Chwilio Deddfwriaeth

Acquisition of Land Act 1981

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Changes over time for: Acquisition of Land Act 1981

 Help about opening options

Alternative versions:

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to Acquisition of Land Act 1981. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to :

  • s. 7(3) words inserted by 2023 c. 55 Sch. 18 para. 3(2)(a)(i)
  • s. 7(3) words inserted by 2023 c. 55 Sch. 18 para. 3(2)(a)(ii)
  • s. 11(3) excluded by S.I. 2021/51 Sch. 9 para. 32(1) (This amendment not applied to legislation.gov.uk. S.I. 2021/51 removed from the website by request from the Department of Transport dated 12th July 2021 which followed the decision of the High Court of Justice to quash these Regulations in the judgement dated 8th July 2021 (High Court of Justice — Planning Court — The Queen (on the application of Mair Bain) v. Secretary of State for Transport — Case No. CO/642/2021).)
  • s. 16(3)(b) words omitted by 2012 c. 7 Sch. 14 para. 48
  • s. 17(4) words omitted by 2012 c. 7 Sch. 14 para. 49
  • s. 31(1)(a) words inserted by 2023 asc 3 Sch. 13 para. 57
  • Sch. 2 Pt. 3 incorporated (with modifications) by S.I. 2015/680 art. 19
  • Sch. 2 Pt. 2 3 incorporated (with modifications) by S.I. 2020/1297 art. 20 (This amendment not applied to legislation.gov.uk. S.I. 2020/1297 was withdrawn following a request from the Department of Transport dated 9th August 2021 which followed the decision of the High Court of Justice to quash this Order in the judgement dated 2nd August 2021 (High Court of Justice — Planning Court — The Queen (on the application of Save Stonehenge World Heritage Site) v. Secretary of State for Transport — Case No. CO/4844/2020))
  • Sch. 2 Pt. 2 incorporated (with modifications) by S.I. 2021/51 art. 24 (This amendment not applied to legislation.gov.uk. S.I. 2021/51 removed from the website by request from the Department of Transport dated 12th July 2021 which followed the decision of the High Court of Justice to quash these Regulations in the judgement dated 8th July 2021 (High Court of Justice — Planning Court — The Queen (on the application of Mair Bain) v. Secretary of State for Transport — Case No. CO/642/2021).)
  • Sch. 2 Pt. 3 incorporated (with modifications) by S.I. 2021/51 art. 24 (This amendment not applied to legislation.gov.uk. S.I. 2021/51 removed from the website by request from the Department of Transport dated 12th July 2021 which followed the decision of the High Court of Justice to quash these Regulations in the judgement dated 8th July 2021 (High Court of Justice — Planning Court — The Queen (on the application of Mair Bain) v. Secretary of State for Transport — Case No. CO/642/2021).)
  • Sch. 2 Pt. 2 3 incorporated (with modifications) by S.I. 2024/752 art. 25
  • Sch. 2 Pt. 2 3 incorporated (with modifications) by S.I. 2024/943 art. 47
  • Sch. 2 Pt. 2 3 incorporated (with modifications) by S.I. 2024/958 art. 31

Changes and effects yet to be applied to the whole Act associated Parts and Chapters:

Whole provisions yet to be inserted into this Act (including any effects on those provisions):

Legislation Crest

Acquisition of Land Act 1981

1981 CHAPTER 67

An Act to consolidate the Acquisition of Land (Authorisation Procedure) Act 1946 and related enactments.

[30th October 1981]

Modifications etc. (not altering text)

C6Power to modify Act conferred (1.12.1991) by Land Drainage Act 1991 (c. 59, SIF 73:1), ss. 62(5)(b), 76(2) (with ss. 67(3)(5)(8))

C7Act applied (1.12.1991) by Water Industry Act 1991 (c. 56, SIF 130), ss. 155(4), 223(2) (with ss. 82(3), 186(1), 222(1), Sch. 14 para. 6)

Act applied (with modifications) (1.12.1991) by Water Resources Act 1991 (c. 57, SIF 130), ss. 154(4), 225(2) (with saving in s. 182 and with ss. 16(6), 179, 222(3), Sch. 22 para. 1, Sch. 23 para. 6)

Act applied (1.12.1991) by Land Drainage Act 1991 (c. 59, SIF 73:1), ss. 62(3), 76(2)(with ss. 67(3)(5)(8), 72(6), 74(3)(4)) Act applied (with modifications) (6. 5. 1992) by Further and Higher Education Act 1992 (c. 13), s. 40(6); S.I. 1992/831, art. 2, Sch.1

Act applied (with modifications) (10.11.1993) by 1993 c. 28, ss. 162(4), 169, Sch. 20 Pt. I; S.I. 1993/2762, art. 3.

Act applied (with modifications) (1.1.1994) by 1993 c. 35, s. 42(6) (with s. 155(11)); S.I. 1993/3106, art. 4, Sch.

Act applied (1.4.1994) by 1993 c. 35, ss. 3, 4, 308(3), Sch. 1 para. 2(2); S.I. 1994/507, art. 4, Sch. 2

Act applied (E.W.) (with modifications) (30.10.1994) by S.I. 1994/2716, art. 98(3)

Act applied (with modifications) (1.3.1996) by 1995 c. 45, s. 16(1), Sch. 4 para. 2(11)(d); S.I. 1996/218, art. 2

Act applied (1.11.1996) by 1995 c. 45, ss. 20, 21, Sch. 2 para. 3(2)

Act applied (1.11.1996) by 1996 c. 56, ss. 20, 21, 583(2), Sch. 2 para. 3(2) (with s. 1(4)) (which Sch. 2 is prospectively repealed by 1998 c. 31, ss. 140(1)(3), 145(2)-(5) Sch. 30 para. 185, Sch. 31)

Act applied (with modifications) (1.11.1996) by 1996 c. 56, ss. 205(6), 583(2) (with s. 1(4)) (which s. 205 is prospectively repealed by 1998 c. 31, ss. 145(4)(5), 140(1)(3), Sch. 30 para. 70, Sch. 31)

Act applied (18.12.1996) by 1996 c. 61, s. 5(4)

Act applied (with modifications) (1.10.1998) by Welsh Development Agency Act 1975 c. 70, Sch. 4 Pt. I para. 1(1) (as inserted (1.10.1998) by 1998 c. 38, s. 127, Sch. 13 para. 3 (with ss. 139(2), 143(2)); S.I. 1998/2244, art. 4

Act applied (with modifications) (25.11.1998 for specified purposes and otherwise 3.7.2000) by 1998 c. 45, ss. 20(4)(5), 43, Sch. 5 Pt. I; S.I. 1998/2952, art. 2; S.I. 2000/1173, art. 2(c)

Act applied (E.) (4.1.2000) and (W.) (prosp.) by 1977 c. 49, Sch. 5A para. 19(2) (as inserted (E.) (4.1.2000) and (W.) (prosp.) by 1999 c. 8, ss. 2(2), 67(1), Sch. 1; S.I. 1999/2342, art. 2(3)(a), Sch. 2)

Act applied (3.7.2000) by 1999 c. 29, s. 156(8), Sch. 11 para. 19(1)(2) (with Sch. 12 para. 9(1)); S.I. 2000/801, art. 2(c), Sch. Pt. 3

Act applied (28.7.2000) by 2000 c. 21, s. 131, Sch. 8 para. 3(6)

Act: applied (with modifications) (E.) (2.3.2001) by S.I. 2001/1368, art. 8

C8Act (except ss. 8(4), 32(6)): transfer of certain functions (1.7.1999) by S.I. 1999/672, art. 2, Sch. 1

C10Act applied (26.7.2002) by Education Act 1996 (c. 56), Sch. 35A para. 3(6) (as inserted (26.7.2002) by Education Act 2002 (c. 32), s. 65, Sch. 7 Pt. 1 {para. 1} (with ss. 210(8), 214(4)); S.I. 2002/2002, art. 2)

C11Act applied (with modifications) (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 4 para. 3(4) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3)); S.I. 2003/3142, art. 3(2) (with art. 11)

C13Act applied by 1994 c. 21, s. 4C(4) (as inserted (1.4.2004) by Water Act 2003 (c. 37), ss. 85(1), 105(3); S.I. 2004/641, art. 3(w) (with Sch. 3 para. 7))

C14Act applied (with modifications) (3.8.2005) by The Greater Manchester (Leigh Busway) Order 2005 (S.I. 2005/1918), art. 22

C15Act applied (coming into force in accordance with s. 208(4) of the amending Act) by National Health Service (Wales) Act 2006 (c. 42), Sch. 3 para. 27 (with s. 19(3))

C16Act applied (coming into force in accordance with s. 208(4) of the amending Act) by National Health Service (Wales) Act 2006 (c. 42), s. 159(5) (with s. 19(3))

C17Act applied (coming into force in accordance with s. 208(4) of the amending Act) by National Health Service (Wales) Act 2006 (c. 42), Sch. 2 para. 20(2) (with s. 19(3))

C21Act applied (with modifications) (16.5.2008) by The London Gateway Port Harbour Empowerment Order 2008 (S.I. 2008/1261), arts. 30, 33 (with arts. 41(1), 45, 54(2), 55, 56, 57, 58(6))

C22Act applied (22.7.2008) by Crossrail Act 2008 (c. 18), s. 7(6)

C23Act applied (with modifications) (1.12.2008) by Housing and Regeneration Act 2008 (c. 17), s. 325(1), Sch. 2 para. 1; S.I. 2008/3068, art. 2(1)(d) (with arts. 6-13)

C25Act applied by 2010 c. 32, Sch. 1 para. 5(6) (as substituted (1.2.2012) by Education Act 2011 (c. 21), s. 82(3), Sch. 14 para. 1; S.I. 2012/84, art. 3 (with art. 5))

C27Act applied by 2004 c. 21, s. 4D(16) (as inserted (31.1.2017 for specified purposes, 3.4.2017 in so far as not already in force) by Policing and Crime Act 2017 (c. 3), s. 183(1)(5)(e), Sch. 1 para. 5; S.I. 2017/399, reg. 2, Sch. para. 38)

C32Act: power to amend conferred (26.12.2023) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 132, 255(3)(a) (with s. 247)

Commencement Information

I1Act wholly in force at 30.1.1982, see s. 35(2)

Part IE+W General

Modifications etc. (not altering text)

1 Application of Act.E+W

(1)In this Act “compulsory purchase” means a compulsory purchase of land, being—

(a)a compulsory purchase to which this Act applies by virtue of any other enactment, whether or not passed or made before this Act, or

(b)a compulsory purchase under an enactment specified in subsection (2) below.

(2)The enactments referred to in subsection (1)(b) above are—

  • section 2 of the M1Metropolitan Police Act 1886,

  • section 1(3) of the M2Military Lands Act 1892,

  • sections 25(1) and 39(1) of the M3Small Holdings and Allotments Act 1908,

  • section 5(1) of the M4Development and Road Improvement Funds Act 1909 as it applies to acquisition by local authorities (as defined in section 7(1) of this Act) or the Secretary of State,

  • F1...

  • F2 . . .

  • [F3section 530(1) of the Education Act 1996],

  • F2. . .

(3)In this section “enactment” includes any statutory instrument.

Compulsory purchaseE+W

2 Procedure for authorisation.E+W

(1)The authorisation of a compulsory purchase shall be conferred by an order (in this Act called a “compulsory purchase order”).

[F4(2)A compulsory purchase order authorising a compulsory purchase by an authority other than a Minister is to be—

(a)made by that authority,

(b)submitted to the confirming authority, and

(c)confirmed in accordance with Part 2 of this Act.]

(3)A compulsory purchase order authorising a compulsory purchase by a Minister shall be made by the Minister in accordance with Schedule 1 to this Act.

Textual Amendments

F4S. 2(2) substituted (6.4.2018 for specified purposes, 6.4.2019 in so far as not already in force) by Housing and Planning Act 2016 (c. 22), ss. 181(3), 216(3); S.I. 2018/251, reg. 4(b) (with reg. 5); S.I. 2019/427, reg. 3 (with reg. 4)

Modifications etc. (not altering text)

[F52ATunnels etcE+W

(1)A compulsory purchase order may provide that in the following provisions, a reference to land (however expressed) does not include specified land that is at least 9 metres or more below the surface.

(2)The provisions mentioned in subsection (1) are—

(a)Schedule 2A of the Compulsory Purchase Act 1965 (objection to division of land),

(b)any substituted version of that Schedule that applies by virtue of provision made by or under any Act, and

(c)Schedule A1 to the Compulsory Purchase (Vesting Declarations) Act 1981 (objection to division of land).]

3 Minerals.E+W

Schedule 2 to this Act (exception of minerals from purchases etc.) shall have effect.

4 Assessment of compensation.E+W

(1)In relation to a compulsory purchase the M5Land Compensation Act 1961 shall have effect subject to the provisions of this section.

(2)The [F6Upper Tribunal] shall not take into account any interest in land, or any enhancement of the value of any interest in land, by reason of any building erected, work done or improvement or alteration made, whether on the land purchased or on any other land with which the claimant is, or was at the time of the erection, doing or making of the building, works, improvement or alteration, directly or indirectly concerned, if the [F6Upper Tribunal] is satisfied that the creation of the interest, the erection of the building, the doing of the work, the making of the improvement or the alteration, as the case may be, was not reasonably necessary and was undertaken with a view to obtaining compensation or increased compensation.

Textual Amendments

Modifications etc. (not altering text)

C37S. 4 modified (13. 2. 1992) by Severn Bridges Act 1992 (c. 3), s. 2(6), Sch. 2 Pt. II para.5

S. 4 modified (28.7.1998) by 1998 c. iv, s. 9 (with s. 41)

C39S. 4 extended (18.12.1996) by 1996 c. 61, s. 4, Sch. 4 Pt. III para. 16

C41S. 4 applied (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 6 para. 20

Marginal Citations

SupplementalE+W

5 Local inquiries.E+W

(1)For the purposes of the execution of his powers and duties under this Act, a Minister may cause to be held such public local inquiries as are directed by this Act and such other public local inquiries as he may think fit.

