Commission Implementing Decision (EU) 2019/2151Show full title

Commission Implementing Decision (EU) 2019/2151 of 13 December 2019 establishing the work programme relating to the development and deployment of the electronic systems provided for in the Union Customs Code

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Changes to legislation:

This version of this Decision was derived from EUR-Lex on IP completion day (31 December 2020 11:00 p.m.). It has not been amended by the UK since then. Find out more about legislation originating from the EU as published on legislation.gov.uk. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

II.LIST OF PROJECTS RELATED TO THE DEVELOPMENT AND DEPLOYMENT OF ELECTRONIC SYSTEMSU.K.

A. Full list U.K.

a

This date for starting the deployment window of the electronic systems is the earliest date for Member States to start operations.

b

This date for ending the deployment window of the electronic systems is the last date by which the system should be fully deployed and the last date by which all economic operators should be migrated; where applicable, the date will be established by the Member States and is the end date of the validity of the transitional period.

‘UCC projects and related electronic systems’List of projects related to the development and deployment of electronic systems required for the application of the CodeLegal baseKey milestoneDates of deployment of the electronic systems
Start date of the deployment window of the electronic systemaEnd date of the deployment window of the electronic systemb = End date of the transitional period
1. UCC Registered Exporter System (REX)

The project aims to make available up-to-date information on registered exporters established in Generalised Scheme of Preference (GSP) countries exporting goods to the Union. The system is trans-European and also includes data about EU economic operators, for the purpose of supporting exports to GSP countries. The required data was inserted into the system in a gradual manner until 31 December 2017.

Article 6(1), Articles 16 and 64 of Regulation (EU) No 952/2013

Target date of technical specifications

= Q1 2015

1.1.2017

1.1.2017

2. UCC Binding Tariff Information (BTI)

The project aims to provide an upgrade of the existing trans-European EBTI-3 system to ensure the following:

(a)

alignment of the EBTI-3 system with UCC requirements;

(b)

extension of under-surveillance-required declaration data;

(c)

monitoring of the compulsory BTI usage;

(d)

monitoring and management of BTI extended usage.

The project is implemented in two phases.

The first phase (step 1) provides functionality to gradually receive the UCC-required declaration dataset from 1 March 2017 until the implementation of the projects listed in points 10 (by 1 December 2023 at the latest) and 14 (by 31 December 2022 at the latest). Step 2 fulfils the BTI usage control obligation on the basis of the newly required declaration dataset and the alignment with the customs decisions process.

The second phase implements the electronic form of the BTI application and decision, and provides economic operators with a harmonised trader interface to submit the BTI application and receive the BTI decision electronically.

Article 6(1), Articles 16, 22, 23, 26, 27, 28, 33 and 34 of Regulation (EU) No 952/2013

Target date of technical specifications

= Q2 2016

(phase 1)

1.3.2017

(phase 1 — step 1)

1.3.2017

(phase 1 — step 1)

2.10.2017

(phase 1 — step 2)

2.10.2017

(phase 1 — step 2)

Target date of technical specifications

= Q2 2018

(phase 2)

1.10.2019

(phase 2)

1.10.2019

(phase 2)

3. UCC Customs Decisions

The project aims to harmonise the processes for applications for a customs decision, decision-making and decision management through standardisation and electronic management of application and decision/authorisation data across the Union. The project relates to national and multi-Member State decisions defined by the Code, and covers system components developed centrally at Union level and integration with national components where Member States opt for these. This trans-European system facilitates consultation during the decision-making process and the management of the authorisation process.

Article 6(1), Articles 16, 22, 23, 26, 27 and 28 of Regulation (EU) No 952/2013

Target date of technical specifications

= Q4 2015

2.10.2017

2.10.2017

4. Direct trader access to the European Information Systems (Uniform User Management & Digital Signature)

The goal of this project is to provide working solutions for direct and harmonised trader access as a service for user-to-system interfaces, to be integrated into the electronic customs systems as defined in the specific UCC projects. The Uniform User Management and Digital Signature will be integrated into the portals of the systems concerned, and includes support for identity, access and user management compliant with the necessary security policies.

The first deployment took place alongside the UCC Customs Decisions system.

This technical authentication and user management solution will subsequently be made available for use in other UCC projects such as the UCC Binding Tariff Information (BTI), UCC Authorised Economic Operators (AEO) upgrade, UCC Proof of Union Status (PoUS) and the UCC Information Sheets (INF) for Special Procedures. See the different projects for the dates of deployment.

Article 6(1) and Article 16 of Regulation (EU) No 952/2013

Target date of technical specifications

= Q4 2015

2.10.2017

2.10.2017

5. UCC Authorised Economic Operators (AEO) upgrade

The project aims to improve the business processes related to AEO applications and authorisations, taking into account changes to the legal provisions of the UCC.

