Council Decision of 27 March 2000 on the establishment of a financial regulation governing the budgetary aspects of the management by the Deputy Secretary-General of the Council, of contracts concluded in his name, on behalf of certain Member States, relating to the installation and the functioning of the communication infrastructure for the Schengen environment, ‘Sisnet’ (2000/265/EC)

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening Options

Close

This is a legislation item that originated from the EU

After exit day there will be three versions of this legislation to consult for different purposes. The legislation.gov.uk version is the version that applies in the UK. The EU Version currently on EUR-lex is the version that currently applies in the EU i.e you may need this if you operate a business in the EU.

The web archive version is the official version of this legislation item as it stood on exit day before being published to legislation.gov.uk and any subsequent UK changes and effects applied. The web archive also captured associated case law and other language formats from EUR-Lex.

Changes over time for: Council Decision of 27 March 2000 on the establishment of a financial regulation governing the budgetary aspects of the management by the Deputy Secretary-General of the Council, of contracts concluded in his name, on behalf of certain Member States, relating to the installation and the functioning of the communication infrastructure for the Schengen environment, ‘Sisnet’ (2000/265/EC)

 Help about opening options

Status:

Point in time view as at 30/11/2009.

Changes to legislation:

There are currently no known outstanding effects for the Council Decision of 27 March 2000 on the establishment of a financial regulation governing the budgetary aspects of the management by the Deputy Secretary-General of the Council, of contracts concluded in his name, on behalf of certain Member States, relating to the installation and the functioning of the communication infrastructure for the Schengen environment, ‘Sisnet’ (2000/265/EC). Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Council Decision

of 27 March 2000

on the establishment of a financial regulation governing the budgetary aspects of the management by the Deputy Secretary-General of the Council, of contracts concluded in his name, on behalf of certain Member States, relating to the installation and the functioning of the communication infrastructure for the Schengen environment, ‘Sisnet’

(2000/265/EC)

THE COUNCIL OF THE EUROPEAN UNION,

Having regard to the first sentence of the second subparagraph of Article 2(1) of the Protocol annexed to the Treaty on European Union and to the Treaty establishing the European Community, integrating the Schengen acquis into the framework of the European Union (hereinafter ‘the Schengen Protocol’),

Whereas:

(1) The Deputy Secretary-General of the Council was authorised by Decision 1999/870/EC(1) to act, in the context of the integration of the Schengen acquis within the European Union, as representative of certain Member States for the purposes of concluding contracts relating to the installation and the functioning of the communication infrastructure for the Schengen environment (hereinafter ‘Sisnet’) and to manage such contracts.

(2) The financial obligations arising under those contracts are not borne by the general budget of the European Union; therefore, the provisions of the Financial Regulation of 21 December 1977 applicable to the general budget of the European Communities(2) do not apply.

(3) It is therefore necessary to establish specific rules to define the detailed procedures for establishing and implementing the budget required to meet any expenses incurred in the course of concluding the contracts, the obligations arising under those contracts once concluded, for recovering the contributions to be paid by the States concerned and for the presentation and auditing of the accounts.

(4) It is also necessary to set out the rules applicable to the conclusion of these contracts.

(5) This Decision is a development of the Schengen acquis within the meaning of the Schengen Protocol,

HAS DECIDED AS FOLLOWS:

CHAPTER IU.K.General principles

[F1Article 1 U.K.

1. For the purposes of this Financial Regulation, the budget is the instrument which sets out forecasts of, and authorises in advance, for each financial year, the revenue and expenditure required to meet the obligations arising under the contracts referred to in Decision 1999/870/EC and Decision 2007/149/EC (3) .

2. For the purposes of this Financial Regulation, the reference to SISNET comprises the Communication infrastructure for the Schengen environment as referred to in Decision 1999/870/EC and Decision 2007/149/EC.]

Article 2U.K.

This Financial Regulation lays down detailed rules for the conclusion of contracts relating to Sisnet and for the establishment and implementation of the budget required in relation to such contracts.

