Article 1
As it is foreseen that harmonised rules on transparency will pass the comitology procedure in 2012 the Commission establishes for the development of harmonised electricity rules this annual priority list for 2013:
capacity allocation and congestion management rules including governance for day-ahead and intraday markets including capacity calculation (adoption under comitology procedure),
rules for longer-term (forward) capacity allocation (drafting of network code),
network connection rules:
network rules on generator grid connection (adoption under comitology procedure),
network code on distribution system operator and industrial load connection (finalise network code and start comitology process),
network code on High-voltage direct current transmission system connection,
- system operation (finalise network codes on operational security, on operational planning and scheduling and on load-frequency control and reserves and start adoption process5),
balancing rules including network-related reserve power rules (finalise network code on balancing),
rules regarding harmonised transmission tariff structures and/or investment incentives.