(2)Subsections (2) and (3) of section 250 of the M6Local Government Act 1972 (giving of evidence on inquiries) shall apply to a public local inquiry held in pursuance of this Act.

(3)In relation to—

(a)a proposed acquisition of land by an authority other than a Minister, or

(b)the proposed extinction under Part VI of this Act of a right of way over land acquired or proposed to be acquired by an authority other than a Minister,

subsections (4) and (5) of the said section 250 (defraying of costs of inquiries) shall apply to a public local inquiry held in pursuance of this Act.

[F7(4)In relation to each of the matters mentioned in paragraphs (a) and (b) of subsection (3), section 250(5) of the Local Government Act 1972 also applies—

(a)where arrangements are made for a public local inquiry to be held in England in pursuance of this Act but the inquiry does not take place;

(b)to the costs of a party to a public local inquiry held in England in pursuance of this Act who does not attend the inquiry.]

Textual Amendments

Marginal Citations

[F85APower to require informationE+W

(1)This section applies to information about land in relation to which an acquiring authority is entitled to exercise a power of compulsory purchase.

(2)The acquiring authority may serve a notice on a person mentioned in subsection (4) requiring him to give to the authority in writing the following information—

(a)the name and address of any person he believes to be an owner, lessee, tenant (whatever the tenancy period) or occupier of the land;

(b)the name and address of any person he believes to have an interest in the land.

(3)The power in subsection (2) is exercisable for the purpose of enabling the acquiring authority to acquire the land.

(4)The persons are—

(a)the occupier of the land;

(b)any person who has an interest in the land either as freeholder, mortgagee or lessee;

(c)any person who directly or indirectly receives rent for the land;

(d)any person who, in pursuance of an agreement between himself and a person interested in the land, is authorised to manage the land or to arrange for the letting of it.

(5)The notice must specify the period within which the information must be given to the acquiring authority (being a period of not less than 14 days beginning with the day on which the notice is served).

(6)The notice must also specify or describe—

(a)the land,

(b)the compulsory purchase power, and

(c)the enactment which confers the power.

(7)The notice must be in writing.

(8)Section 6(4) does not apply to notices to be served under this section.

Textual Amendments

Modifications etc. (not altering text)

C44S. 5A power to apply (with modifications) conferred (16.7.2014 for E. for specified purposes, 2.12.2014 for E. in so far as not already in force) by Business Rate Supplements Act 2009 (c. 7), s. 32, Sch. 2 para. 8(2)(a) (with s. 31); S.I. 2014/1860, art. 2; S.I. 2014/3200, art. 2

5BOffences relating to informationE+W

(1)A person commits an offence if he fails without reasonable excuse to comply with a notice served on him under section 5A.

(2)A person commits an offence if, in response to a notice served on him under section 5A—

(a)he gives information which is false in a material particular, and

(b)when he does so, he knows or ought reasonably to know that the information is false.

(3)If an offence under this section committed by a body corporate is proved to have been committed with the consent or connivance of, or to be attributable to any neglect on the part of—

(a)a director, manager, secretary or other similar officer of the body corporate, or

(b)a person purporting to act in any such capacity,

he, as well as the body corporate, is guilty of that offence and liable to be proceeded against accordingly.

(4)The reference in subsection (3) to a director must be construed in accordance with section 331(2) of the Town and Country Planning Act 1990.

(5)A person guilty of an offence under this section is liable on summary conviction to a fine not exceeding level 5 on the standard scale.]

Textual Amendments

Modifications etc. (not altering text)

C46S. 5B power to apply (with modifications) conferred (16.7.2014 for E. for specified purposes, 2.12.2014 for E. in so far as not already in force) by Business Rate Supplements Act 2009 (c. 7), s. 32, Sch. 2 para. 8(2)(b) (with s. 31); S.I. 2014/1860, art. 2; S.I. 2014/3200, art. 2

6 Service of documents.E+W

(1)Any notice or other document required or authorised to be served under this Act may be served on any person either by delivering it to him, or by leaving it at his proper address, or by post, so however that the document shall not be duly served by post unless it is sent by registered letter, or by the recorded delivery service.

(2)Any such document required or authorised to be served upon an incorporated company or body shall be duly served if it is served upon the secretary or clerk of the company or body.

(3)For the purposes of this section and of section 7 of the M7Interpretation Act 1978 the proper address of any person upon whom any such document as aforesaid is to be served shall, in the case of the secretary or clerk of any incorporated company or body, be that of the registered or principal office of the company or body, and in any other case be the last known address of the person to be served:

Provided that where the person to be served has furnished an address for service, his proper address for the purposes aforesaid shall be the address furnished.

(4)If the authority or Minister having jurisdiction to make the order in connection with which the document is to be served is satisfied that reasonable inquiry has been made and that it is not practicable to ascertain the name or address of an owner, lessee [F9, tenant] or occupier of land on whom any such document as aforesaid is to be served, the document may be served by addressing it to him by the description of “owner”, “lessee” [F10, “tenant”] or “occupier” of the land (describing it) to which it relates, and by delivering it to some person on the [F11land or, if there is no person on the land to whom it may be delivered, by leaving it or a copy of it on or near the land].

Textual Amendments

F9Word in s. 6(4) inserted (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 100(2)(a) (with s. 100(8)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

F10Word in s. 6(4) inserted (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 100(2)(b) (with s. 100(8)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

Modifications etc. (not altering text)

C47S. 6 applied (13. 2. 1992) by British Railways Act 1992 (c. i), s.17(2).

C48S. 6 applied (with modifications) (18.12.1996) by 1996 c. 61, s. 2, Sch. 2 paras. 6(8), 7(8)

S. 6 applied (with modifications) (21.7.1994) by 1994 c. xi, s. 23(2)(with s. 39)

S. 6 applied (with modifications) (21.7.1994) by 1994 c. xv, s. 22(b)(with s. 47)

C49S. 6 applied (with modifications) (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 2 paras. 5(8), 6(8)

Marginal Citations

InterpretationU.K.

7 Interpretation.E+W

(1)In this Act, except where the context otherwise requires—

  • acquiring authority”, in relation to a compulsory purchase, means the Minister, local authority or other person who may be authorised to purchase the land compulsorily,

  • [F12appropriate website”, in relation to a notice about a proposed compulsory purchase, means a website which members of the public could reasonably be expected to find on searching on the internet for information about the scheme or project that underlies the proposed purchase,]

  • compulsory purchase order” means an order under section 2(1) above,

  • confirming authority”, in relation to a compulsory purchase, means, where the acquiring authority is not a Minister, the Minister having power to authorise the acquiring authority to purchase the land compulsorily,

  • land”—

(a)includes messuages, tenements and hereditaments, and

(b)in relation to compulsory purchase under any enactment, includes anything falling within any definition of the expression in that enactment,

  • local authority” means—

F13(a)a billing authority or a precepting authority, as defined in section 69 of the Local Government Finance Act 1992;

(a1)[F14the London Fire Commissioner;]

(aa)[F15a fire and rescue authority in Wales constituted by a scheme under section 2 of the Fire and Rescue Services Act 2004 or a scheme to which section 4 of that Act applies;]

(b)a levying body within the meaning of section 74 of [F16the Local Government Finance Act 1988] ;

(c)a body as regards which section 75 of that Act applies;

(d)any joint board or joint committee if all the constituent authorities are such authorities as are described in paragraphs (a) to (c); and

(e)the Honourable Society of the Inner Temple or the Honourable Society of the Middle Temple,

  • National Trust” means the National Trust for Places of Historic Interest or Natural Beauty incorporated by the M8National Trust Act 1907,

  • owner” in relation to any land, means a person, other than a mortgagee not in possession, who is for the time being entitled to dispose of the fee simple of the land, whether in possession or in reversion, and includes also a person holding or entitled to the rents and profits of the land under a lease or agreement, the unexpired term whereof exceeds three years [F17and a person who would have power to sell and convey or release the land to the acquiring authority if a compulsory purchase order were operative],

  • prescribed”: see subsection (2) below.

[F18“universal service provider” has the same meaning as in [F19Part 3 of the Postal Services Act 2011] ; and references to the provision of a universal postal service shall be construed in accordance with [F20that Part] .]

(2)Anything which, by Part II or III of this Act, or Schedule 1 or 3 of this Act, is required or authorised to be prescribed shall be prescribed by regulations made by the Secretary of State by statutory instrument.

[F21(3)But an instrument containing regulations made for the purposes of section 13A or [F22section 15A(11) or] paragraph 4A of Schedule 1 is subject to annulment in pursuance of a resolution of either House of Parliament.]

Subordinate Legislation Made

P1s. 7 power exercised by S.I. 1982/6, 1990/613

Textual Amendments

F12Words in s. 7(1) inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(2), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F13S. 7(1): in definition of “local authority” paras. (a)(aa) substituted (2.11.1992) for para. (a) by Local Government Finance Act 1992 (c. 14), s. 117(1), Sch. 13 para. 52; S.I. 1992/2454, art. 2

F14Words in s. 7(1) substituted (31.1.2017 for specified purposes, 1.4.2018 in so far as not already in force) by Policing and Crime Act 2017 (c. 3), s. 183(1)(5)(e), Sch. 2 para. 63; S.I. 2018/227, reg. 4(c)

F15Words in s. 7(1) substituted (1.10.2004 except in relation to W., 10.11.2004 for W.) by Fire and Rescue Services Act 2004 (c. 21), s. 61, Sch. 1 para. 53(1)(2); S.I. 2004/2304, art. 2; S.I. 2004/2917, art. 2

F16Words in s. 7(1) substituted (1.10.2004 except in relation to W., 10.11.2004 for W.) by Fire and Rescue Services Act 2004 (c. 21), s. 61, Sch. 1 para. 53(1)(3); S.I. 2004/2304, art. 2; S.I. 2004/2917, art. 2

F17Words in s. 7 (definition of “owner”) inserted (25.9.1991) by Planning and Compensation Act 1991 (c. 34, SIF 28:1), s. 70, Sch. 15 para. 9; S.I. 1991/2067, art. 3

F18S. 7(1): definition of “universal service provider” inserted (26.3.2001 subject to art. 1(3) of the amending S.I.) by S.I. 2001/1149, arts. 1, 54(2)

F21S. 7(3) added (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 100(3) (with s. 100(8)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

F22Words in s. 7(3) inserted (31.3.2024 for W. for specified purposes, 30.4.2024 for E.) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 190(1)(a), 255(7) (with s. 247); S.I. 2024/92, reg. 4 (with reg. 6(6)); S.I. 2024/389, reg. 2(l)

Marginal Citations

M81907 c. cxxxvi

8 Statutory undertakers.E+W

(1)In this Act, unless the context otherwise requires, “statutory undertakers” means—

(a)any person authorised by any enactment to construct, work or carry on—

(i)any railway, light railway, tramway, road transport, water transport, canal or inland navigation undertaking, or

(ii)any dock, harbour, pier or lighthouse undertaking, or

(iii)any undertaking for the supply of . . . F23, . . . F24, [F25or hydraulic power], or

(b). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F26 the Civil Aviation Authority [F27or a person who holds a licence under Chapter I of Part I of the Transport Act 2000 (to the extent that the person is carrying out activities authorised by the licence)], or

(c)[F28a universal service provider in connection with the provision of a universal postal service] . . . F29,

  • and in this subsection “enactment” means any Act or any order or scheme made under or confirmed by an Act.

[F30(1ZA)The undertaking of a person who holds a licence under Chapter I of Part I of the Transport Act 2000 shall not be considered to be a statutory undertaking for the purposes of this Act except to the extent that it is the person’s undertaking as licence holder; and references in this Act to the person’s undertaking shall be construed accordingly.]

[F31(1A)The undertaking of a universal service provider so far as relating to the provision of a universal postal service shall be taken to be his statutory undertaking for the purposes of this Act; and references in this Act to his undertaking shall be construed accordingly.]

(2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F32

(3)In this Act “the appropriate Minister” means, in relation to any statutory undertakers, the Secretary of State.

(4)If any question arises under this Act which Minister is the appropriate Minister, the question shall be determined by the Treasury.

Textual Amendments

F27Words in s. 8(1)(b) inserted (21.12.2001) by S.I. 2001/4050, art. 2, Sch. para 5(a)(i)

F28Words in s. 8(1)(c) substituted (26.3.2001 subject to art. 1(3) of the amending S.I.) by S.I. 2001/1149, arts. 1(3), 54(3)(a)

F30S. 8(1ZA) inserted (21.12.2001) by S.I. 2001/4050, art. 2, Sch. para. 5(a)(ii)

F31S. 8(1A) inserted (26.3.2001 subject to art. 1(3) of the amending S.I.) by S.I. 2001/1149, arts. 1(3), 54(3)(b)

9 Land held inalienably.E+W

For the removal of doubt it is hereby declared that any power conferred—

(a)under this Act, or

(b)by or under the Acquisition of Land (Authorisation Procedure) Act 1946, or any enactment passed before the commencement of that Act,

to purchase land compulsorily is, except in so far as any express provision of any such enactment restricts the exercise of the power, exercisable notwithstanding any other enactment providing that the land shall be inalienable.