In the first phase, the project aims to implement major improvements to the AEO system as part of the harmonisation of the customs decision-making procedure.

In the second phase, the project implements the electronic form of the AEO application and decision, and provide economic operators with a harmonised interface to submit the AEO application and receive the AEO decision electronically. The upgraded system is deployed in two releases: part 1 for the submission of the AEO application and the decision-making process, and part 2 for the other subsequent processes.

Article 6(1), Articles 16, 22, 23, 26, 27, 28, 38 and 39 of Regulation (EU) No 952/2013

Target date of technical specifications

= Q1 2016

5.3.2018

(phase 1)

5.3.2018

(phase 1)

Target date of technical specifications

= Q4 2018

1.10.2019

(phase 2 — part 1 initial processes)

16.12.2019

(phase 2 — part 2 other processes)

1.10.2019

(phase 2 — part 1)

16.12.2019

(phase 2 — part 2)

6. UCC Economic Operator Registration and Identification System upgrade (EORI 2)

This project aims to provide a minor upgrade of the existing trans-European EORI system that enables the registration and identification of Union and third-country economic operators and persons other than economic operators that are active in customs matters in the Union.

Article 6(1) and Article 9 of Regulation (EU) No 952/2013 laying down the Union Customs Code

Target date of technical specifications

= Q2 2016

5.3.2018

5.3.2018

7. UCC Surveillance 3

This project aims to provide an upgrade of the Surveillance 2+ system to ensure its alignment with UCC requirements such as the standard exchange of information via electronic data processing techniques and the establishment of the functionalities needed for processing and analysing the full surveillance dataset obtained from Member States.

It includes further data mining capabilities and reporting functionalities, therefore, which will be made available to the Commission and Member States.

Full implementation of this project is dependent on the projects listed in points 10 (by 1 December 2023 at the latest) and 14 (by 31 December 2022 at the latest). The date of deployment of this system has to be defined by the Member States as part of their national plans.

Article 6(1), Articles 16 and 56(5) of Regulation (EU) No 952/2013

Target date of technical specifications

= Q3 2016

1.10.2018

1.10.2018

8. UCC Proof of Union Status (PoUS)

The project aims to create a new trans-European system to store, manage and retrieve the Proofs of Union Status T2L/F and the customs goods manifest (issued by a non-authorised issuer).

As implementation of the customs goods manifest is to be linked to the European Maritime Single Window, this part of the project will be covered under a separate phase.

Article 6(1), Articles 16 and 153 of Regulation (EU) No 952/2013

Target date of technical specifications

= Q1 2022

1.3.2024

(phase 1)

2.6.2025

(phase 2)

1.3.2024

(phase 1)

2.6.2025

(phase 2)

9. UCC New Computerised Transit System (NCTS) upgrade

The aim of this project is to align the existing trans-European NCTS system with the new UCC.

Component 1‘NCTS Phase 5’: the aim of this phase is to align the NCTS system with the new UCC requirements except in safety and security data elements in transit customs declarations of goods brought into the customs territory of the Union.

It covers the registration of ‘en route’ events and the alignment of information exchanges with UCC data requirements, and the upgrade and development of interfaces with other systems.

Component 2‘NCTS Phase 6’: the aim of this phase is to implement the specific new requirements for safety and security data elements in transit customs declarations of goods brought into the customs territory of the Union resulting from project 17 (UCC ICS2). The scope and implementation solution will be agreed during the project initiation phase.

Article 6(1), Articles 16 and 226-236 of Regulation (EU) No 952/2013

Target date of technical specifications

= Q4 2019

Target date of technical specifications

= Q2 2022

1.3.2021

3.6.2024

1.12.2023

2.6.2025

10. UCC Automated Export System (AES)

This project aims to implement the UCC requirements for export and exit.

Component 1 —‘Trans-European AES’. The aim of the project is to further develop the existing trans-European Export Control System in order to implement a full AES that will cover the business requirements for processes and data brought about by the UCC, including the coverage of simplified procedures and centralised clearance for export. It is also intended to cover the development of harmonised interfaces with the Excise Movement System (EMCS) and NCTS. As such, the AES will enable the full automation of export procedures and exit formalities. The AES covers parts to be developed centrally and nationally, including the national components in which the export declaration is lodged and processed and which enable the subsequent exchange of information with the customs office of exit via the common components of the AES.

Component 2 —‘National Export Systems upgrade’. In a process outside the scope of the AES but closely linked, separate national systems are to be upgraded for specific national elements related to export and/or exit formalities. Where these elements do not impact on the common domain for AES, they can be covered under this component.