Article 3U.K.

1.The budget shall be subdivided into titles covering the budget relating to the preparatory steps leading to the conclusion of the contracts in question, including any costs incurred during the preparation of the call for tenders in respect of Sisnet, the installation budget and the operating budget for the Sisnet. If necessary, each title shall be subdivided into chapters and articles.

2.Appropriations opened under each title may not be assigned to other expenditure titles.

Article 4U.K.

The budget appropriations shall be used in accordance with the principles of sound financial management, and in particular those of economy and cost-effectiveness.

Article 5U.K.

No revenue shall be collected and no expenditure effected unless credited to, or charged against, an article in the budget.

Without prejudice to Article 17, no expenditure may be committed or authorised in excess of the authorised appropriations.

Article 6U.K.

1.Subject to Article 17, all revenue and expenditure shall be entered in full in the budget and in the accounts without any adjustment against each other. Total revenue shall cover total expenditure.

2.The financial year shall run from 1 January to 31 December.

3.Any budget contributions by the States referred to in Article 25 paid before the beginning of the financial year which they concern shall be credited to the budget for that financial year.

[F24. The expenditure of a financial year shall be entered in the accounts for that year on the basis of expenditure authorised no later than 31 December and for which the corresponding payments were made by the accounting officer before the following 15 January.]

5.The allotted appropriations may be used solely to cover expenditure properly entered into and paid under the financial year for which they were granted, save as otherwise provided in Article 7, and to cover the debts relating to preceding financial years for which no appropriation was carried forward.

Article 7U.K.

1.The following rules shall govern the utilisation of appropriations:

(a)appropriations still uncommitted at the end of the financial year for which they were entered shall, as a rule, lapse;

[F3(b) appropriations in respect of payments still outstanding at 31 December by virtue of commitments duly entered into between 1 January and 15 December shall be carried over automatically to the next financial year only.]

[F32. [F2Notwithstanding paragraph 1, the Deputy Secretary-General of the Council may forward to the representatives of the States referred to in Article 25, meeting within the framework of the SIS/SIRENE Working Party (Mixed Committee), hereinafter referred to as the SIS/SIRENE Working Party , before 31 January, duly substantiated requests to carry over to the next financial year appropriations not committed at 15 December when the appropriations provided for the headings concerned in the budget for the following financial year do not cover requirements.] ]

The carry-over of such appropriations may be proposed only for exceptional reasons.

In exercising his powers to implement the budget, the Deputy Secretary-General shall, depending on management requirements, endeavour to use first the appropriations authorised for the current financial year and not use the appropriations carried over until the former are exhausted.

[F2The SIS/SIRENE Working Party shall act on such requests for carrying over by 1 March at the latest.]

3.Appropriations carried over from one financial year to the following lapse if still uncommitted at the end of the financial year to which they were carried over.

F44.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.For the purpose of implementing the budget, the utilisation of appropriations carried forward shall be shown separately, for each budget item, in the accounts for the current financial year.

CHAPTER IIU.K.Establishment of the budget

Article 8U.K.

1.The budget shall be drawn up in euro.

[F22. The Deputy Secretary-General shall forward the preliminary draft budget to the SIS/SIRENE Working Party before 15 October and attach an explanatory memorandum.

3. The SIS/SIRENE Working Party shall deliver its opinion on that preliminary draft.

4. The Deputy Secretary-General shall establish the draft budget and forward it by 15 November to the States referred to in Article 25.]

5.The Member States referred to in Article 25, meeting within the Council, shall adopt the budget before the end of the year.

6.The decision to adopt the budget, duly notified by the Deputy Secretary-General to the States referred to in Article 25, shall mark the point at which those States' contributions fall due.

Article 9U.K.

1.If the budget has not been finally adopted at the beginning of the financial year:

(a)payments may be made for up to one twelfth, each month, of the total appropriations authorised for each budget title for the preceding financial year; and

(b)the contributions of the States referred to in Article 25 may be called up for up to one twelfth, each month, of the contributions paid under the last duly adopted budget.

2.Each decision to use an expenditure and revenue twelfth, up to a total of three twelfths of the amounts entered in the last duly adopted budget, shall be taken by the Deputy Secretary-General, who shall forward it by letter to the States referred to in Article 25.

3.Above the limit of three twelfths of the amounts entered in the last duly adopted budget, any decision to authorise payments and call up contributions shall be taken by the Member States referred to in Article 25, meeting within the Council.

4.Any measures taken pursuant to paragraphs 1, 2 and 3 shall be terminated immediately on final adoption of the budget.

Article 10U.K.

1.Any draft supplementary or amending budgets shall be submitted, examined and adopted in the same form and using the same procedure as the budget whose estimates they are amending.

[F22. An amending budget shall be submitted on an annual basis, in the three months following the closure of the accounts as laid down in Article 46(1), with the aim of entering the balance of the budget outturn from the previous financial year as revenue in the case of a positive balance or expenditure if the balance is negative.]

Article 11U.K.

The budget may be released to the public.

CHAPTER IIIU.K.Implementation of the budget and accountancy

[F2Article 12 U.K.

The budget shall be implemented in accordance with the principle that the authorising officer and the accounting officer are different individuals. The duties of authorising officer, accounting officer and internal auditor shall be mutually incompatible.]

Article 13U.K.

1.The task of authorising officer for revenue and expenditure shall be carried out by a Director-General at the General Secretariat of the Council. The authorising officer shall implement the budget on behalf of the Deputy Secretary-General and within the limits of the appropriations allotted he may delegate his powers to a Director.

[F22. The authorising officer may decide on transfers between articles within each chapter. With the agreement of the SIS/SIRENE Working Party, he may decide on transfers between chapters within the same title. The SIS/SIRENE Working Party shall give its agreement under the same conditions as for adopting its opinion on the budget.]

F4Article 14U.K.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Article 15U.K.

The receipt of revenue and the disbursement of expenditure shall be carried out by an accounting officer from Directorate-General A at the General Secretariat of the Council.

Article 16U.K.

[F21. For the collection of any amount owing pursuant to Article 25, or of any debt due to the States concerned by a third party relating to the conclusion, installation and functioning of Sisnet, the issue of a recovery order by the authorising officer shall be required. Recovery orders shall be forwarded to the accounting officer.]

F42.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3.The accounting officer shall assume responsibility for the recovery orders duly drawn up.

Article 17U.K.

Notwithstanding Articles 5 and 6:

1.

the following deductions may be made from all bills, invoices or statements, which shall then be passed for payment of the net amount:

(a)

fines imposed on a party to a contract on an accepted tender;

(b)

adjustment of amounts paid in error, which may be achieved by means of deduction beforehand when another validation of the same type is being effected under the title, chapter, article and financial year in respect of which the excess payment was made.

Discounts, refunds and rebates on invoices and bills shall not be recorded as separate revenue;

2.

the following sums may be reused under the heading to which the initial expenditure was charged:

  • revenue arising from refund of amounts paid in error against appropriations entered in the budget.

Sums must be reused before the end of the financial year following that in which the revenue was collected.

Article 18U.K.

1.Any measure likely to involve expenditure against the budget must first be the subject of a proposal for a commitment of expenditure from the authorising officer to the accounting officer, showing the purpose, the amount involved, the budget item to which the expenditure is to be charged and the creditor.[F4 The proposal shall be submitted by the accounting officer to the financial controller for approval.]

F42.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Article 19U.K.

1.The purpose of validation of expenditure by the authorising officer shall be:

(a)to verify the creditor's claim;

(b)to determine or verify the existence and the amount of the sum due;

(c)to verify the conditions under which the payment falls due;

(d)to verify that purchases or services rendered are as ordered.

2.The authorising officer may have the verifications carried out under his responsibility.

Article 20U.K.

1.The authorising officer shall authorise the accounting officer, by the issue of a payment order (‘authorisation’), to pay an item of expenditure which has been validated.