Part IIE+W Purchases By Local And Other Authorities

Modifications etc. (not altering text)

C50Pts. 2, 3 applied (with modifications) (28.1.2005) by The East Midlands Parkway Station (Land Acquisition) Order 2005 (S.I. 2005/8), arts. 1, 11

C53Pt. 2 restricted (coming into force in accordance with s. 208(4) of the amending Act) by National Health Service (Wales) Act 2006 (c. 42), s. 208(1), Sch. 2 para. 20(3) (with s. 19(3))

C54Pt. 2 incorporated (with modifications) (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 24 (with arts. 51, 57)

C55Pts. 2, 3 incorporated (with modifications) (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 22 (with art. 32, Sch. 9 para. 36)

C56Parts II-IV applied (31.10.1994) by Opencast Coal Act 1958 c. 69, s. 16(4A) as substituted (31.10.1994) by 1994 c. 21, s. 52, Sch. 8 para. 14(5)(with s. 40(7)); S.I. 1994/2553, art. 2

Pt. II (ss. 10-15) restricted (E.) (4.1.2000) and (W.) (prosp.) by 1977 c. 49, Sch. 5A para. 19(3) (as inserted (E.) (4.1.2000) and (W.) (prosp.) by 1999 c. 8, ss. 2(2), 67(1), Sch. 1; S.I. 1999/2342, art. 2(3)(a), Sch. 2)

10 Preliminary.E+W

(1)This Part of this Act has effect except where a Minister is the acquiring authority.

(2)The compulsory purchase order shall be in the prescribed form and shall describe by reference to a map the land to which it applies.

(3)Before submitting the order to the confirming authority the acquiring authority shall comply with sections 11 and 12 below.

Notices prior to submission of order to confirming authorityE+W

11 [F33Notices in newspapers.] [F33Public notices]E+W

(1)The acquiring authority shall—

[F34(a)]in two successive weeks publish a notice in the prescribed form in one or more local newspapers circulating in the locality in which the land comprised in the order is situated [F35, and

(b)for a period of at least 21 days ending with the day specified under subsection (2)(d), publish a notice in the prescribed form on an appropriate website.]

(2)The [F36notice] [F36notices] shall—

(a)state that the order has been made and is about to be submitted for confirmation,

(b)describe the land and state the purpose for which the land is required,

(c)name a place within the locality where a copy of the order and of the map referred to therein may be inspected, [F37and]

[F38(ca)specify a website on which those copies may be viewed, and]

[F39(d)specify the time (not being less than twenty-one days from the first publication of the notice) within which, and the manner in which, objections to the order can be made.]

[F39(d)specify the final day for making objections to the order, and the manner in which objections can be made.]

[F40(2A)If the confirming authority is satisfied that, because of special circumstances, it is impracticable for the acquiring authority to make the copies referred to in subsection (2)(c) available for inspection at an appropriate place, the confirming authority may direct that the requirement in subsection (2)(c) (together with that in section 12(1)(ba)) is not to apply.]

[F41(3)In addition, the acquiring authority shall affix a notice in the prescribed form to a conspicuous object or objects on or near the land comprised in the order.

(4)The notice under subsection (3) must—

(a)be addressed to persons occupying or having an interest in the land, and

(b)set out each of the matters mentioned in subsection (2) [F42(but reading the reference there to first publication of the notice as a reference to the day when the notice under subsection (3) is first affixed)].]

Textual Amendments

F33S. 11 heading substituted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(3)(a), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F34Words in s. 11(1) renumbered as s. 11(1)(a) (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling Up and Regeneration Act 2023 (c. 55), ss. 181(3)(b)(i), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F35S. 11(1)(b) and word inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(3)(b)(ii), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F36Word in s. 11(2) substituted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(3)(c)(i), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F37Word in s. 11(2)(c) omitted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by virtue of Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(3)(c)(ii), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F38S. 11(2)(ca) inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(3)(c)(iii), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F39S. 11(2)(d) substituted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(3)(c)(iv), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F40S. 11(2A) inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(3)(d), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F41S. 11(3)(4) added (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 100(4) (with s. 100(8)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

F42Words in s. 11(4)(b) omitted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by virtue of Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(3)(e), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

12 Notices to owners, lessees [F43, occupiers and others]. E+W

(1)The acquiring authority shall serve on every [F44qualifying person] a notice in the prescribed form—

(a)stating the effect of the order,

(b)stating that it is about to be submitted for confirmation, [F45and]

[F46(ba)(subject to section 11(2A)) naming a place within the locality where a copy of the order and of the map referred to in it may be inspected,

(bb)specifying a website on which those copies may be viewed, and]

[F47(c)specifying the time (not being less than twenty-one days from service of the notice) within which, and the manner in which, objections to the order can be made.]

[F47(c)specifying the final day for making objections to the order, and the manner in which objections can be made.]

(2)[F48A person is a qualifying person, in relation to land comprised in an order, if—

(a)he is an owner, lessee, tenant (whatever the tenancy period) or occupier of the land, F49...

(b)he falls within subsection (2A) [F50, or

(c)the person is entitled to the benefit of an obligation under a conservation covenant (within the meaning of Part 7 of the Environment Act 2021) relating to the land.]

(2A)A person falls within this subsection if he is—

(a)a person to whom the acquiring authority would, if proceeding under section 5(1) of the Compulsory Purchase Act 1965, be required to give a notice to treat, or

(b)a person the acquiring authority thinks is likely to be entitled to make a relevant claim if the order is confirmed and the compulsory purchase takes place, so far as he is known to the acquiring authority after making diligent inquiry.

(2B)A relevant claim is a claim for compensation under section 10 of the Compulsory Purchase Act 1965 (compensation for injurious affection).]

(3)Where under this section any notice is required to be served on an owner of land, and the land is ecclesiastical property, a like notice shall be served on the [F51Church Commissioners] [F51Diocesan Board of Finance for the diocese in which the land is situated] .

In this subsection “ecclesiastical property” means land belonging to any ecclesiastical benefice [F52of the Church of England] , or being or forming part of a church subject to the jurisdiction of the bishop of any diocese [F52of the Church of England] or the site of such a church, or being or forming part of a burial ground subject to such jurisdiction [F53[F54or being diocesan glebe land within the meaning of the Endowments and Glebe Measure 1976]].

Textual Amendments

F43Words in s. 12 heading substituted (30.9.2022) by virtue of Environment Act 2021 (c. 30), s. 147(3), Sch. 20 para. 2(2) (with s. 144); S.I. 2022/48, reg. 5(d)

F44Words in s. 12(1) substituted (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 100(5)(a) (with s. 100(8)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

F45Word in s. 12(1)(b) omitted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by virtue of Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(4)(a), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F46S. 12(1)(ba)(bb) inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(4)(b), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F47S. 12(1)(c) substituted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(4)(c), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F48S. 12(2)-(2B) substituted for s. 12(2) (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 100(5)(b) (with s. 100(8)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

F51Words in s. 12(3) substituted (E.) (1.10.2006) by Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), s. 16(2), Sch. 5 para. 24(1)(a); 2006 No. 2, Instrument made by Archbishops

F52Words in s. 12(3) inserted (E.) (1.10.2006) by Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), s. 16(2), Sch. 5 para. 24(1)(b); 2006 No. 2, Instrument made by Archbishops

F54Words in s. 12(3) omitted (E.) (1.10.2006) by virtue of Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), s. 16(2), Sch. 5 para. 24(1)(c); 2006 No. 2, Instrument made by Archbishops

Modifications etc. (not altering text)

C58S. 12(2) and (3) applied (31.10.1994) by 1958 c. 69, s. 16(7A) as inserted (31.10.1994) by 1994 c. 21, s. 52, Sch. 8 para. 14(9) (with s. 40(7)); S.I. 1994/2553, art. 2

[F5512AFinal day for making objectionsE+W

(1)For the purposes of sections 11 and 12, the day specified as the final day for making objections must be the last day, or a day after the last day, of the period of 21 days beginning with the first day at the beginning of which the acquiring authority expects that all of the following conditions will be satisfied.

(2)The conditions are that—

(a)a notice has been published for the first time as required by section 11(1)(a),

(b)publication as required by section 11(1)(b) has begun,

(c)a notice has been affixed as required by section 11(3), and

(d)a notice has been served on every qualifying person as required by section 12(1).]

Textual Amendments

F55S. 12A inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(5), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

Confirmation of orderE+W

[F5613 Confirmation of order: no objectionsE+W

(1)The confirming authority may confirm a compulsory purchase order with or without modifications if it is satisfied—

(a)that the notice requirements have been complied with, and

(b)that one of the conditions in subsection (2) is satisfied.

(2)The conditions are—

(a)no relevant objection is made;

(b)every relevant objection made is either withdrawn or disregarded.

(3)The confirming authority may require every person who makes a relevant objection to state the grounds of the objection in writing.

(4)If the confirming authority is satisfied that an objection relates exclusively to matters which can be dealt with by the tribunal by whom the compensation is to be assessed it may disregard the objection.

(5)The notice requirements are the requirements under sections 11 and 12 to publish, affix and serve notices in connection with the compulsory purchase order.

(6)A relevant objection is an objection by a person who is a qualifying person for the purposes of section 12(2), but if such a person qualifies only by virtue of section 12(2A)(b) and the confirming authority thinks that he is not likely to be entitled to make a relevant claim his objection is not a relevant objection.

(7)Disregarded means disregarded under subsection (4) or under any other power to disregard a relevant objection contained in the enactment providing for the compulsory purchase.

Textual Amendments

F56Ss. 13-13C substituted for s. 13 (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 100(6) (with s. 100(8)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

13AConfirmation of order: remaining objectionsE+W

(1)This section applies to the confirmation of a compulsory purchase order if a relevant objection is made which is neither—

(a)withdrawn, nor

(b)disregarded,

(a remaining objection).

[F57(2)The confirming authority may proceed under the written representations procedure—

(a)if the order is not subject to special parliamentary procedure,

(b)in the case of an order to which section 16 applies, if a certificate has been given under subsection (2) of that section, and

(c)if every person who has made a remaining objection consents in the prescribed manner.

(3)If subsection (2) does not apply or if the confirming authority decides not to proceed under that subsection, it must either—

(a)cause a public local inquiry to be held, or

(b)give every person who has made a remaining objection an opportunity of appearing before and being heard by a person appointed by the confirming authority for the purpose.

(4)If a person who has made a remaining objection takes the opportunity to appear before a person appointed under subsection (3)(b) the confirming authority must give the acquiring authority and any other person it thinks appropriate the opportunity to be heard at the same time.

(5)The confirming authority may confirm the order with or without modifications if it has considered the objection and either —

(a)it has followed the written representations procedure, or

(b)in a case which falls within subsection (3), if an inquiry was held or a person was appointed under subsection (3)(b), it has considered the report of the person who held the inquiry or who was so appointed.

(6)The written representations procedure is such procedure as is prescribed for the purposes of this section including provision affording an opportunity to—

(a)every person who has made a remaining objection,

(b)the acquiring authority, and

(c)any other person the confirming authority thinks appropriate,

to make written representations as to whether the order should be confirmed.]

[F57(1A)The confirming authority must cause a public local inquiry to be held if—

(a)the order is subject to special parliamentary procedure, or

(b)in the case of an order to which section 16 applies, a certificate has been given under subsection (2) of that section.

(1B)If subsection (1A) does not apply, the confirming authority must either—

(a)cause a public local inquiry to be held, or

(b)follow the representations procedure.

(1C)In deciding between those options, the confirming authority must have regard to the scale and complexity of what is proposed by the order.

(1D)The representations procedure is a procedure to be prescribed.

(1E)The regulations prescribing the procedure must include—

(a)provision enabling each person who has made a remaining objection to make representations—

(i)in writing to the confirming authority, or

(ii)if the person so requests, at a hearing, and

(b)provision enabling the acquiring authority, and any other person the confirming authority thinks appropriate, to make representations—

(i)in writing to the confirming authority, or

(ii)if applicable, at a hearing held as mentioned in paragraph (a)(ii).

(1F)The regulations may provide for hearings to be held by the confirming authority or by a person appointed by the confirming authority.

(1G)In subsection (1E), “representations” means representations as to whether the order should be confirmed.

(1H)Before confirming the order, the confirming authority must consider—

(a)each remaining objection;

(b)if a public local inquiry was held, the report of the person who held it;

(c)if the representations procedure was followed and the confirming authority held a hearing, the representations made at the hearing;

(d)if the representations procedure was followed and a person appointed by the confirming authority held a hearing, the report of that person;

(e)if the representations procedure was followed and written representations were made, those representations.

(1I)The confirming authority may confirm the order with or without modifications.]

(7)Relevant objection and disregarded must be construed in accordance with section 13.

Textual Amendments

F56Ss. 13-13C substituted for s. 13 (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 100(6) (with s. 100(8)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

F57S. 13A(1A)-(1I) substituted for s. 13A(2)-(6) (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 182(2), 255(7) (with s. 247); S.I. 2024/389, reg. 2(i)

13B[F58Written] representations procedure: supplementaryE+W

(1)This section applies where the confirming authority decides under section 13A to follow the [F59written] representations procedure.

(2)The confirming authority may make orders as to the costs of the parties to the [F60written] representations procedure, and as to which party must pay the costs.

(3)An order under subsection (2) may be made a rule of the High Court on the application of any party named in the order.

(4)The costs incurred by the confirming authority in connection with the [F61written] representations procedure must be paid by the acquiring authority, if the confirming authority so directs.

(5)The confirming authority may certify the amount of its costs, and any amount so certified and directed to be paid by the acquiring authority is recoverable summarily by the confirming authority as a civil debt.

(6)Section 42(2) of the Housing and Planning Act 1986 (recovery of Minister’s costs in connection with inquiries) applies to the [F62written] representations procedure as if the procedure is an inquiry specified in section 42(1) of that Act.

(7)Regulations under section [F6313A(6)] [F6313A(1D)] may make provision as to the giving of reasons for decisions taken in cases where the [F64written] representations procedure is followed.

Textual Amendments

F56Ss. 13-13C substituted for s. 13 (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 100(6) (with s. 100(8)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

F58Word in s. 13B heading omitted (31.3.2024 for specified purposes) by virtue of Levelling-up and Regeneration Act 2023 (c. 55), ss. 182(3)(a), 255(7) (with s. 247); S.I. 2024/389, reg. 2(i)

F59Word in s. 13B(1) omitted (31.3.2024 for specified purposes) by virtue of Levelling-up and Regeneration Act 2023 (c. 55), ss. 182(3)(b)(i), 255(7) (with s. 247); S.I. 2024/389, reg. 2(i)

F60Word in s. 13B(2) omitted (31.3.2024 for specified purposes) by virtue of Levelling-up and Regeneration Act 2023 (c. 55), ss. 182(3)(b)(ii), 255(7) (with s. 247); S.I. 2024/389, reg. 2(i)

F61Word in s. 13B(4) omitted (31.3.2024 for specified purposes) by virtue of Levelling-up and Regeneration Act 2023 (c. 55), ss. 182(3)(b)(iii), 255(7) (with s. 247); S.I. 2024/389, reg. 2(i)

F62Word in s. 13B(6) omitted (31.3.2024 for specified purposes) by virtue of Levelling-up and Regeneration Act 2023 (c. 55), ss. 182(3)(b)(iv), 255(7) (with s. 247); S.I. 2024/389, reg. 2(i)

F63Word in s. 13B(7) substituted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 182(3)(c), 255(7) (with s. 247); S.I. 2024/389, reg. 2(i)

F64Word in s. 13B(7) omitted (31.3.2024 for specified purposes) by virtue of Levelling-up and Regeneration Act 2023 (c. 55), ss. 182(3)(b)(v), 255(7) (with s. 247); S.I. 2024/389, reg. 2(i)

[F6513BAConditional confirmationE+W

(1)The confirming authority may confirm a compulsory purchase order conditionally.

(2)The effect of conditional confirmation is that the order—

(a)does not become operative until the confirming authority has decided, on an application by the acquiring authority, that certain conditions have been met, and

(b)expires if the confirming authority—

(i)has not received an application for the purposes of subsection (2)(a) by a certain time, or

(ii)having received such an application by that time, decides that the conditions have not been met.

(3)The conditions and the time are to be specified by the confirming authority when it confirms the order.

(4)The procedure to be followed in relation to an application under this section is to be prescribed.

(5)The regulations prescribing the procedure must include provision for each relevant objector—

(a)to be given notice of the application (or for steps to be taken with a view to notifying them), and

(b)to have the opportunity to make written representations in response to the application.

(6)In subsection (5), “relevant objector” means a person who made an objection to the order that—

(a)was a remaining objection for the purposes of section 13A, and

(b)had not been withdrawn by the time the order was confirmed.

(7)The regulations may include provision as to the giving of reasons for the decision on the application.

(8)Subsections (2) to (6) of section 13B apply to proceedings on an application under this section as they apply to the representations procedure.]

Textual Amendments

F56Ss. 13-13C substituted for s. 13 (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 100(6) (with s. 100(8)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

13CConfirmation in stagesE+W

(1)The confirming authority may confirm an order (with or without modifications) so far as it relates to part of the land comprised in the order (the “relevant part”) if each of the conditions in subsection (2) is met.

(2)The conditions are—

(a)the confirming authority is satisfied that the order ought to be confirmed so far as it relates to the relevant part but has not for the time being determined whether the order ought to be confirmed so far as it relates to the remaining part;

(b)the confirming authority is satisfied that the notice requirements have been complied with.

(3)If there is a remaining objection in respect of the order, the confirming authority may only act under subsection (1) after complying with section [F6613A(2) or (3)] [F6613A(1A) or (1B)] (as the case may be).

(4)But it may act under subsection (1) without complying with those provisions if it is satisfied that all remaining objections relate solely to the remaining part of the land.

(5)If the confirming authority acts under subsection (1)—

(a)it must give a direction postponing consideration of the order, so far as it relates to the remaining part, until such time as may be specified by or under the direction;

(b)the order so far as it relates to each part of the land must be treated as a separate order.

(6)The notices to be published, affixed and served under section 15 must include a statement as to the effect of the direction given under subsection (5)(a).

(7)Notice requirements must be construed in accordance with section 13.

(8)Remaining objection must be construed in accordance with section 13A.]

Textual Amendments

F56Ss. 13-13C substituted for s. 13 (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 100(6) (with s. 100(8)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

F66Words in s. 13C(3) substituted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 182(4), 255(7) (with s. 247); S.I. 2024/389, reg. 2(i)

[F6713DPower to extend time limit for implementationE+W

(1)The confirming authority may, when it confirms a compulsory purchase order, include provision in the order specifying a period longer than three years for the purposes of section 4 of the Compulsory Purchase Act 1965 (time limit for notice to treat) and section 5A of the Compulsory Purchase (Vesting Declarations) Act 1981 (time limit for general vesting declaration).

(2)No such provision is to be included by the acquiring authority in the order submitted for confirmation.]

14 Land not originally included in order.E+W

The order as confirmed by the confirming authority shall not, unless all persons interested consent, authorise the acquiring authority to purchase compulsorily any land which the order would not have authorised that authority to purchase compulsorily if it had been confirmed without modification.

[F6814AConfirmation by acquiring authorityE+W

(1)The power to confirm an order may be exercised by the acquiring authority (instead of the confirming authority) if—

(a)the confirming authority has notified the acquiring authority to that effect, and

(b)the notice has not been revoked.

(2)But this section does not apply to an order in respect of land—

(a)falling within section 16(1) or paragraph 3(1) of Schedule 3, or

(b)forming part of a common, open space or fuel or field garden allotment for the purposes of section 19.

[F69(2A)Nor does it apply to an order directing that compensation is to be assessed in accordance with section 14A of the Land Compensation Act 1961 (see section 15A).]

(3)The confirming authority may give notice under subsection (1) if it is satisfied—

(a)that the notice requirements have been complied with,

(b)that no objection has been made in relation to the proposed confirmation or that all objections have been withdrawn, and

(c)that the order is capable of being confirmed without modification.

(4)An objection is an objection made by any person (whether or not a person mentioned in section 12(2)), including an objection which is disregarded.

(5)The power to confirm an order under subsection (1) does not include any power—

(a)to confirm the order with modifications, or

(b)to confirm only a part of the order.

(6)The acquiring authority must notify the confirming authority as soon as reasonably practicable after it has determined whether or not to confirm the order.

(7)The confirming authority may revoke a notice given by it under subsection (1).

(8)But a notice may not be revoked if the determination has already been made and notified by the acquiring authority under subsection (6).

(9)An order confirmed by the acquiring authority under subsection (1) is to have the same effect as if it were confirmed by the confirming authority.

(10)Notices under this section must be in writing.

(11)Notice requirements and disregarded must be construed in accordance with section 13.]

Textual Amendments

F69S. 14A(2A) inserted (31.3.2024 for W. for specified purposes, 30.4.2024 for E.) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 190(1)(b), 255(7) (with s. 247); S.I. 2024/92, reg. 4 (with reg. 6(6)); S.I. 2024/389, reg. 2(l)

[F7014BTimetables for confirmation of CPOs except by Welsh MinistersE+W

(1)The Secretary of State must publish one or more timetables in relation to steps to be taken by confirming authorities, other than the Welsh Ministers, in confirming a compulsory purchase order.

(2)Different timetables may be published in relation to—

(a)different confirming authorities, or

(b)different types of compulsory purchase order.

(3)The Secretary of State may at any time revise a timetable published under this section.

(4)The validity of an order is not affected by any failure to comply with a timetable published under this section.

(5)The Secretary of State must lay before Parliament an annual report showing the extent to which confirming authorities have complied with any applicable timetable published under this section.

(6)A report laid by the Secretary of State under this section need not include information about a confirming authority if the number of compulsory purchase orders submitted to it is lower than a minimum specified by the Secretary of State in the report.

Textual Amendments

14CTimetables for confirmation of CPOs by Welsh MinistersE+W

(1)The Welsh Ministers may publish one or more timetables in relation to steps to be taken by them in confirming a compulsory purchase order.

(2)Different timetables may be published in relation to different types of compulsory purchase order.

(3)The Welsh Ministers may at any time revise a timetable published under this section.

(4)The validity of an order is not affected by any failure to comply with a timetable published under this section.

(5)The Welsh Ministers must lay before the National Assembly for Wales an annual report showing the extent to which they have complied with any applicable timetable published under this section.]

Textual Amendments

[F7114DPower to appoint inspectorE+W

(1)A confirming authority may appoint a person (“an inspector”) to act instead of it in relation to the confirmation of a compulsory purchase order to which section 13A applies.

(2)An inspector may be appointed to act in relation to—

(a)a specific compulsory purchase order, or

(b)a description of compulsory purchase orders.

(3)An inspector—

(a)has the same functions as a confirming authority under this Part (excluding this section),

(b)retains those functions even if all remaining objections are withdrawn after the inspector has begun to act in relation to a compulsory purchase order, and

(c)may hold a public local inquiry under section [F7213A(3)(a) or act as the person appointed to hear remaining objections under section 13A(3)(b)] [F7213A].

(4)Where an inspector is to act in relation to a compulsory purchase order, the confirming authority must inform—

(a)every person who has made a remaining objection, and

(b)the acquiring authority.

(5)Where an inspector decides whether or not to confirm the whole or part of a compulsory purchase order, the inspector's decision is to be treated as that of the confirming authority.

(6)The confirming authority may at any time—

(a)revoke its appointment of an inspector, and

(b)appoint another inspector.

(7)If the confirming authority revokes its appointment of an inspector while the inspector is acting in relation to a compulsory purchase order and does not replace the inspector, the authority must give its reasons—

(a)to the inspector whose appointment has been revoked, and

(b)to all those informed under subsection (4).

(8)Where in any enactment there is a provision that applies in relation to a confirming authority acting under this Part, that provision is to be read as applying equally in relation to an inspector so far as the context permits.

(9)In this section “remaining objection” is to be construed in accordance with section 13A.]

Textual Amendments

F71S. 14D inserted (6.4.2018 for specified purposes, 6.4.2019 in so far as not already in force) by Housing and Planning Act 2016 (c. 22), ss. 181(2), 216(3); S.I. 2018/251, reg. 4(b) (with reg. 5); S.I. 2019/427, reg. 3 (with reg. 4)

F72Word in s. 14D(3)(c) substituted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 182(5), 255(7) (with s. 247); S.I. 2024/389, reg. 2(i)

[F7315 Notices after confirmation of orderE+W

(1)After the order has been confirmed, the acquiring authority must—

(a)serve a confirmation notice and a copy of the order as confirmed on each person on whom a notice was required to be served under section 12, and

(b)affix a confirmation notice to a conspicuous object or objects on or near the land comprised in the order.

(2)The notice under subsection (1)(b) must—

(a)be addressed to persons occupying or having an interest in the land;

(b)so far as practicable, be kept in place by the acquiring authority until the expiry of a period of six weeks beginning with the [F74date when the order becomes operative] [F74day on which the authority takes the final step needed to comply with subsection (1)(a)].

(3)[F75Unless the order was confirmed conditionally,] The acquiring authority must also publish a confirmation notice—

[F76(a)]in one or more local newspapers circulating in the locality in which the land comprised in the order is situated [F77, and

(b)on an appropriate website, until the end of the period of 6 weeks beginning with the day on which the authority takes the final step needed to comply with subsection (1)(a).]

[F78(3A)The acquiring authority must comply with subsections (1) and [F79(3)] [F79(3)(a)] before the end of—

(a)the period of 6 weeks beginning with the day on which the order is confirmed, or

(b)such longer period beginning with that day as may be agreed in writing between the acquiring authority and the confirming authority.

(3B)If the acquiring authority fails to comply with subsections (1) and [F80(3)] [F80(3)(a)] in accordance with subsection (3A), [F81or with subsection (3)(b),] the confirming authority may—

(a)take any steps that the acquiring authority was required but has failed to take to comply with those subsections, and

(b)recover the reasonable costs of doing so from the acquiring authority.]

(4)A confirmation notice is a notice—

(a)describing the land;

(b)stating that the order has been confirmed;

[F82(ba)if the order was confirmed conditionally, stating the conditions and time specified under section 13BA(3);]

(c)(except in the case of a notice under subsection (1)(a)) naming a place where a copy of the order as confirmed and of the map referred to there may be inspected at all reasonable hours;

[F83(ca)specifying a website on which those copies may be viewed;]

(d)that a person aggrieved by the order may apply to the High Court as mentioned in section 23.

[F84(e)containing a prescribed statement about the effect of Parts 2 and 3 of the Compulsory Purchase (Vesting Declarations) Act 1981;

(f)inviting any person who would be entitled to claim compensation if a declaration were executed under section 4 of that Act to give the acquiring authority information about the person's name, address and interest in land, using a prescribed form.]

[F85(4A)If the confirming authority is satisfied that, because of special circumstances, it is impracticable for the acquiring authority to make the copies referred to in subsection (4)(c) available for inspection at an appropriate place, the confirming authority may direct that the requirement in subsection (4)(c) is not to apply.]

[F86(4B)If the order was confirmed conditionally and the confirming authority decides under section 13BA that the conditions have been met, the acquiring authority must serve—

(a)a copy of the order, and

(b)a fulfilment notice,

on each person on whom a notice was required to be served under section 12.

(4C)Where subsection (4B) applies, the acquiring authority must also—

(a)affix a fulfilment notice to a conspicuous object or objects on or near the land comprised in the order, and

(b)publish a fulfilment notice—

(i)in one or more local newspapers circulating in the locality in which the land comprised in the order is situated, and

(ii)on an appropriate website, until the end of the period of 6 weeks beginning with the day on which the acquiring authority takes the final step needed to comply with subsection (4B).

(4D)The acquiring authority must comply with subsections (4B) and (4C)(a) and (b)(i) before the end of—

(a)the period of 6 weeks beginning with the day on which the decision under section 13BA is made, or

(b)such longer period beginning with that day as may be agreed in writing between the acquiring authority and the confirming authority.

