printout

Events and faults from VU printout

Technical data printout

Over speeding printout
Events

Insertion of a non valid card

Card conflict

Time overlap

Driving without an appropriate card

Card insertion while driving

Last card session not correctly closed

Over speeding

Power supply interruption

Motion data error

Security breach

Time adjustment (by workshop)

Over speeding control
[F4 Vehicle Motion Conflict]
Faults

Card fault (driver slot)

Card fault (co-driver slot)

Display fault

Downloading fault

Printer fault

Sensor fault

VU internal fault
Manual entries procedure

Still same daily work period?

End of previous work period?

Confirm or enter location of end of work period

Enter start time

Enter location of start of work period.

Note: Additional pictogram combinations to form printout block or record identifiers are defined in Appendix 4.] ] U.K.