[X1Article 13 U.K. Risk analysis

1. Risk analyses, where necessary, shall be carried out by a body which is functionally independent from the Tunnel Manager. The content and the results of the risk analysis shall be included in the safety documentation submitted to the administrative authority. A risk analysis is an analysis of risks for a given tunnel, taking into account all design factors and traffic conditions that affect safety, notably traffic characteristics and type, tunnel length and tunnel geometry, as well as the forecast number of heavy goods vehicles per day.

2. Member States shall ensure that, at national level, a detailed and well-defined methodology, corresponding to the best available practices, is used and shall inform the Commission of the methodology applied; the Commission shall make this information available in electronic form to other Member States.

[F13. By 30 April 2009 the Commission shall publish a report on the practice followed in the Member States. Where necessary, it shall make recommendations for the adoption of a common harmonised risk analysis methodology in accordance with the regulatory procedure referred to in Article 17(2).] ]