2.The authorisation shall state:

(a)the financial year against which the payment shall be charged;

(b)the budget title, chapter and article;

(c)the amount to be paid, in figures and in words, and the currency of payment;

(d)the name and address of the creditor;

(e)the purpose of the expenditure;

(f)the method of payment[F2.]

[F4((g)] F4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3.The payment order shall be dated and signed by the authorising officer.

F44.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F45.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6.Any expenditure must be covered beforehand by contributions from the States referred to in Article 25 or, failing those, by a bank loan. The costs of a pre-financing loan in the event of non-payment of contributions shall be divided among the States in default, pro rata to their unpaid contributions and taking into account the length of arrears.

Article 21U.K.

[F3Payments shall be effected through a bank account specifically opened for that purpose in the name of the General Secretariat of the Council.] Bank transfer orders executed pursuant to this Financial Regulation shall require the joint signature of two officials nominated by the Deputy Secretary-General, of whom one shall be the accounting officer.

F4Article 22U.K.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

[F2Article 23 U.K.

The liability to disciplinary action of the authorising officer and accounting officer in the event of failure to comply with the provisions of this Financial Regulation shall be as laid down in the Staff Regulations of Officials of the European Communities.]

Article 24U.K.

The accounts shall be kept by the double-entry method on the basis of the calendar year. They shall show all revenue and expenditure for the financial year.

[F5CHAPTER III A U.K. Internal auditor

Article 24a U.K.

An internal auditor shall verify the proper operation of the budgetary implementation systems and procedures set out in this Regulation. By analogy, the internal auditor shall benefit from all the powers, shall perform all the tasks, and shall be subject to all the rules provided for in Council Regulation (EC, Euratom) No 1605/2002 of 25 June 2002 on the Financial Regulation applicable to the general budget of the European Communities (4) , in particular in Part I, Title IV, Chapter 8 thereof.]

CHAPTER IVU.K.States' contributions

Article 25U.K.

[F61. Budget revenue shall consist of financial contributions from the following Member States: Austria, Belgium, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Poland, Portugal, Slovakia, Slovenia, Spain, Sweden, United Kingdom, as well as Iceland, Norway and Switzerland.]

[F71a. From 1 January 2010 , the list of States referred to in paragraph 1 shall be extended to Bulgaria and Romania.

1b. From 1 January 2010 , the list of States referred to in paragraph 1 shall be extended to Liechtenstein.]

2.These States' financial contributions shall be laid down in the budget and expressed in euro.

[F6Article 26 U.K.

The states referred to in Article 25 shall supply their financial contributions to the Deputy Secretary-General.

The scale of contributions to be paid by the Member States referred to in Article 25, on the one hand, and by Iceland, Norway and Switzerland, on the other hand, shall be calculated annually on the basis of the share of each Member State concerned and of Iceland, Norway and Switzerland, in the total gross domestic product (GDP) for the preceding year of all the States referred to in Article 25. The scale of contributions by the Member States concerned shall be calculated annually, taking into account the contributions of Iceland, Norway and Switzerland, on the basis of the ratio of the VAT resources paid by each of those Member States to the total VAT resources of the European Communities, as established in the last amendment of the budget of the Union during the preceding financial year.]

[ F8. . . . .]

Article 27U.K.

1.The Deputy Secretary-General shall forward requests for contributions to each State referred to in Article 25 by letter through the national administrations whose details have been notified to him.

2.The letter concerned shall contain the following information:

(a)the decision to adopt the budget or, in the event of Article 9 being invoked, the decision to call up contributions by provisional twelfths;

(b)the amount to be paid by each State, calculated in euro in accordance with the scale referred to in Article 26;

(c)the details necessary for paying the contribution.

3.Contributions shall be paid into the bank account referred to in Article 21.

4.The contributions shall be payable in euro.

Article 28U.K.

[F91. The States referred to in Article 25 shall be required to pay 70 % of their contribution by 1 April, and 30 % by 1 October at the latest.]

F81a.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2.Should a State have defaulted on its financial obligations, the existing Community rules on interest chargeable in the event of late payment of contributions to the budget of the Union shall apply by analogy, without prejudice to any costs which must be borne by such State pursuant to the provisions of Article 20(6).

[F93. By way of derogation from paragraph 1, and without prejudice to Article 49, Bulgaria and Romania shall pay their entire respective contributions for 2010 by 31 December 2010 . Liechtenstein shall pay its entire respective contribution for 2010 by 31 December 2010 .]

F84.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

CHAPTER VU.K.Conclusion of contracts

Article 29U.K.

1.Contracts for the purchase or hiring of goods or for the provision of services shall be in writing.

[F1 [X12. All such contracts for which the estimated value equals or exceeds the thresholds set out in Directive 2004/18/EC] of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts (5) shall be concluded in accordance with the provisions of that Directive (hereinafter the Directive on public procurement).

3. Contracts for which the estimated value of the contract in question does not exceed the thresholds set out in the Directive on public procurement may be made by private treaty. In such cases, the Member States referred to in Article 25 shall none the less be bound, as far as possible and by all appropriate means, to enable suppliers who are likely to be able to supply the goods and services in question to compete.]

4.Invitations to tender shall, as a general rule, be published by the General Secretariat of the Council on behalf of the Member States referred to in Article 25 in all the Member States.

[F15. The tendering procedures and selection and award criteria shall be determined and governed by the provisions of the Directive on public procurement, as supplemented by the provisions of this Financial Regulation.]

6.Every invitation to tender shall be prepared by the General Secretariat of the Council on behalf of the Member States referred to in Article 25 and shall, in particular:

(a)specify the procedure for submitting tenders and stipulate how they are to be presented, including, in particular, any requirement as to the use of a standard reply form;

(b)make reference to the general conditions applicable to the contract concerned (supplies or services), where appropriate, and to any document containing conditions specifically applicable to the particular contract concerned;

(c)include a clause stating that the submission of a tender implies acceptance of the relevant conditions;

(d)specify the terms under which an inspection may be made, where appropriate, to be set out in detail in the case of on-the-spot inspections;

(e)specify the period during which a tender will remain valid and may not be varied in any respect;

(f)specify the penalties for failure to comply with the provisions of the contract;

(g)specify the details which must be contained in the invoices (or in the relevant supporting documents);

[F2(h) prohibit any contact between the Deputy Secretary-General and his staff, representatives of the Governments of the Member States referred to in Article 25, representatives of the Governments of Iceland, Norway and Switzerland and tenderers on matters related to that invitation to tender save, by way of special exception, under the following conditions:

before the closing date for the submission of tenders:

(i)

at the instance of tenderers:

additional information solely for the purpose of clarifying the nature of the invitation to tender may be communicated to all tenderers;

(ii)

at the instance of the Deputy Secretary-General:

if the Member States referred to in Article 25, or Iceland, Norway and Switzerland, or the General Secretariat of the Council notice an error, a lack of precision, an omission or any other type of clerical defect in the text of the invitation to tender, the General Secretariat may, in a manner identical to that applicable in respect of the original invitation to tender, inform the persons concerned accordingly;

(iii)

after the tenders have been opened and at the instance of the Member States referred to in Article 25, Iceland, Norway or Switzerland, or the General Secretariat of the Council, if some clarification is required in connection with a tender, or if obvious clerical errors contained in the tender must be corrected, the General Secretariat may contact the tenderer.]

Article 30U.K.

In every case where contact has been made under the conditions provided for in Article 29(6)(h), a ‘Note for the file’ shall be drawn up and such contact shall be mentioned in the report to be submitted subsequently to the Advisory Committee referred to in Article 36.

[F2Article 31 U.K.

No discrimination shall be practised between nationals of Member States and of Iceland, Norway and Switzerland on grounds of nationality in respect of contracts entered into by the Deputy Secretary-General on behalf of the Member States referred to in Article 25.]

Article 32U.K.

Where there are general conditions applicable to the proposed contract, they shall be attached to the invitation to tender. Any document containing conditions specifically applicable to the particular contract concerned shall also be attached.

Article 33U.K.

Tenderers may submit tenders:

(a)

by post:

in which case the invitation to tender must specify that the relevant date shall be that on which the tender is posted, as evidenced by the postmark. Tenders submitted by post must be registered; or

(b)

by hand-delivery to the Council General Secretariat direct or by any agent of the tenderer, including private messenger services:

in which case the invitation to tender must state the date by which tenders must be submitted and specify the department within the Council General Secretariat to which they must be delivered against a signed and dated receipt.

The date must be the same in both cases.

In order to maintain secrecy and to avoid any difficulties, the invitation to tender must include a provision as follows:

Tenders must be submitted in a sealed envelope itself enclosed within a second sealed envelope. The inner envelope shall bear, in addition to the name of the department to which it is addressed, as indicated in the invitation to tender, the words “Call for tenders — Not to be opened by the Registry”. If self-adhesive envelopes are used they must be sealed with adhesive tape and the sender must sign across this tape.

Article 34U.K.

Every tender must be opened.

[F2The tenders shall be opened together by a committee appointed for this purpose by the Deputy Secretary-General. It shall be composed of three high-level officials from different directorates of the Council General Secretariat.]

The committee shall draw up a report of the opening of the tender, to be signed by all its members.

Each page of each tender shall be initialled by at least one member of the committee. The committee shall make a written record of the tenders received, listing, in particular, all the documents which have been received from each tenderer in connection with the tender.

Article 35U.K.

[F2Every tender shall be assessed by the Member States referred to in Article 25, together with Iceland, Norway and Switzerland. A report, approved unanimously by these States, shall be presented by the competent official within the Council General Secretariat designated by the authorising officer or by an alternate, also designated by the authorising officer, to the Advisory Committee referred to in Article 36.]

This report shall include in particular:

(a)

a statement of the reasons for the elimination of any of the tenders;

(b)

a technical and financial assessment of each tender, including a comparative table of unit prices;

(c)

the grounds for the choice of tenderer recommended.

[F2Article 36 U.K.

Contracts to be concluded by the Deputy Secretary-General on behalf of the Member States referred to in Article 25 and by the appropriate representatives of Iceland, Norway and Switzerland after an invitation to tender has been issued shall first be submitted for the opinion of an Advisory Committee on procurements and contracts.]

Article 37U.K.

[F2The Advisory Committee referred to in Article 36 shall include one representative from each Member State referred to in Article 25, together with one representative from each of Iceland, Norway and Switzerland. The Member States referred to in Article 25, together with Iceland, Norway and Switzerland, shall ensure that the representatives selected have adequate expertise in informatics and/or financial matters and/or legal matters. Representatives must not have participated in the assessment of the files to be submitted to the Advisory Committee. A representative of the internal auditor shall be present as observer.]

The Advisory Committee shall, by simple majority, elect a Chairman and a deputy Chairman from among its representatives.

The Advisory Committee shall deliver an opinion as to whether the procedure leading to the selection of tenderer is in order and, in general, on the proposed terms of the contract.

Any other problem concerning the matter forming the subject of this chapter may be referred to the said Advisory Committee for an opinion.

[F9The Advisory Committee shall endeavour to adopt its opinions by consensus. If such consensus is not possible, the Advisory Committee shall adopt its opinions by a simple majority of its representatives. A quorum of 19 shall be required for the proceedings to be valid. In the event of a tied vote, the Chairman shall have the casting vote. From the date referred to in Article 25(1a), a quorum of 21 shall be required.]

The General Secretariat of the Council shall provide secretarial assistance to the Advisory Committee as necessary.

Article 38U.K.

The Advisory Committee shall draw up its own rules of procedure, by analogy with the rules of procedure of the Advisory Committee on Procurements and Contracts of the Council of the European Union.

Article 39U.K.

The Advisory Committee shall be required to give its opinion, in a purely advisory capacity, on:

(a)

[F1all proposed contracts for supplies or services, including studies, for which the estimated value equals or exceeds the thresholds in the Directive on public procurement;]

(b)

any proposed agreement supplementary to any contract as referred to in point (a) whenever there are significant changes, particularly when the effect of such supplementary agreement would be to alter the amount involved in the original contract;

(c)

any proposed supplementary agreement the effect of which would be to raise the total amount involved in a contract already concluded above the thresholds referred to in point (a);

(d)

questions arising at the time of conclusion or in the course of performance of contracts (e.g. cancellation of orders, requests for remission of penalties for delay, departures from the specifications and general conditions of contract), should the matter be sufficiently serious to justify a request for an opinion;

(e)

[F2at the request of one of the Member States referred to in Article 25 or of Iceland, Norway or Switzerland, or of a member of the Advisory Committee, or of the Deputy Secretary-General, proposed contracts involving an amount below the thresholds referred to in point (a), where they consider that such contracts involve questions of principle or are of a special nature.]

[F2Article 40 U.K.

The files submitted to the Advisory Committee for an opinion pursuant to Article 39(b) to (e), shall also be accompanied by a report approved unanimously by the Member States referred to in Article 25, as well as Iceland, Norway and Switzerland.]

[F2Article 41 U.K.

The opinions of the Advisory Committee shall be signed by its chairman. In order to avoid delays in the process as a result of the intervention of the Advisory Committee, the Member States referred to in Article 25, as well as Iceland, Norway and Switzerland, may, if they deem it necessary, impose a reasonable deadline by which an opinion must be furnished. Opinions shall be communicated to the Deputy Secretary-General and to the Member States referred to in Article 25, as well as to Iceland, Norway and Switzerland. Following due consideration of that opinion, the Member States referred to in Article 25, as well as Iceland, Norway and Switzerland, shall take a final decision on the case by unanimity. Once that decision has been taken, the contract or contracts which form the subject of each case shall be concluded by the Deputy Secretary-General on behalf of the Member States referred to in Article 25 and by the appropriate representatives of Iceland, Norway and Switzerland.]

Article 42U.K.

All the tenderers shall be informed by the General Secretariat of the Council of the decision taken with regard to their tenders.

Article 43U.K.

1.Contracts may be made against an invoice or bill of costs where the expected value of the goods or services does not exceed EUR 2 000.

2.By way of guarantee of the performance of contracts, suppliers, contractors or providers of services may be required by a warranty clause to make a preliminary deposit. Such deposit must cover not only the entire period of the guarantee but also a period long enough to allow the guarantee to be invoked. The deposit must, in principle, consist of a payment in euro made to a bank account specifically opened for that purpose in the name of the General Secretariat of the Council. Such deposit may only be lodged with a first-class credit institution in a sight- or short-term deposit account denominated in euro.

3.The amount of the deposit shall be fixed according to the usual trade terms and conditions.

[F14. The provision of such security shall be obligatory where the value of the contract concerned equals or exceeds the thresholds set out in the Directive on public procurement.]

5.This security may be replaced by a joint and several personal guarantee given by a third party approved by the accounting officer. The guarantee shall, in principle, be denominated in euro and must comply with the same rules as the guarantee referred to in paragraph 2.

[F26. Where a contract has not been performed or completion has been late, the Deputy Secretary-General shall ensure that the Member States referred to in Article 25, as well as Iceland, Norway and Switzerland, are adequately compensated in respect of all damages, interests and costs by the deduction of the amount from the deposit, whether this has been lodged directly by the supplier or contractor or by a third party.]

Article 44U.K.

The usual supporting documents accompanying the first order to pay drawn up pursuant to a contract requiring the provision of a deposit shall be supplemented by a copy, certified true by the accounting officer, of the receipt issued when the deposit was paid, or by a copy, certified true by the accounting officer, of a declaration from the establishment or third party providing the guarantee.

Article 45U.K.

