Commission Decision
of 2 December 2013
amending Decision 2012/757/EU concerning the technical specification for interoperability relating to the ‘operation and traffic management’ subsystem of the rail system in the European Union
(notified under document C(2013) 8377)
(Text with EEA relevance)
(2013/710/EU)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Whereas:
Appendix A of the current TSIs on Operation and Traffic Management refer to version 2 of the European Railway Traffic Management System (ERTMS) operating rules that were developed on the basis of the European Train Control System (ETCS) System Requirements Specifications (SRS) version 2.3.0.d.
The current versions of the ERTMS/ETCS specifications are ‘Baseline 2’ and ‘Baseline 3’. The version of the ‘ERTMS operational principles and rules’ corresponding to ‘ERTMS/ETCS Baseline 3’ is version 3. This needs to be reflected in the TSIs on operation and traffic management.
Decision 2012/757/EU therefore needs to be amended.
The measures provided for in this Decision are in accordance with the opinion of the Committee established in accordance with Article 29(1) of Directive 2008/57/EC,
HAS ADOPTED THIS DECISION:
Article 1
Appendix A to Annex I to Decision 2012/757/EU (OPE TSI) is replaced by the following:
‘Appendix AERTMS/ETCS and ERTMS/GSM-R operating rules
The operating rules for ERTMS/ETCS and ERTMS/GSM-R are specified in the Technical Document “ERTMS operational principles and rules — version 3” published on the ERA website (www.era.europa.eu).’.
Article 2
This Decision shall apply from 1 January 2014.
Article 3
This Decision is addressed to the Member States.
Done at Brussels, 2 December 2013.
For the Commission
Siim Kallas
Vice-President