Article 6(1), Articles 16, 179 and 263-276 of Regulation (EU) No 952/2013

Target date of technical specifications

= Q4 2019

(component 1)

1.3.2021

(component 1)

1.12.2023

(component 1)

Target date of technical specifications

= to be defined by MS

(component 2)

1.3.2021

(component 2)

1.12.2023

(component 2)

11. UCC Information Sheets (INF) for Special Procedures

The aim of this project is to develop a new trans-European system to support and streamline the INF data management processes and the electronic handling of INF data in the Special Procedures domain.

Article 6(1), Articles 16, 215, 255-262 of Regulation (EU) No 952/2013

Target date of technical specifications

= Q2 2018

1.6.2020

1.6.2020

12. UCC Special Procedures

This project aims to accelerate, facilitate and harmonise Special Procedures across the Union by providing common business process models. The national systems will implement all UCC changes required for customs warehousing, end-use, temporary admission, inward and outward processing.

This project will be implemented in two parts.

Component 1 —‘National SP EXP’. Provides the required national electronic solutions for export-related special procedures activities.

Component 2 —‘National SP IMP’. Provides the required national electronic solutions for import-related special procedures activities.

Implementation of these projects will take place through the projects listed in points 10 and 14.

Article 6(1), Articles 16, 215, 237-242 and 250-262 of Regulation (EU) No 952/2013

Target date of technical specifications

= to be defined by MS (for component 1 and 2)

1.3.2021

(component 1)

1.12.2023

(component 1)

To be defined by MS as part of the national plan

(component 2)

To be defined by MS as part of the national plan with a deployment window till 31.12.2022

(component 2)

13. UCC Notification of Arrival, Presentation Notification and Temporary Storage

The goal of this project is to define the processes for Notification of Arrival of the means of transport, Presentation of the goods (Presentation Notification) and Declaration for Temporary Storage as described in the UCC and to support harmonisation in this respect across the Member States as regards the data exchange between trade and customs.

The project covers the automation of processes at national level.

Article 6(1), Articles 16 and 133-152 of Regulation (EU) No 952/2013

Target date of technical specifications

= to be defined by MS and for Notification of Arrival in line with ICS2 planning.

To be defined by MS as part of the national plan

To be defined by MS as part of the national plan with a deployment window till 31.12.2022

14. UCC National Import Systems upgrade

The project aims to implement all process and data requirements deriving from the UCC which relate to the import domain (and which are not covered by one of the other projects defined in the work programme). It relates mainly to the changes in the ‘Release for free circulation’ procedure (standard procedure + simplifications), but also covers the impact arising from other system migrations. This project relates to the national import domain covering national customs declaration processing systems as well as other systems such as national accountancy and payment systems.

Article 6(1), Article 16(1) and Articles 53, 56, 77-80, 83-87, 101-105, 108-109, 158-187, 194-195 of Regulation (EU) No 952/2013

Target date of technical specifications

= to be defined by MS

To be defined by MS as part of the national plan

To be defined by MS as part of the national plan with a deployment window till 31.12.2022

15. UCC Centralised Clearance for Import (CCI)

This project aims to allow goods to be placed under a customs procedure using centralised clearance, allowing economic operators to centralise their business from a customs viewpoint. The processing of the customs declaration and the physical release of the goods should be coordinated between the related customs offices. It concerns a trans-European system containing components developed centrally and nationally.

The project will be implemented in two phases.

Phase 1: this phase will cover the combination of centralised clearance with standard customs declarations and with simplified customs declarations and the respective supplementary declarations (regularising one simplified customs declaration). In addition it will cover the placing of goods under the following customs procedures: release for free circulation, customs warehousing, inward processing and end-use. Finally, for the type of goods this phase will cover all types of goods with the exception of excise goods and goods subject to common agricultural policy measures.

Phase 2: this phase will cover everything that is not covered by phase 1, namely the combination of centralised clearance with customs declarations through an entry in the declarant’s records and the respective supplementary declarations, supplementary declarations regularising more than one simplified customs declaration, the placing of goods under the temporary admission procedure, and excise goods and goods subject to common agricultural policy measures.

Article 6(1), Articles 16 and 179 of Regulation (EU) No 952/2013

Target date of technical specifications

= Q3 2020

Target date of technical specifications

= Q2 2022

1.3.2022

2.10.2023

1.12.2023

2.6.2025

16. UCC Guarantee Management (GUM)

This project aims to ensure the effective and efficient management of the different types of guarantees.

Component 1 —‘GUM’: The trans-European system will cover the management of the comprehensive guarantees that may be used in more than one Member State, and the monitoring of the reference amount for each customs declaration, supplementary declaration or appropriate information on the particulars needed for the entry in the accounts of existing customs debts for all customs procedures as provided for in the Union Customs Code, except Transit, which is handled as part of the NCTS project.

Component 2 —‘National Guarantee Management’: In addition, the electronic systems existing at national level to manage the guarantees valid in one Member State are to be upgraded.

Article 6(1), Articles 16 and 89-100 of Regulation (EU) No 952/2013

Target date of technical specifications

= Q3 2022

(component 1)

2.10.2023

(component 1)

2.6.2025

(component 1)

Target date of technical specifications

= to be defined by MS

(component 2)

To be defined by MS as part of the national plan

(component 2)

To be defined by MS as part of the national plan with a deployment window till 2.6.2025

(component 2)

17. UCC Import Control System 2 (ICS2)

The aim of this programme is to strengthen pre-arrival safety and security of goods entering the Union by implementing the new UCC requirements regarding the lodging and treatment of entry summary declarations (ENS), namely the provision of ENS data in more than one submission and/or by different persons and the exchange of that data and the risk analysis results among the customs authorities. The ICS2 will lead to a complete new architecture and phased replacement of the existing trans-European ICS system.

The programme will be implemented in three releases.

Release 1: as a first phase, this release will cover the obligation on the relevant economic operators (postal operators and express carriers in air transport) to provide the minimum data, i.e. ENS pre-loading dataset.

Release 2: as a second phase, this release will cover the implementation of complete new ENS obligations, related business and risk management processes for all the goods in air traffic.

Release 3: as a third phase, this release will cover the implementation of complete new ENS obligations, related business and risk management processes for all goods in maritime and inland waterways and road and rail traffic (this includes goods in postal consignments transported in these means of transport).

Article 6(1), Articles 16, 46, 47, and 127-132 of Regulation (EU) No 952/2013

Target date of technical specifications for all three Releases

= Q2 2018

15.3.2021

(Release 1)

1.10.2021

(Release 1)

1.3.2023

(Release 2)

1.3.2024

(Release 3)

2.10.2023

(Release 2)

1.10.2024

(Release 3)

B. Overview of the list U.K.

UCC Projects related to electronic systemsDates of deployment/Deployment windows201720182019202020212022202320242025
1.

UCC Registered Exporter System (REX)

1.1.2017X
2.

UCC Binding Tariff Information System (BTI)

1.3.2017

(phase 1 — step 1)

2.10.2017

(phase 1 — step 2)

1.10.2019

(phase 2)

X

X

X

3.

UCC Customs Decisions

2.10.2017X
4.

Direct trader access to European Information Systems (Uniform user management & digital signature)

2.10.2017X
5.

UCC Authorised Economic Operators System (AEO) upgrade

1.3.2018

(phase 1)

1.10.2019

(phase 2 — part 1)

16.12.2019

(phase 2 — part 2)

X

X

X

6.

UCC Economic Operator Registration and Identification System upgrade

(EORI 2)

1.3.2018X
7.

UCC Surveillance 3

1.10.2018X
8.

UCC Proof of Union Status (PoUS)

1.3.2024

(phase 1)

2.06.2025

(phase 2)

X

X

9.

UCC New Computerised Transit System (NCTS) upgrade

1.3.2021-1.12.2023 (phase 5)

3.6.2024-2.6.2025 (phase 6)

XXX

X

X

10.

UCC Automated Export System (AES) —

Component 1: Trans-European AES

1.3.2021-1.12.2023XXX
10.

UCC Automated Export System (AES) —

Component 2: National Export Systems upgrade

1.3.2021-1.12.2023XXX
11.

UCC Information Sheets (INF) for Special Procedures

1.6.2020X
12.

UCC Special Procedures —

Component 1: National SP EXP

national planning

1.3.2021-1.12.2023— see also project 10

XXXXXXX
12.

UCC Special Procedures —

Component 2: National SP IMP

national planning for SP IMP

(till 31.12.2022) — see also project 14

XXXXXX
13.

UCC Notification of arrival, presentation notification and temporary storage

national planning

(till 31.12.2022)

XXXXXX
14.

UCC National Import Systems upgrade

national planning

(till 31.12.2022)

XXXXXX
15.

UCC Centralised Clearance for Import (CCI)

1.3.2022-1.12.2023 (phase 1)

2.10.2023-2.6.2025 (phase 2)

X

X

X

X

X

16.

UCC Guarantee Management (GUM) —

Component 1: Trans-European GUM

2.10.2023-2.6.2025XXX
16.

UCC Guarantee Management System (GUM) —

Component 2: National Guarantee Management

national planning

(till 2.6.2025)

XXXXXXXXX
17.

UCC Import Control System

(ICS 2)

15.3.2021-1.10.2021

(Release 1)

1.3.2023-2.10.2023

(Release 2)

1.3.2024-1.10.2024

(Release 3)

X

X

X

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources