The Progress Power (Gas Fired Power Station) Order 2015

Highway accesses

6.—(1) No authorised development comprised in numbered works 1, 3 and 7 shall commence until for that numbered work, written details of the siting, design and layout (to the extent either not provided as part of or differing from, the details contained in Schedule 1, the works plans or the rights of way, streets and access plan) of any new permanent or temporary means of access to a highway to be used by vehicular traffic (including those identified in Schedule 3), or any alteration to an existing means of access to a highway used by vehicular traffic has been submitted to and approved by the relevant planning authority (in consultation with the highway authority).

(2) The highway accesses must be constructed in accordance with the approved details and in accordance with the drawing at Appendix A and Appendix B to the outline construction traffic management plan.

(3) Prior to the date of final commissioning, a reinstatement plan for those elements of numbered work 7 which enable connectivity between Old Norwich Road and the A140 must be submitted to and approved by the relevant planning authority, in consultation with the highway authority. The reinstatement plan must include—

(a)measures to reinstate the A140 carriageway to its pre-construction condition; and

(b)a landscaping plan showing how the land outside the A140 carriageway will be reinstated.

(4) The reinstatement plan must be implemented as approved.