Deposits shall be repaid, or the guarantees referred to in Article 43 given in place thereof released, by the Deputy Secretary-General in accordance with the provisions of the applicable contract or guarantee, except in cases of non-performance or late performance as referred to in Article 43(6).

CHAPTER VIU.K.Presenting and auditing the accounts

Article 46U.K.

[F21. The Deputy Secretary-General shall, within three months from the end of the budget implementation period, draw up a revenue and expenditure account and a balance sheet and transmit them to the SIS/SIRENE Working Party.]

2.The revenue and expenditure account shall cover all revenue and expenditure transactions relating to the preceding financial year. It shall be submitted in the same form and following the same subdivisions as the budget.

3.The following shall be attached to the account:

(a)a statement showing the situation of each of the States referred to in Article 25 as regards payment of its financial contribution, and

(b)an appropriation transfer statement.

4.The balance sheet shall show the budget assets and liabilities as at 31 December of the preceding financial year.

Article 47U.K.

1.The Court of Auditors shall be asked to audit the accounts.

2.The Deputy Secretary-General shall forward the revenue and expenditure account and the balance sheet to the Court of Auditors within 15 days following the period laid down in Article 46(1).

3.The purpose of the audit by the Court of Auditors shall be to establish that all revenue has been received and all expenditure incurred in a lawful and regular manner in accordance with the contracts to be managed, the budget and this Financial Regulation.

4.The Deputy Secretary-General shall provide the Court of Auditors with every facility it may consider necessary in order to carry out its task.

Article 48U.K.

The revenue and expenditure account, balance sheet and report by the Court of Auditors, accompanied where appropriate by the Deputy Secretary-General's comments, shall be submitted by 1 July to the States referred to in Article 25. The Member States referred to in Article 25, meeting within the Council, shall give a discharge to the Deputy Secretary-General in respect of the budget's implementation.

CHAPTER VIIU.K.Final provisions

Article 49U.K.

The introduction of the provisions of the Schengen acquis concerning the Schengen information system for a State other than those referred to in Article 25 (hereinafter referred to as ‘other State’) shall entail:

(a)

readjustment of the share of contributions of the States referred to in Article 25 as laid down in Article 26;

(b)

adjustment of the contributions of the States referred to in Article 25 in order to establish the contribution payable by the other State to the operation of Sisnet for the whole of the current financial year;

(c)

[F9adjustment of the contributions of the States referred to in Article 25 in order to establish the proportion of earlier SISNET installation costs to be borne by the other State. This percentage shall be calculated on the basis of the ratio of the VAT resources paid by the other State to the total VAT resources of the European Communities for the preceding financial year. If no data on VAT resources is available, the adjustment of contributions shall be calculated on the basis of the share of each Member State concerned in the total GDP of all the Member States referred to in Article 25. The percentage contribution shall be the subject of a credit note to the States referred to in Article 25, for an amount pro rata to their share as calculated in accordance with Article 26.]

Article 50U.K.

1.This Financial Regulation shall apply to the adoption of the budget with respect to the revenue and expenditure required to meet the obligations arising out of any action taken pursuant to Article 1 of Decision 1999/870/EC, for the financial year in which this Regulation enters into force.

[F22. By derogation from Article 8, for the purposes of the budget referred to in paragraph 1, the Deputy Secretary-General of the Council shall forward the preliminary draft budget to the SIS/SIRENE Working Party as soon as possible after the adoption of this Financial Regulation. Following the delivery of the opinion of the SIS/SIRENE Working Party and the establishment of the draft budget, the Member States referred to in Article 25, meeting within the Council, shall adopt the budget without delay.]

3.By derogation from Article 28, for the purposes of the budget referred to in paragraph 1, the States referred to in Article 25 shall be required to pay their contribution in accordance with a schedule to be determined by the Member States referred to in Article 25 at the time of adoption of this budget.

Article 51U.K.

1.This Decision shall take effect from the date of its adoption.

2.It shall be published in the Official Journal of the European Communities.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources