SCHEDULE 1E+WAUTHORISED DEVELOPMENT

Commencement Information

I1Sch. 1 in force at 14.4.2020, see art. 1

132kV UNDERGROUND CABLE (Associated Development)E+W

Work No. 2 the construction and installation and keeping of a 132kV underground cable and fibre optic cable 1.2km in length from Oswestry substation connecting to Work No.3 at a terminal structure at Long Wood (grid reference: SJ 3113229877) comprising three 132kV single core cables together with a fibre optic cable installed in 200mm diameter polyethylene ducts laid in trefoil formation together with the installation of cable protection tiles above at a depth of approximately 1.4m to ensure a final minimum depth of 975mm and as shown on sheet 1 of the works plans; and

(a)site preparation works and site clearance (including fencing, felling and vegetation removal);

(b)earthworks (including soil stripping and storage and site levelling);

(c)carrying out surveys or taking soil samples;

(d)establishment of temporary laydown and storage areas, temporary vehicle parking and construction fencing;

(e)cutting down, uprooting, topping or lopping of trees or shrubs or cutting back their roots;

(f)reinstatement hedgerow planting;

(g)establishment of temporary means of access and trackways;

(h)drainage works;

(i)ramps, means of access, footpaths and bridleways;

(j)works to alter the position of apparatus, including mains, sewers, drains and cables;

(k)works to alter the course of, or otherwise interfere with a watercourse;

(l)works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;

(m)works for the benefit or protection of land affected by the authorised development;

(n)the removal, disposal or re-siting of apparatus;

(o)open trench excavations and directional drilling.