(4E)If the acquiring authority fails to comply with those provisions before the end of that period, or fails to comply with subsection (4C)(b)(ii), the confirming authority may—

(a)take any steps that the acquiring authority was required but has failed to take to comply, and

(b)recover the reasonable costs of doing so from the acquiring authority

(4F)A fulfilment notice is a notice—

(a)stating that the conditions subject to which the order was confirmed have been met and that the order will therefore become operative, and

(b)annexing the information that was contained in the confirmation notice.]

(5)A confirmation notice [F87or fulfilment notice] must be in the prescribed form.

[F88(6)The acquiring authority must send the confirmation notice [F89, and any fulfilment notice,] to the Chief Land Registrar and [F90it] [F90each such notice] shall be a local land charge.]]

Textual Amendments

F73S. 15 substituted (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 100(7) (with s. 100(8)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

F74Words in s. 15(2)(b) substituted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 183(3)(a), 255(7) (with s. 247); S.I. 2024/389, reg. 2(j)

F75Words in s. 15(3) inserted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 183(3)(b), 255(7) (with s. 247); S.I. 2024/389, reg. 2(j)

F76Words in s. 15(3) renumbered as s. 15(3)(a) (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling Up and Regeneration Act 2023 (c. 55), ss. 181(6)(a)(i), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F77S. 15(3)(b) and word inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(6)(a)(ii), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F79Word in s. 15(3A) substituted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(6)(b), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F80Word in s. 15(3B) substituted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(6)(c)(i), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F81Words in s. 15(3B) inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(6)(c)(ii), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F82S. 15(4)(ba) inserted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 183(3)(c), 255(7) (with s. 247); S.I. 2024/389, reg. 2(j)

F83S. 15(4)(ca) inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(6)(d), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F84S. 15(4)(e)(f) inserted (1.10.2016 for specified purposes, 3.2.2017 for specified purposes, 6.4.2017 in so far as not already in force) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 15 para. 2(2); S.I. 2016/956, reg. 2(b)(i); S.I. 2017/75, reg. 3(i); S.I. 2017/281, reg. 4(j)

F85S. 15(4A) inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(6)(e), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F86S. 15(4B)-(4F) inserted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 183(3)(d), 255(7) (with s. 247); S.I. 2024/389, reg. 2(j)

F87Words in s. 15(5) inserted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 183(3)(e), 255(7) (with s. 247); S.I. 2024/389, reg. 2(j)

F88S. 15(6) inserted (3.2.2017 for specified purposes, 6.4.2017 in so far as not already in force) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 15 para. 2(3); S.I. 2017/75, reg. 3(i) (with reg. 5); S.I. 2017/281, reg. 4(j)

F89Words in s. 15(6) inserted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 183(3)(f)(i), 255(7) (with s. 247); S.I. 2024/389, reg. 2(j)

F90Words in s. 15(6) substituted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 183(3)(f)(ii), 255(7) (with s. 247); S.I. 2024/389, reg. 2(j)

Modifications etc. (not altering text)

C59S. 15 modified (10.11.1993) by 1993 c. 28, s. 169, Sch. 20 para. 2(2); S.I. 1993/2762, art. 3.

[F91Special provision about compensationE+W

Textual Amendments

F91S. 15A and cross-heading inserted (31.3.2024 for W. for specified purposes, 30.4.2024 for E.) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 190(1)(c), 255(7) (with s. 247); S.I. 2024/92, reg. 4 (with reg. 6(6)); S.I. 2024/389, reg. 2(l)

15ADirections applying section 14A of the Land Compensation Act 1961E+W

(1)Subsection (2) applies if—

(a)an acquiring authority submits a compulsory purchase order for confirmation, and

(b)the authorising enactment is listed in Schedule 2A.

(2)The acquiring authority may include in the order a direction that compensation is to be assessed in accordance with section 14A of the Land Compensation Act 1961 (cases where prospect of planning permission to be ignored); and if it does so the following provisions of this section apply.

(3)The acquiring authority must submit to the confirming authority a statement of commitments together with the order.

(4)A “statement of commitments” is a statement of the acquiring authority’s intentions as to what will be done with the project land should the acquisition proceed, so far as the authority relies on those intentions in contending that the direction is justified in the public interest.

(5)If the authorising enactment is listed in any of paragraphs 2 to 7 of Schedule 2A, those intentions must include the provision of a certain number of units of affordable housing.

(6)The statement under section 12(1)(a) must include a statement of the effect of the direction; and paragraphs (ba) and (bb) of the same subsection apply in respect of the statement of commitments as they apply in respect of the compulsory purchase order.

(7)The confirming authority may permit the acquiring authority to amend the statement of commitments before the decision whether to confirm the order is made.

(8)But the confirming authority may do so—

(a)only if satisfied that the amendment would not be unfair to any person who made or could have made a relevant objection for the purposes of section 13, and

(b)if the authorising enactment is listed in any of paragraphs 2 to 7 of Schedule 2A, only if the statement of commitments as amended will still comply with subsection (5).

(9)If the confirming authority decides to confirm the order in accordance with the applicable provisions of this Part—

(a)it may confirm the order with the direction included if satisfied that the direction is justified in the public interest;

(b)otherwise, it must modify the order so as to remove the direction.

(10)If the order is confirmed with the direction included, a confirmation notice under section 15 must (in addition to the matters set out in subsection (4) of that section)—

(a)state the effect of the direction,

(b)explain how the statement of commitments may be viewed, and

(c)explain that additional compensation may become payable if the statement of commitments is not fulfilled.

(11)In this section—

  • the authorising enactment” means the enactment that confers the power to make the compulsory purchase to which the order in question relates;

  • the project land” means—

    (a)

    the land proposed to be acquired further to the compulsory purchase order, and

    (b)

    any other land that the acquiring authority intends to be used in connection with that land;

  • unit of affordable housing” means a building or part of a building that is constructed or adapted for use as a separate dwelling and—

    (a)

    in the case of a building in England, is to be used as—

    (i)

    social housing within the meaning of Part 2 of the Housing and Regeneration Act 2008, or

    (ii)

    housing of any other description that is prescribed, or

    (b)

    in the case of a building in Wales, is to be used as housing of a description that is prescribed.]

Part IIIE+W Special Kinds of Land

Modifications etc. (not altering text)

C60Pt. 3 incorporated (with modifications) (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 24 (with arts. 51, 57)

C62Part III applied (with modifications) (1.12.1991) by Water Industry Act 1991 (c. 56, SIF 130), ss. 167, 223(2), Sch. 11 para. 6(1)(b)(with ss. 82(3), 186(1), 222(1), Sch. 14 para. 6)

Part III applied (with modifications) (1.12.1991) by Water Resources Act 1991 (c. 57, SIF 130), ss. 168, 225(2), Sch. 19 para. 6(1)(b)(with ss. 16(6), 179, 222(3), Sch. 22 para. 1, Sch. 23 para. 6)

Parts II-IV applied (31.10.1994) by Opencast Coal Act 1958 c. 69, s. 16(4A) as substituted (31.10.1994) by 1994 c. 21, s. 52, Sch. 8 para. 14(5); S.I. 1994/2553, art. 2

16 Statutory undertakers’ land excluded from compulsory purchase.E+W

(1)This section applies where the land comprised in a compulsory purchase order includes land which has been acquired by statutory undertakers for the purposes of their undertaking and on a representation made to the appropriate Minister before the expiration of the time within which objections to the order can be made he is satisfied that—

(a)any of the said land is used for the purposes of the carrying on of their undertaking, or

(b)an interest in any of the said land is held for those purposes.

[F92and the representation is not withdrawn.].

(2)The compulsory purchase order shall not be confirmed or made so as to authorise the compulsory purchase of any land as to which the appropriate Minister is satisfied as aforesaid except land as to which he is satisfied that its nature and situation are such—

(a)that it can be purchased and not replaced without serious detriment to the carrying on of the undertaking, or

(b)that if purchased it can be replaced by other land belonging to, or available for acquisition by, the undertakers without serious detriment to the carrying on thereof,

and certifies accordingly.

[F93(3)In the preceding provisions of this section “statutory undertakers” include—

(a)a health service body, as defined in section 60(7) of the National Health Service and Community Care Act 1990; F94. . .

[F95(aa)[F96NHS England];

[F97(ab)an integrated care board established under section 14Z25 of the National Health Service Act 2006;]

(b)a National Health Service trust established under [F98section 25 of the National Health Service Act 2006 or section 18 of the National Health Service (Wales) Act 2006] or the National Health Service (Scotland) Act 1978;

F99. . .

[F100(ba) an NHS foundation trust;]

F101(c). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

[F102(d)a Local Health Board established under [F103section 11 of the National Health Service (Wales) Act 2006] ;]

but in relation to a health service body, as so defined, any reference in those provisions to land acquired or available for acquisition by the statutory undertakers shall be construed as a reference to land acquired or available for acquisition by the Secretary of State for use or occupation by that body]]

Textual Amendments

F94S. 16(3): the word preceding para. (a) repealed (8.2.2000) by S.I. 2000/90, art. 3(1), Sch. 1

F99S. 16(3): word at the end of para. (b) repealed (10.10.2002 for W., 1.3.2007 in so far as not already in force) by National Health Service Reform and Health Care Professions Act 2002 (c. 17), ss. 6(2), 42(3), Sch. 5 para. 25, Sch. 9 Pt. 1; S.I. 2002/2532, art. 2, Sch.; S.I. 2006/1407, art. 1(1), Sch. 1 Pt. 2 para. 12

F102S. 16(3)(d) and preceding word inserted (10.10.2002 for W., 1.3.2007 in so far as not already in force) by National Health Service Reform and Health Care Professions Act 2002 (c. 17), ss. 6(2), 42(3), Sch. 5 para. 25; S.I. 2002/2532, art. 2, Sch.; S.I. 2006/1407, art. 1(1), Sch. 1 Pt. 2 para. 12

Modifications etc. (not altering text)

Orders subject to special parliamentary procedureE+W

17 Local authority and statutory undertakers’ land.E+W

(1)This section applies to land which—

(a)is the property of a local authority, or

(b)has been acquired by statutory undertakers, who are not a local authority, for the purposes of their undertaking.

(2)Subject to subsection (3) below, a compulsory purchase order shall, in so far as it authorises the compulsory purchase of land to which this section applies, be subject to special parliamentary procedure in any case where an objection to [F104the compulsory purchase of the land] has been made by the local authority, or as the case may be the statutory undertakers, and has not been withdrawn.

[F105(2A)Subsection (3) of section 16 above applies in relation to subsections (1) and (2) above as it applies in relation to the preceding provisions of that section.]

(3)Subsection (2) above shall not apply to the compulsory acquisition of an interest in land where the person acquiring the interest is a local authority (as defined in subsection (4) below) [F106a National Park authority], [F107an urban development corporation] [F108, a Mayoral development corporation] [F109, F110...,]. . . F111. . ., [F112a Welsh planning board,] any statutory undertakers or a Minister.

(4)In subsection (3) above—

  • local authority” means—

    (a)

    in relation to England, the council of a county or district [F113the Broads Authority], the council of a London borough, the Common Council of the City of London, [F114a fire and rescue authority created by an order under section 4A of the Fire and Rescue Services Act 2004,] [F115the London Fire Commissioner,] F116.... . . [F117 . . . F118, a joint authority established by Part 4 of the Local Government Act 1985 [F119, a combined authority established under section 103 of that Act or a combined county authority established under section 9(1) of the Levelling-up and Regeneration Act 2023],

    (b)

    in relation to Wales, the council of a county or [F120county borough], [F121or a police authority established under [F122section 3 of the Police Act 1996]]. . .

    and this definition applies to the Isles of Scilly as if the Council of those Isles were the council of a county;

  • statutory undertakers” includes—

    (a)

    F123. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    (aa)

    [F124a National Health Service trust established under [F125section 25 of the National Health Service Act 2006 or section 18 of the National Health Service (Wales) Act 2006], and]

    (aab)

    [F126an NHS foundation trust,]

    (ab)

    [F127. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    (ac)

    the Schools Funding Council for Wales,]

    (ad)

    F128...

    (ae)

    [F129NHS England],

    (af)

    [F130an integrated care board established under section 14Z25 of the National Health Service Act 2006,]

    (b)

    any other authority, body or undertakers specified in an order made by the Secretary of State under this paragraph.

  • [F131a Welsh planning board” means a board constituted under—

    (a)

    section 2(1B) of the M9Town and Country Planning Act 1990; F132

    (b)

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .]

(5)An order under paragraph (b) of the definition of “statutory undertakers” in subsection (4) above shall be made by statutory instrument and shall be subject to annulment in pursuance of a resolution of either House of Parliament.]

Textual Amendments

F106Words in s. 17(3) inserted (23.11.1995) by 1995 c. 25, s. 78, Sch. 10 para. 21(1)(with Sch. 8 para. 7); S.I. 1995/2950, art. 2

F108Words in s. 17(3) inserted (15.1.2012) by Localism Act 2011 (c. 20), s. 240(1)(l), Sch. 22 para. 7(2)

F109Words in s. 17(3) inserted (1.10.1998) by 1998 c. 38, s. 128, Sch. 14 Pt. II para. 17 (with ss. 139(2), 143(2)); S.I. 1998/2244, art. 4

F111Words in s. 17(3) repealed (1.4.1997) by 1995 c. 25, s. 120(3), Sch. 24 (with ss. 7(6), 115, 117); S.I. 1996/2560, art. 2, Sch.

F112Words in s. 17(3) inserted (1.4.1996) by 1994 c. 19, s. 20(4), Sch. 6 Pt. II para. 17(1)(a)(with ss. 54(5)(7), 55(5), Sch. 17 paras. 22(1), 23(2)); S.I. 1996/396, art. 3, Sch.

