Chwilio Deddfwriaeth

The Flood and Water Management Act 2010 (Commencement No. 2, Transitional and Savings Provisions) (England) Order 2013

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

 Help about opening options

Dewisiadau Agor

Changes over time for: Section 4

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Flood and Water Management Act 2010 (Commencement No. 2, Transitional and Savings Provisions) (England) Order 2013, Section 4. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Transitional and savings provisionsE+W+S

4.—(1) Until paragraphs 2, 10 and 25 of Schedule 4 to the 2010 Act are brought fully into force in relation to England, references in sections A1(3) and (6), 6(6A) and 13(1) and (3) of the 1975 Act to “10,000” are to be read as references to “25,000”.

(2) For the relevant period, sections 11, 12 and 21(5) of the 1975 Act continue to apply in relation to a large raised reservoir in England as though paragraphs 16, 17 and 18 of Schedule 4 to the 2010 Act had not been brought into force in relation to England.

(3) In paragraph (2), “the relevant period” means the period beginning on 30th July 2013 and ending on the first date on which the Environment Agency gives notice to the undertaker of the large raised reservoir—

(a)that it has designated the reservoir as high-risk under section 2B(1) of the 1975 Act; or

(b)that it has not designated the reservoir as high-risk (whether or not having made a provisional designation under section 2A of the 1975 Act).

(4) But where the undertaker of a large raised reservoir who has been given a notice under section 2B(1) of the 1975 Act brings an appeal against the designation of the reservoir as high-risk, “the relevant period” in relation to that reservoir ends on the date on which the First-tier Tribunal either confirms or cancels the designation.

(5) In this article, “large raised reservoir” and “undertaker” have the same meanings as in section 1(1) and (4) respectively of the 1975 Act(1) as in force immediately before 30th July 2013.

(1)

Section 1(4) is amended by the Water Act 1989 (c. 15), Schedule 25, paragraph 49, and S.I. 1996/593, regulation 2 and Schedule 1.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill