Commission Decision
of 17 December 2013
on the notification by the Kingdom of Spain of a transitional national plan referred to in Article 32 of Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions
(notified under document C(2013) 9089)
(Only the Spanish text is authentic)
(2013/799/EU)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Whereas:
Based on the information received from the Spanish authorities on 30 September 2013 and 10 October 2013, the Commission noted that for multiple fuel types plants, for which emission limit values for all fuels fired have been provided, and for one plant for which emission limit value averaged for all fuels fired has been provided, it is necessary to clarify how the contributions to the total ceilings from those plants were calculated, specifying the emission limit values and the average annual waste gas flow rates used for each fuel fired in those plants.
in case of plant 2: the Commission considers the application of the emission limit value of 800 mg/Nm3 for SO2 for calculating its contribution to the 2016 TNP ceiling on the basis of Article 5(2) of Directive 2001/80/EC, as that emission limit value is not referred to in the second subparagraph of Article 32(3) of Directive 2010/75/EU, as not appropriate;
in case of plant 5: the Commission considers the method of calculating its contribution to the TNP ceiling for SO2, combining the minimum desulphurisation rate approach and the emission limit value approach, as not appropriate;
in case of plants 13, 15, 17, 18, 24 and 25: the Commission considers the application of the emission limit value of 1 200 mg/Nm3 for NOx for calculating their contribution to the 2016 TNP ceiling, as the conditions to apply this emission limit value, which are set out in Note 2 of Table C1 to Appendix C of the Annex to Implementing Decision 2012/115/EU, are not fulfilled, as not appropriate.
In addition, the Commission identified several plants in the TNP where the information is still inconsistent and/or missing data need to be supplemented. The full list of missing data and requests for clarification is included in Annex II to this decision.
Hence, the TNP notified by the Kingdom of Spain should not be accepted.
HAS ADOPTED THIS DECISION:
Article 1
1.
The transitional national plan which the Kingdom of Spain notified to the Commission pursuant to Article 32(5) of Directive 2010/75/EU on 14 December 2012, which includes the large combustion plants listed in Annex I to this decision, is not in accordance with the requirements laid down in Article 32(1), (3) and (4) of Directive 2010/75/EU and in Implementing Decision 2012/115/EU, and shall, therefore, not be accepted.
2.
If the Kingdom of Spain intends to implement a transitional national plan pursuant to Article 32(5), it shall take all necessary measures to address, in a revised version of the plan, the following elements:
(a)
for plant 2, to correct the emission limit value applied for calculating its contribution to the SO2 ceiling for 2016; the plant is not eligible for using the emission limit value of 800 mg/Nm3 for SO2 for calculating its contribution to the 2016 TNP ceiling on the basis of Article 5(2) of Directive 2001/80/EC, as that emission limit value is not referred to in the second subparagraph of Article 32(3) of Directive 2010/75/EU;
(b)
for plant 5, to correct the method applied for calculating its contribution to the 2016 TNP ceiling for SO2; that contribution shall be calculated for the entire period 2001-2010 either on the basis of the minimum desulphurisation rate, or on the basis of the emission limit values;
(c)
for plants 13, 15, 17, 18, 24 and 25: to correct the emission limit values applied for calculating their contribution to the NOx ceiling for 2016; in order for the plants to be eligible for using the emission limit value of 1 200 mg/Nm3, the Kingdom of Spain shall demonstrate that the average annual volatile content of the solid fuel used in the plants was below 10 % in the reference years considered for the TNP;
(d)
to correctly update the total emission ceilings for all years calculated in accordance with the corrected values mentioned in the previous points;
(e)
to clarify all issues and complement the data as mentioned in Annex II to this decision.
Article 2
This Decision is addressed to the Kingdom of Spain.
Done at Brussels, 17 December 2013.
For the Commission
Janez Potočnik
Member of the Commission
ANNEX I
Number | Plant name in the TNP | Total rated thermal input on 31.12.2010 (MW) |
|---|---|---|
1 | C.T. Litoral I | 1 222 |
2 | C.T. Litoral II | 1 268 |
3 | C.T. Compostilla I (G2 and 3) | 1 332 |
4 | C.T. Compostilla I (G4 and 5) | 1 960 |
5 | C.T. As Pontes | 3 800 |
6 | C.T. Teruel (Andorra) | 3 000 |
7 | C.T. Besós 3 (CTCC) | 722 |
8 | C.T. San Roque (G2) (CTCC) | 711 |
9 | C.T. Foix | 1 315 |
10 | C.T. Los Barrios | 1 645 |
11 | C.T. Puentenuevo | 976 |
12 | C.T. Tarragona I (CTCC) | 676 |
13 | C.T. Anllares | 953 |
14 | C.T. La Robla I | 691 |
15 | C.T. La Robla II | 951 |
16 | C.T. Meirama | 1 437 |
17 | C.T. Narcea I | 193 |
18 | C.T. Narcea II | 459 |
19 | C.T. Narcea III | 993 |
20 | C.T. Aboño I | 919 |
21 | C.T. Aboño II | 1 364 |
22 | C.T. Soto III | 830 |
23 | C.T. de Lada 4 | 986 |
24 | C.T. de Velilla 1 | 430 |
25 | C.T. de Velilla 2 | 1 010 |
26 | Central GICC Puertollano | 670 |
27 | San Ciprián I | 147 |
28 | San Ciprián II | 147 |
29 | San Ciprián IIII | 147 |
30 | Cogecan | 93 |
31 | Sniace Co-generation I | 126 |
32 | Sniace Co-generation II | 126 |
33 | Solal | 146 |
34 | Solvay I | 376 |
ANNEX IILIST OF DATA REFERRED TO IN POINT (E) OF ARTICLE 1(2)
1.
For plant 6 which uses a desulphurisation rate of 92 % in 2016: clarification shall be provided if conditions for application of this value as set in table C3 to Appendix C of the Annex to Implementing Decision 2012/115/EU are met (a contract for fitting a flue gas desulphurisation or a lime injection equipment has entered into effect, and work on its installation has commenced, before 1 January 2001).
2.
For plants 1, 2, 3, 4, 6, 13, 14, 15, 16, 18, 19, 20, 21, 22, 23, 24, 25, 30 and 34: clarification shall be provided on how the contributions from those plants were calculated to the total TNP ceilings.
3.
For plant 34: data on the waste gas flow rates for each fuel fired in this plant shall be provided separately.