Article 32Exceptions to charging principles
1.
In order to obtain full recovery of the costs incurred by the infrastructure manager a Member State may, if the market can bear this, levy mark-ups on the basis of efficient, transparent and non-discriminatory principles, while guaranteeing optimal competitiveness of rail market segments. The charging system shall respect the productivity increases achieved by railway undertakings.
The level of charges shall not, however, exclude the use of infrastructure by market segments which can pay at least the cost that is directly incurred as a result of operating the railway service, plus a rate of return which the market can bear.
Before approving the levy of such mark-ups, Member States shall ensure that the infrastructure managers evaluate their relevance for specific market segments, considering at least the pairs listed in point 1 of Annex VI and retaining the relevant ones. The list of market segments defined by infrastructure managers shall contain at least the three following segments: freight services, passenger services within the framework of a public service contract and other passenger services.
Infrastructure managers may further distinguish market segments according to commodity or passengers transported.
Market segments in which railway undertakings are not currently operating but may provide services during the period of validity of the charging system shall also be defined. The infrastructure manager shall not include a mark-up in the charging system for those market segments.
The list of market segments shall be published in the network statement and shall be reviewed at least every five years. The regulatory body referred to in Article 55 shall control that list in accordance with Article 56.
2.
For the carriage of goods from and to third countries operated on a network whose track gauge is different from the main rail network within the Union, infrastructure managers may set higher charges in order to obtain full costs recovery of the costs incurred.
3.
For specific future investment projects, or specific investment projects that have been completed after 1988, the infrastructure manager may set or continue to set higher charges on the basis of the long-term costs of such projects if they increase efficiency or cost-effectiveness or both and could not otherwise be or have been undertaken. Such a charging arrangement may also incorporate agreements on the sharing of the risk associated with new investments.
F14.
Member States may decide that this differentiation of infrastructure charges does not apply to railway lines specified in Regulation (EU) 2016/919 on which only ETCS equipped trains run.
Member States may decide to extend this differentiation to railway lines not specified in Regulation (EU) 2016/919.
5.
To prevent discrimination, Member States shall ensure that any given infrastructure manager's average and marginal charges for equivalent use of its infrastructure are comparable and that comparable services in the same market segment are subject to the same charges. The infrastructure manager shall show in the network statement that the charging system meets these requirements in so far as this can be done without disclosing confidential business information.
6.