F114Words in s. 17(4) inserted (31.1.2017 for specified purposes, 3.4.2017 in so far as not already in force) by Policing and Crime Act 2017 (c. 3), s. 183(1)(5)(e), Sch. 1 para. 43; S.I. 2017/399, reg. 2, Sch. para. 38

F115Words in s. 17(4) substituted (31.1.2017 for specified purposes, 1.4.2018 in so far as not already in force) by Policing and Crime Act 2017 (c. 3), s. 183(1)(5)(e), Sch. 2 para. 64; S.I. 2018/227, reg. 4(c)

F120S. 17(4): words in para. (b) in definition of “local authority” substituted (1.4.1996) by 1994 c. 19, s. 66(6), Sch. 16 para. 64(1)(with ss. 54(5)(7), 55(5), Sch. 17 paras. 22(1), 23(2)); S.I. 1996/396, art. 3, Sch.

F121S. 17(4): words in para. (b) in definition of “local authority” inserted (1.10.1994 for specified purposes, otherwise 1.4.1995) by 1994 c. 29, s. 43, Sch. 4 Pt. II para. 55(b); S.I. 1994/2025, art. 6; S.I. 1994/3262, art. 4, Sch.

F122S. 17(4): words in paras. (a)(b) in definition of “local authority” substituted (1.4.1996) by 1996 c. 16, ss. 103, 104(1)(2), Sch. 7 Pt. I para. 1(2)(q)

F123S. 17(4): para. (a) in definition of “statutory undertaker” repealed (31.10.1994) by 1994 c. 21, s. 67, Sch. 9 para. 27(1), Sch. 11 Pt. II (with s. 40(7)); S.I. 1994/2553, art. 2

F127S. 17(4): paras. (ab)(ac) in definition of "statutory undertakers" inserted (1.11.1996) by 1995 c. 56, ss. 582(1), 583(2), Sch. 37 Pt. I para. 51(2)(with s. 1(4), Sch. 39) and para. (ab)(ac) repealed (1.9.1999 in relation to para. (ab)) by 1998 c. 31, ss. 140(3), 145(3), Sch. 31 (with ss. 138(9), 144(6)); S.I. 1999/2323, art. 2(1), Sch. 1

F131S. 17(4): definition of “a Welsh planning board” added (1.4.1996) by 1994 c. 19, s. 20(4), Sch. 6 Pt. II para. 17(1)(b)(with ss. 54(5)(7), 55(5), Sch. 17 paras. 22(1), 22(3)); S.I. 1996/396, art. 3, Sch.

F132S. 17(4): para. (b) and word “or” immediately preceding it in definition of “a Welsh planning board” repealed (1.4.1997) by 1995 c. 25, s. 120(3), Sch. 24 (with ss. 7(6), 115, 117): S.I. 1996/2560, art. 2, Sch.

Modifications etc. (not altering text)

C65S. 17(4) extended by S.I. 1985/1884, art. 4(t)

Marginal Citations

18 National Trust land.E+W

(1)This section applies to land belonging to the National Trust which is held by the Trust inalienably.

(2)A compulsory purchase order shall, in so far as it authorises the compulsory purchase of land to which this section applies, be subject to special parliamentary procedure in any case where an objection to [F133the compulsory purchase of the land] has been duly made by the National Trust and has not been withdrawn.

(3)In this section “held inalienably”, in relation to land belonging to the National Trust, means that the land is inalienable under section 21 of the M10National Trust Act 1907 or section 8 of the M11National Trust Act 1939.

Textual Amendments

Marginal Citations

M101907 c. cxxxvi.

19 Commons, open spaces etc. E+W

(1)In so far as a compulsory purchase order authorises the purchase of any land forming part of a common, open space or fuel or field garden allotment, the order shall be subject to special parliamentary procedure unless the Secretary of State is satisfied—

(a)that there has been or will be given in exchange for such land, other land, not being less in area and being equally advantageous to the persons, if any, entitled to rights of common or other rights, and to the public, and that the land given in exchange has been or will be vested in the persons in whom the land purchased was vested, and subject to the like rights, trusts and incidents as attach to the land purchased, or

F134[(aa)that the land is being purchased in order to secure its preservation or improve its management]

(b)that the land does not exceed 250 square yards in extent or is required for the widening or drainage of an existing highway or partly for the widening and partly for the drainage of such a highway and that the giving in exchange of other land is unnecessary, whether in the interests of the persons, if any, entitled to rights of common or other rights or in the interests of the public,

and certifies accordingly.

(2)Where it is proposed to give a certificate under this section, the Secretary of State shall [F135direct the acquiring authority to] give public notice of his intention so to do, and—

(a)after affording opportunity to all persons interested to make representations and objections in relation thereto, and

(b)after causing a public local inquiry to be held in any case where it appears to him to be expedient so to do, having regard to any representations or objections made,

the Secretary of State may, after considering any representations and objections made and, if an inquiry has been held, the report of the person who held the inquiry, give the certificate.

F136[(2A)Notice under subsection (2) above shall be given in such form and manner as the Secretary of State may direct.]

(3)A compulsory purchase order may provide for—

(a)vesting land given in exchange as mentioned in subsection (1) above in the persons, and subject to the rights, trusts and incidents, therein mentioned, and

(b)discharging the land purchased from all rights, trusts and incidents to which it was previously subject [F137except where the Secretary of State has given a certificate under subsection (1)(aa) above.].

(4)In this section—

  • common” includes any land subject to be enclosed under the Inclosure Acts 1845 to 1882, and any town or village green,

  • fuel or field garden allotment” means any allotment set out as a fuel allotment, or a field garden allotment, under an Inclosure Act,

  • open space” means any land laid out as a public garden, or used for the purposes of public recreation, or land being a disused burial ground.

F13820. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .E+W

Textual Amendments

21 Land within more than one provision in Part III.E+W

In the case of land falling within more than one of sections 17 to 20 above a compulsory purchase order shall be subject to special parliamentary procedure if required to be subject thereto by any of those sections.

SupplementalE+W

22 Notice of giving of certificate.E+W

As soon as may be after the giving of a certificate under this Part of this Act, the acquiring authority shall publish—

[F139(a)]in one or more local newspapers circulating in the locality in which the land comprised in the order is situated [F140, and

(b)on an appropriate website, until the end of the period of 6 weeks beginning with the day on which the certificate is given,]

a notice in the prescribed form stating that the certificate has been given.

Textual Amendments

F139Words in s. 22 renumbered as s. 22(a) (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling Up and Regeneration Act 2023 (c. 55), ss. 181(7)(a), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

F140S. 22(b) and word inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 181(7)(b), 255(7) (with s. 247); S.I. 2024/92, reg. 2(j); S.I. 2024/389, reg. 3(a) (with reg. 4)

Part IVE+W Validity and Date of Operation of Orders and Certificates

Modifications etc. (not altering text)

C69Parts II-IV applied (31.10.1994) by Opencast Coal Act 1958 c. 69, s. 16(4A) as substituted (31.10.1994) by 1994 c. 21, s. 52, Sch. 8 para. 14(5) (with s. 40(7)); S.I. 1994/2553, art. 2

23 Grounds for application to High Court.E+W

(1)If any person aggrieved by a compulsory purchase order desires to question the validity thereof, or of any provision contained therein, on the ground that the authorisation of a compulsory purchase thereby granted is not empowered to be granted under this Act or any such enactment as is mentioned in section 1(1) of this Act, he may make an application to the High Court.

(2)If any person aggrieved by—

(a)a compulsory purchase order, or

(b)a certificate under Part III of, or Schedule 3 to, this Act,

desires to question the validity thereof on the ground that any relevant requirement has not been complied with in relation to the order or certificate he may make an application to the High Court.

(3)In subsection (2) above “relevant requirement” means—

(a)any requirement of this Act, or of any regulation under section 7(2) above, or

(b)any requirement of the M12Tribunals and Inquiries Act [F1411992] or of any rules made, or having effect as if made, under that Act.

(4)An application to the High Court under this section shall be made within six weeks—

(a)in the case of a compulsory purchase order to which the M13Statutory Orders (Special Procedure) Act 1945 applies (and which is not excluded by section 27 below), from the date on which the order becomes operative under that Act,

(b)in the case of a compulsory purchase order to which the said Act of 1945 does not apply, from the date on which notice of the confirmation or making of the order is first published in accordance with this Act,

(c)in the case of a certificate, the date on which notice of the giving of the certificate is first published in accordance with this Act.

Textual Amendments

F141Word in s. 23(3)(b) substituted (1. 10. 1992) by Tribunals and Inquiries Act 1992 (c. 53), ss. 18(1), 19(2), Sch. 3 para.14.

Marginal Citations

M131945 (9 & 10 Geo 6) c. 18.

24 Powers of the court.E+W

(1)On an application under section 23 above the court may by interim order suspend the operation of the compulsory purchase order or any provision contained therein, or of the certificate, either generally or in so far as it affects any property of the applicant, until the final determination of the proceedings.

(2)If on the application the court is satisfied that—

(a)the authorisation granted by the compulsory purchase order is not empowered to be granted under this Act or any such enactment as is mentioned in section 1(1) of this Act, or

(b)the interests of the applicant have been substantially prejudiced by any relevant requirement (as defined in section 23(3) above) not having been complied with,

the court may quash the compulsory purchase order or any provision contained therein, or the certificate, either generally or in so far as it affects any property of the applicant.

[F142(3)If the court has power under subsection (2) to quash a compulsory purchase order it may instead quash the decision to confirm the order either generally or in so far as it affects any property of the applicant.]

Textual Amendments

25 Restriction on other court proceedings.E+W

Subject to the preceding provisions of this Part of this Act, a compulsory purchase order, or a certificate under Part III of, or Schedule 3 to, this Act, shall not, either before or after it has been confirmed, made or given, be questioned in any legal proceedings whatsoever.

26 Date of operation.E+W

(1)Subject to section 24 above, a compulsory purchase order, other than one to which the M14Statutory Orders (Special Procedure) Act 1945 applies, shall become operative on the date on which notice of the confirmation or making of the order is first published in accordance with this Act.

(2)Subject to section 24 above, a certificate under Part III of, or Schedule 3 to, this Act shall become operative on the date on which notice of the giving of the certificate is first published in accordance with this Act.

Marginal Citations

M141945 (9 & 10 Geo 6) c. 18.

27 Exclusion of orders confirmed by Act of Parliament.E+W

This Part of this Act shall not apply to an order which is confirmed by Act of Parliament under section [F1434 or] 6 of the M15Statutory Orders (Special Procedure) Act 1945.

Textual Amendments

Marginal Citations

M151945 (9 & 10 Geo 6) c. 18.

Part VE+W Procedure in Special Cases

Compulsory acquisition of rights over landE+W

28 Acquisition of rights over land by the creation of new rights.E+W

Schedule 3 to this Act applies to the compulsory acquisition under this Act of rights over land by the creation of new rights by virtue of—

(a). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F144

[F145(aa)section 21A of the M16Welsh Development Agency Act 1975,]

(b)section 13(1) of the M17Local Government (Miscellaneous Provisions) Act 1976,

F146(c). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(d)section 142(4) of the M18Local Government, Planning and Land Act 1980,

(e)section 250 of the M19Highways Act 1980.

F147(f). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

[F148(g)paragraph 1 of Schedule 3 to the Gas Act 1986.]

[F149(h)paragraph 1 of Schedule 3 to the Electricity Act 1989.]

[F150(i)paragraph 3(3) of Schedule 4 to the Communications Act 2003.]

Textual Amendments

F146S. 28(c) repealed (1.10.1998) by 1998 c. 38, s. 152, Sch. 18 Pt. IV (with ss. 137(1)); S.I. 1998/2244, art. 4

F147S. 28(f) repealed (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 19(1) Note 1 (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3)); S.I. 2003/3142, art. 3(2) (with art. 11)

F150S. 28(i) inserted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 58(2) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3)); S.I. 2003/3142, art. 3(2) (with art. 11)

Marginal Citations

29 Compulsory rights orders under Opencast Coal Act 1958.E+W

(1)This Act in its application to compulsory rights orders by section 4 of the M20Opencast Coal Act 1958 has effect subject to this section.

(2)Parts II, III and IV of this Act shall apply as if in those provisions—

(a)any reference to a compulsory purchase order were a reference to a compulsory rights order,

(b)any reference to the acquiring authority were a reference to [F151the Coal Authority] , and any reference to the confirming authority were a reference to the Secretary of State, and

(c)any reference to authorising the compulsory purchase of land were a reference to operating so as to confer F152. . . temporary rights of occupation and use of land.

(3)Any modifications of particular provisions of this Act which are specified in the following provisions of this section shall have effect, in relation to those provisions, in addition to the general modifications mentioned above.

(4)Part II of this Act shall apply as if for section 12 there was substituted—

The acquiring authority shall—

(a)serve on all persons who at the time when notice of the order is first published under section 11 above are known to the acquiring authority to be persons directly concerned a notice in the prescribed form—

(i)stating the effect of the order and that it is about to be submitted for confirmation, and

(ii)specifying the time (not being less than 21 days from service of the notice) within which, and the manner in which, objections thereto can be made, and

(b)affix conspicuously to some conspicuous object or objects on the land comprised in the order a notice or notices containing the particulars specified in paragraph (a)(i) and (ii) above.

(5)Section 13 of this Act shall apply as if for [F153the reference to a qualifying person for the purposes of section 12(2)] there were substituted a reference to any person who, in relation to the order, is a person directly concerned.

(6)Except where the Secretary of State is proceeding concurrently with respect to an application for [F154opencast planning permission] and a compulsory rights order, the Secretary of State may disregard an objection to such an order if he is satisfied that it relates to the question whether [F154opencast planning permission should be granted or should have been granted] and either—

(a)it relates exclusively to that question, or

(b)in so far as it relates to other matters, they consist entirely of matters which can be dealt with in the assessment of compensation.

This subsection is without prejudice to the operation of section 13 of this Act.

[F155(6A)Part III of this Act shall apply as if section 17 were omitted.]

(7)In section 19 of this Act—

(a)any reference to giving other land in exchange shall be construed as a reference to making other land available during the period for which the compulsory rights order is to have effect,

(b)the provisions of the said section 19 as to the vesting of land, and as to its being made subject to the like rights, trusts and incidents as the land purchased, shall apply with the necessary modifications, and

(c)subsection (3)(b) shall not apply.

(8)Section 23 of this Act shall apply as if—

(a)in subsection (1) for the first reference to this Act there were substituted a reference to the M21Opencast Coal Act 1958,

(b)in subsection (3)(a) the reference to this Act included a reference to that Act.

(9)The date on which the compulsory rights order becomes operative shall be that mentioned in section 26(1) of this Act or such later date (not being more than one year after confirmation of the order) as may be determined by the Secretary of State and specified in the order as confirmed.

(10)In the application of this Act to compulsory rights orders “prescribed” means prescribed by regulations under the M22Opencast Coal Act 1958.

[F156(11)In this section “opencast planning permission” and “persons directly concerned” have the same meanings as in the Opencast Coal Act 1958.]

Textual Amendments

F151Words in s. 29(2)(b) substituted (31.10.1994) by 1994 c. 21, s. 67, Sch. 9 para. 27(2)(a)(i) (with s. 40(7)); S.I. 1994/2553, art. 2

F152Words in s. 29(2)(c) repealed (31.10.1994) by 1994 c. 21, s. 67, Sch. 9 para. 27(2)(a)(ii), Sch. 11 Pt. II(with s. 40(7)); S.I. 1994/2553, art. 2

F155S. 29(6A) inserted (31.10.1994) by 1994 c. 21, s. 67, Sch. 9 para. 27(2)(b) (with s. 40(7)); S.I. 1994/2553, art. 2

Modifications etc. (not altering text)

C70S. 29 applied (with modifications) (31.10.1994) by Opencast Coal Act 1958 c. 69 s. 16(4A) (as substituted (31.10.1994) by 1994 c. 21, s. 52, Sch. 8 para. 14(5); S.I. 1994/2553, art. 2)

Marginal Citations

30 Acquisition of rights in connection with underground storage of gas.E+W

(1)Subject to this section, in relation to the compulsory purchase—

(a)of a right to store gas in an underground gas storage under section 12(1) of the M23Gas Act 1965, or

(b)of any right under subsections (2) or (3) of section 13 of that Act,

this Act, the enactments incorporated therewith and the M24Compulsory Purchase Act 1965 shall have effect as if—

(i)references (whatever the terms used) to the land comprised in the compulsory purchase order were construed, where the context so requires, as references to the stratum of land constituting the underground gas storage or, as the case may be, the land comprising the well, borehole or shaft, and

(ii)references to the obtaining or taking possession of the land so comprised were construed as references to the exercise of the right.

(2)In relation to the compulsory purchase of a right to store gas in an underground gas storage under section 12(1) of the M25Gas Act 1965 this Act shall have effect—

(a)as if in sections 16 to 18 of this Act references to the land comprised in the compulsory purchase order included references to any land held with the stratum of land constituting the underground gas storage,

(b)as if sections 19 and 20 of this Act were omitted.

(3)Section 28 above and Schedule 3 to this Act shall not apply to a compulsory purchase to which this section applies.

Statutory undertakers’ landE+W

31 Acquisition under certain Acts of statutory undertakers’ land without a certificate.E+W

(1)This section applies to a compulsory purchase order under—

(a)[F157the Town and Country Planning Act 1990 or the Planning (Listed Buildings and Conservation Areas) Act 1990],

F158(b). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(c)section 142 or 143 of the [F159Local Government, Planning and Land Act]1980 (acquisition by urban development corporation),

[F160(ca)section 207(2) of the Localism Act 2011 (acquisition by Mayoral development corporation),] or [F161 or

(d)section 21A of, and Schedule 4 to, the M26Welsh Development Agency Act 1975,]

being a compulsory purchase order authorising the acquisition of land which has been acquired by statutory undertakers for the purposes of their undertaking.

F162[(2)Section 16(2) of, and paragraph 3(2) of Schedule 3 to, this Act shall not apply to an order confirmed or made by the appropriate Minister jointly with the Minister or Ministers who would (apart from this subsection) have power to make or confirm it.]

(4)Where in accordance with this section a compulsory acquisition is effected under a compulsory purchase order confirmed or made without the appropriate Minister’s certificate [F163sections 280 to 282 of the Town and Country Planning Act 1990] (measure of compensation) shall apply in accordance with [F163section 280(1)(c)] of that Act.

Textual Amendments

F158S. 31(1)(b) repealed (1.10.1998) by 1998 c. 38, s. 152, Sch. 18 Pt. V (ss. 137(1), 139(2), 141(1), 143(2)); S.I. 1998/2444, art. 4

F159Words in s. 31(3)(c) substituted (1.10.1998) by 1998 c. 38, s. 135(3) (with ss. 139(2), 143(2)); S.I. 1998/2244, art. 4

F160S. 31(1)(ca) inserted (15.1.2012) by Localism Act 2011 (c. 20), s. 240(1)(l), Sch. 22 para. 7(3)

F161S. 31(1): Word “or” and para. (d) inserted (1.10.1998) by 1998 c. 38, s. 128, Sch. 14 Pt. II para. 19 (with ss. 139(2), 143(2)); S.I. 1998/2244, art. 4

Marginal Citations

Part VIE+W Footpaths and Bridleways

32 Power to extinguish certain public rights of way. E+W

(1)This section applies where land is acquired, or proposed to be acquired—

(a)in pursuance of a compulsory purchase order, or

(b)by agreement for a purpose, and by an authority, such that the compulsory acquisition of the land could be authorised by a compulsory purchase order,

and there subsists over any part of the land a public right of way, not being a right enjoyable by vehicular traffic.

(2)If the acquiring authority is satisfied that a suitable alternative right of way has been or will be provided, or that the provision thereof is not required, the acquiring authority may by order extinguish the right of way; and Schedule 6 to the M27Highways Act 1980 shall have effect as to the making, confirmation, validity and date of operation of any such order.

(3)If the acquiring authority is not the Secretary of State—

(a)the order under subsection (2) above shall not take effect unless confirmed by the Secretary of State, or unless confirmed, as an unopposed order, by the acquiring authority under paragraph 2(1)(b) of Schedule 6 to the M28Highways Act 1980 as applied by this section, and

(b)the Secretary of State shall not confirm the order unless satisfied that this section applies, and that a suitable alternative right of way has been or will be provided, or that the provision thereof is not required.

(4)The time specified in the order under subsection (2) above as the time from which the right of way is extinguished shall not be earlier than—

(a)confirmation of the order, or if the Secretary of State is the acquiring authority, the making of the order;

(b)if in the exercise of the power conferred by section 11(1) of the M29Compulsory Purchase Act 1965, or by agreement, the acquiring authority takes possession of the land, the date on which the authority takes possession of the land;

(c)if the acquiring authority does not take possession of the land in exercise of any such power, the date on which the acquisition of the land is completed.

(5)Where a right of way is extinguished under this section at a date before the acquisition of the land is completed, then if at any time thereafter it appears to the acquiring authority that the proposal to acquire the land has been abandoned, the acquiring authority shall by order direct that the right shall revive, without prejudice, however, to the making of a new order extinguishing the right.

(6)No order shall be made under subsection (2) above as respects a right of way over land on, over or under which there is any apparatus belonging to statutory undertakers unless the undertakers consent to the making of the order, and—

(a)the consent may be given subject to the condition that there are included in the order such provisions for the protection of the undertakers as they may reasonably require, and

(b)the consent shall not be unreasonably refused.

Any question arising under this subsection whether any requirement or refusal is reasonable shall be determined by the appropriate Minister.

[F164(6A)In subsection (6) above the reference to apparatus belonging to statutory undertakers shall include a reference to [F165electronic communications apparatus kept installed for the purposes of an electronic communications code network] and in relation to any such apparatus—

(a)the references to the undertakers shall have effect as references to the operator of the [F166network] in question; and

(b)the reference to the appropriate Minister shall have effect as a reference to the Secretary of State.]

(7)This section shall not apply where [F167section 251 or 258 of the Town and Country Planning Act 1990] (extinction of public rights of way over land held for planning purposes) applies.

(8)This section applies subject to any provision to the contrary in any other Act and subject in particular to the exclusion of this Part of this Act by—

  • [F168[F169section 41 or 42 or 42A] of the Civil Aviation Act 1982],

  • . . . F170

(9)Except as provided in this section nothing in this Act shall be taken to authorise the extinction of any public right of way.

Textual Amendments

F165Words in s. 32(6A) substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 58(3)(a) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3)); S.I. 2003/3142, art. 3(2) (with art. 11)

F166Word in s. 32(6A)(a) substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 58(3)(b) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3)); S.I. 2003/3142, art. 3(2) (with art. 11)

F169Words in s. 32(8) substituted (21.12.2001) by S.I. 2001/4050, art. 2, Sch. Pt. II para. 5(b)

Modifications etc. (not altering text)

C71S. 32 applied by S.I. 1986/564, art. 4(2)(b)

Marginal Citations

33 Land acquired before commencement of this Act.E+W

(1)In section 32 above “compulsory purchase order” includes—

(a)a compulsory purchase order under the M30Acquisition of Land (Authorisation Procedure) Act 1946, and

(b)an authorisation under section 2 of that Act (which was repealed by the M31Statute Law Revision Act 1953).

(2)Section 32 above shall apply in relation to land acquired before the commencement of the said Act of 1946 by a local authority, being—

(a)land acquired compulsorily under any public general Act in force immediately before the commencement of the said Act of 1946 other than—

(i)the M32Light Railways Acts 1896 and M331912,

(ii)Part III of the M34Housing Act 1936,

(iii)the M35Town and Country Planning Act 1944, or

(b)land acquired by agreement for a purpose such that the land could have been so acquired compulsorily.

Marginal Citations

M311953 (2 & 3 Eliz. 2) c. 5.

Part VIIE+W Supplemental

34 Consequential amendments, transitionals and repeals.E+W

(1)The enactments specified in Schedule 4 to this Act shall have effect subject to the amendments specified in that Schedule, being amendments consequential upon the provisions of this Act.

(2)The transitional provisions in Schedule 5 to this Act shall have effect.

(3)The enactments and instruments specified in Schedule 6 to this Act (of which those in Part II are spent) shall be repealed to the extent specified in the third column of that Schedule.

Modifications etc. (not altering text)

C73The text of s. 34(1)(3) and Schedule 6 (except the para. commencing “The repaeals”) is in the form in which it was originally enacted: it was not reproduced in Statutes in Force and does not reflect any amendments or repeals which may have been made prior to 1.2.1991.

35 Short title, commencement and extent.E+W

(1)This Act may be cited as the Acquisition of Land Act 1981.

(2)This Act shall come into force at the expiration of a period of three months beginning with the date on which it is passed.

(3)This Act, except so far as Schedule 4 amends any enactment which extends to Scotland or Northern Ireland, extends to England and Wales only.

SCHEDULES

Section 2(3).

SCHEDULE 1E+W Purchases by Ministers

Modifications etc. (not altering text)

1(1)This Schedule has effect where a Minister is the acquiring authority.E+W

(2)The compulsory purchase order shall be prepared in draft and shall describe by reference to a map the land to which it applies.

(3)Subject as aforesaid the form of the order shall be such as the Minister may determine.

[F171(3A)The order may, in particular, include provision specifying a period longer than three years for the purposes of section 4 of the Compulsory Purchase Act 1965 (time limit for notice to treat) and section 5A of the Compulsory Purchase (Vesting Declarations) Act 1981 (time limit for general vesting declaration).]

(4)As soon as may be after the draft of the order has been prepared, and before making the order, the Minister shall comply with paragraphs 2 and 3 below.

(5)The provisions of the said paragraphs 2 and 3 as to the notice thereby required shall apply subject to such modifications of the form of the notice as appear to the Minister to be requisite.

[F172 Notices in newspapers] [F172Public notices]E+W

Textual Amendments

F172Sch. 1 para. 2 cross-heading substituted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(2) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

2(1)The Minister shall—E+W

[F173(a)] in two successive weeks publish a notice in the prescribed form in one or more local newspapers circulating in the locality in which the land comprised in the draft order is situated [F174, and

(b)for a period of at least 21 days ending with the day specified under sub-paragraph (2)(d), publish a notice in the prescribed form on an appropriate website.]

(2)The [F175notice] [F175notices] shall—

(a)state that the order has been prepared in draft and is about to be made,

(b)describe the land and state the purpose for which the land is required,

(c)name a place within the locality where a copy of the draft order and of the map referred to therein may be inspected, [F176and]

[F177(ca)specify a website on which those copies may be viewed, and]

[F178(d)specify the time (not being less than twenty-one days from the first publication of the notice) within which, and the manner in which, objections to the draft order can be made.]

[F178(d)specify the final day for making objections to the draft order, and the manner in which objections can be made.]

[F179(2A)If the appropriate authority (see paragraph 4(8)) is satisfied that, because of special circumstances, it is impracticable for the Minister to make the copies referred to in sub-paragraph (2)(c) available for inspection at an appropriate place, the appropriate authority may direct that the requirement in sub-paragraph (2)(c) (together with that in paragraph 3(1)(ba)) is not to apply.]

[F180(3)In addition, the Minister shall affix a notice in the prescribed form to a conspicuous object or objects on or near the land comprised in the draft order.

(4)The notice under sub-paragraph (3) must—

(a)be addressed to persons occupying or having an interest in the land, and

(b)set out each of the matters mentioned in sub-paragraph (2) [F181(but reading the reference there to first publication of the notice as a reference to the day when the notice under sub-paragraph (3) is first affixed)].]

Textual Amendments

F173Words in Sch. 1 para. 2(1) renumbered as Sch. 1 para. 2(1)(a) (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling Up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(3)(a)(i) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F174Sch. 1 para. 2(1)(b) and word inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(3)(a)(ii) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F175Word in Sch. 1 para. 2(2) substituted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(3)(b)(i) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F176Word in Sch. 1 para. 2(2)(c) omitted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by virtue of Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(3)(b)(ii) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F177Sch. 1 para. 2(2)(ca) inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(3)(b)(iii) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F178Sch. 1 para. 2(2)(d) substituted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(3)(b)(iv) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F179Sch. 1 para. 2(2A) inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(3)(c) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F180Sch. 1 para. 2(3)(4) added (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 101(2) (with s. 101(6)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

F181Words in Sch. 1 para. 2(4)(b) omitted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by virtue of Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(3)(d) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

Notices to owners, lessees [F182, occupiers and others]E+W

Textual Amendments

F182Words in Sch. 1 para. 3 cross-heading substituted (30.9.2022) by Environment Act 2021 (c. 30), s. 147(3), Sch. 20 para. 3(2) (with s. 144); S.I. 2022/48, reg. 5(d)

3(1)The Minister shall serve on every [F183qualifying person] a notice in the prescribed form—E+W

(a)stating the effect of the draft order,

(b)stating that it is about to be made, [F184and]

[F185(ba)(subject to paragraph 2(2A)) naming a place within the locality where a copy of the draft order and of the map referred to in it may be inspected,

(bb)specifying a website on which those copies may be viewed, and]

[F186(c)specifying the time (not being less than twenty-one days from service of the notice) within which, and the manner in which, objections to the draft order can be made.]

[F186(c)specifying the final day for making objections to the draft order, and the manner in which objections can be made.]

(2)[F187A person is a qualifying person, in relation to land comprised in a draft order, if—

(a)he is an owner, lessee, tenant (whatever the tenancy period) or occupier of any such land, F188...

(b)he falls within sub-paragraph (2A) [F189, or

(c)the person is entitled to the benefit of an obligation under a conservation covenant (within the meaning of Part 7 of the Environment Act 2021) relating to the land.]

(2A)A person falls within this sub-paragraph if he is—

(a)a person to whom the Minister would, if proceeding under section 5(1) of the Compulsory Purchase Act 1965, be required to give a notice to treat, or

(b)a person the Minister thinks is likely to be entitled to make a relevant claim if the order is made and the compulsory purchase takes place, so far as he is known to the Minister after making diligent inquiry.

(2B)A relevant claim is a claim for compensation under section 10 of the Compulsory Purchase Act 1965 (compensation for injurious affection).]

(3)Where under this paragraph any notice is required to be served on an owner of land, and the land is ecclesiastical property, a like notice shall be served on the [F190Diocesan Board of Finance for the diocese in which the land is situated].

In this sub-paragraph “ecclesiastical property” means land belonging to any ecclesiastical benefice [F191of the Church of England], or being or forming part of a church subject to the jurisdiction of the bishop of any diocese [F191of the Church of England] or the site of such a church, or being or forming part of a burial ground subject to such jurisdiction F192....

Textual Amendments

F183Words in Sch. 1 para. 3(1) substituted (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 101(3)(a) (with s. 101(6)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

F184Word in Sch. 1 para. 3(1)(b) omitted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by virtue of Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(4)(a) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F185Sch. 1 para. 3(1)(ba)(bb) inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(4)(b) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F186Sch. 1 para. 3(1)(c) substituted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(4)(c) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F187Sch. 1 para. 3(2)-(2B) substituted for Sch. 1 para. 3(2) (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 101(3)(b) (with s. 101(6)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

F190Words in Sch. 1 para. 3(3) substituted (E.) (1.10.2006) by Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), s. 16(2), Sch. 5 para. 24(2)(a); 2006 No. 2, Instrument made by Archbishops

F191Words in Sch. 1 para. 3(3) inserted (E.) (1.10.2006) by Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), s. 16(2), Sch. 5 para. 24(2)(b); 2006 No. 2, Instrument made by Archbishops

F192Words in Sch. 1 para. 3(3) omitted (E.) (1.10.2006) by virtue of Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), s. 16(2), Sch. 5 para. 24(2)(c); 2006 No. 2, Instrument made by Archbishops

Modifications etc. (not altering text)

[F193Final day for making objectionsE+W

Textual Amendments

F193Sch. 1 para. 3A and cross-heading inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(5) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

3A(1)For the purposes of paragraphs 2 and 3, the day specified as the final day for making objections must be the last day, or a day after the last day, of the period of 21 days beginning with the first day at the beginning of which the Minister expects that all of the following conditions will be satisfied.E+W

(2)The conditions are that—

(a)a notice has been published for the first time as required by paragraph 2(1)(a),

(b)publication as required by paragraph 2(1)(b) has begun,

(c)a notice has been affixed as required by paragraph 2(3), and

(d)a notice has been served on every qualifying person as required by paragraph 3(1).]

Making of orderE+W

4[F194(1)The Minister may make a compulsory purchase order with or without modifications if he is satisfied—E+W

(a)that the notice requirements have been complied with, and

(b)that one of the conditions in sub-paragraph (2) is satisfied.

(2)The conditions are—

(a)no relevant objection is made;

(b)every relevant objection made is either withdrawn or disregarded.

(3)The appropriate authority may require every person who makes a relevant objection to state the grounds of the objection in writing.

(4)If the appropriate authority is satisfied that an objection relates exclusively to matters which can be dealt with by the tribunal by whom the compensation is to be assessed it may disregard the objection.

(5)The notice requirements are the requirements under paragraphs 2 and 3 to publish, affix and serve notices in connection with the compulsory purchase order.

(6)A relevant objection is an objection by a person who is a qualifying person for the purposes of paragraph 3(2), but if such a person qualifies only by virtue of paragraph 3(2A)(b) and the Minister thinks that he is not likely to be entitled to make a relevant claim his objection is not a relevant objection.

(7)Disregarded means disregarded under sub-paragraph (4) or under any other power to disregard a relevant objection contained in the enactment providing for the compulsory purchase.

(8)The appropriate authority is—

(a)in the case of an order proposed to be made in the exercise of highway land acquisition powers, the Minister and the planning Minister acting jointly,

(b)in any other case, the Minister.

(9)Highway land acquisition powers must be construed in accordance with the Highways Act 1980.

(10)The planning Minister is the Secretary of State for the time being having general responsibility in planning matters.

Textual Amendments

F194Sch. 1 paras. 4-4B substituted for Sch. 1 para. 4 (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 101(4) (with s. 101(6)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

4A(1)This paragraph applies to the making of a compulsory purchase order if a relevant objection is made which is neither—E+W

(a)withdrawn, nor

(b)disregarded,

(a remaining objection).

[F195(2)The appropriate authority may proceed under the written representations procedure—

(a)if the order is not subject to special parliamentary procedure;

(b)in the case of an order to which section 16 applies, if a certificate has been given under subsection (2) of that section, and

(c)if every person who has made a remaining objection consents in the prescribed manner.

(3)If sub-paragraph (2) does not apply or if the appropriate authority decides not to proceed under that sub-paragraph, it must either—

(a)cause a public local inquiry to be held, or

(b)give every person who has made a remaining objection an opportunity of appearing before and being heard by a person appointed by the appropriate authority for the purpose.

(4)If a person who has made a remaining objection takes the opportunity to appear before a person appointed under sub-paragraph (3)(b) the appropriate authority must give any other person it thinks appropriate the opportunity to be heard at the same time.

(5)The Minister may make the order with or without modifications if—

(a)the appropriate authority has considered the objection, and

(b)one of the conditions in sub-paragraph (6) is satisfied.

(6)The conditions are—

(a)the appropriate authority has followed the written representations procedure;

(b)in a case which falls within sub-paragraph (3), if an inquiry was held or a person was appointed under sub-paragraph (3)(b), the appropriate authority has considered the report of the person who held the inquiry or who was so appointed.

(7)The written representations procedure is such procedure as is prescribed for the purposes of this paragraph including provision affording an opportunity to—

(a)every person who has made a remaining objection, and

(b)any other person the appropriate authority thinks appropriate,

to make written representations as to whether the order should be made.

(8)Regulations under sub-paragraph (7) may make provision as to the giving of reasons for decisions taken in cases where the written representations procedure is followed.]

[F195(1A)The appropriate authority must cause a public local inquiry to be held if—

(a)the order is subject to special parliamentary procedure, or

(b)in the case of an order to which section 16 applies, a certificate has been given under subsection (2) of that section.

(1B)If sub-paragraph (1A) does not apply, the appropriate authority must either—

(a)cause a public local inquiry to be held, or

(b)proceed under the representations procedure.

(1C)In deciding between those options, the appropriate authority must have regard to the scale and complexity of what is proposed by the draft order.

(1D)The representations procedure is a procedure to be prescribed.

(1E)The regulations prescribing the procedure must include provision—

(a)enabling each person who has made a remaining objection to make representations—

(i)in writing to the appropriate authority, or

(ii)if the person so requests, at a hearing, and

(b)enabling the Minister, and any other person the appropriate authority thinks appropriate, to make representations—

(i)in writing to the appropriate authority, or

(ii)if applicable, at a hearing held as mentioned in paragraph (a)(ii).

(1F)The regulations may provide for hearings to be held by the appropriate authority or by a person appointed by the appropriate authority.

(1G)In sub-paragraph (1E), “representations” means representations as to whether the order should be made.

(1H)Before the Minister makes the order, the appropriate authority must consider—

(a)each remaining objection;

(b)if a public local inquiry was held, the report of the person who held it;

(c)if the representations procedure was followed and the appropriate authority held a hearing, the representations made at the hearing;

(d)if the representations procedure was followed and a person appointed by the appropriate authority held a hearing, the report of that person;

(e)if the representations procedure was followed and written representations were made, those representations.

(1I)The Minister may make the order with or without modifications.

(1J)Regulations under sub-paragraph (1D) may include provision as to the giving of reasons for decisions taken by the appropriate authority in cases where the representations procedure is followed.]

(9)Expressions used in this paragraph and in paragraph 4 must be construed in accordance with paragraph 4.

Textual Amendments

F194Sch. 1 paras. 4-4B substituted for Sch. 1 para. 4 (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 101(4) (with s. 101(6)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

[F1964AA(1)The Minister may make a compulsory purchase order conditionally.E+W

(2)The effect of making an order conditionally is that the order—

(a)does not become operative until the Minister has decided, following consideration by the appropriate authority (see paragraph 4(8)), that certain conditions have been met, and

(b)expires if the Minister has not decided that by a certain time.

(3)The conditions and the time are to be specified by the Minister when making the order.

(4)The procedure to be followed in connection with the consideration and decision referred to in sub-paragraph (2)(a) is to be prescribed.

(5)The prescribed procedure must include provision for each relevant objector—

(a)to be given notice that the appropriate authority is to consider whether the conditions have been met (or for steps to be taken with a view to notifying them), and

(b)to have the opportunity to make written representations relating to that consideration;

and may include provision as to the giving of reasons for the decision by the Minister.

(6)In sub-paragraph (5), “relevant objector” means a person who made an objection to the draft order that—

(a)was a remaining objection for the purposes of paragraph 4A, and

(b)had not been withdrawn by the time the order was made.]

Textual Amendments

F194Sch. 1 paras. 4-4B substituted for Sch. 1 para. 4 (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 101(4) (with s. 101(6)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

4B(1)The Minister may make an order (with or without modifications) so far as it relates to part of the land comprised in the draft order (the “relevant part”) if each of the conditions in sub-paragraph (2) is met.E+W

(2)The conditions are—

(a)the Minister or, if there is a remaining objection in respect of the order, the appropriate authority is satisfied that the order ought to be made so far as it relates to the relevant part but has not for the time being determined whether the order ought to be made so far as it relates to the remaining part;

(b)the Minister is satisfied that the notice requirements have been complied with.

(3)If there is a remaining objection in respect of the order, the Minister may only act under sub-paragraph (1) after the appropriate authority has complied with paragraph [F1974A(2) or (3)] [F1974A(1A) or (1B)] (as the case may be).

(4)But he may act under sub-paragraph (1) without the appropriate authority having complied with those provisions if he is satisfied that all remaining objections relate solely to the remaining part of the land.

(5)If the Minister acts under sub-paragraph (1)—

(a)he must give a direction postponing consideration of the order, so far as it relates to the remaining part, until such time as may be specified by or under the direction;

(b)the order so far as it relates to each part of the land must be treated as a separate order.

(6)The notices to be published, affixed and served under paragraph 6 must include a statement as to the effect of the direction given under sub-paragraph (5)(a).

(7)Expressions used in this paragraph and in paragraph 4 or 4A must be construed in accordance with paragraph 4 or 4A (as the case may be).]

Textual Amendments

F194Sch. 1 paras. 4-4B substituted for Sch. 1 para. 4 (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 101(4) (with s. 101(6)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

Land not included in draft orderE+W

5E+WThe order, as made by the Minister, shall not, unless all persons interested consent, authorise the Minister to purchase compulsorily any land which the draft order would not have authorised the Minister to purchase compulsorily if it had been made without modification.

Notices after making of orderE+W

[F1986(1)After the order has been made, the Minister must—E+W

(a)serve a making notice, and a copy of the order as made, on each person on whom a notice was required to be served under paragraph 3, and

(b)affix a making notice to a conspicuous object or objects on or near the land comprised in the order.

(2)The notice under sub-paragraph (1)(b) must—

(a)be addressed to persons occupying or having an interest in the land;

(b)so far as practicable, be kept in place by the acquiring authority until the expiry of a period of six weeks beginning with the [F199date when the order becomes operative] [F199day on which the Minister takes the final step needed to comply with sub-paragraph (1)(a)].

(3)[F200Unless the order was made conditionally,] The Minister must also publish a making notice—

[F201(a)]in one or more local newspapers circulating in the locality in which the land comprised in the order is situated [F202, and

(b)on an appropriate website, until the end of the period of 6 weeks beginning with the day on which the Minister takes the final step needed to comply with sub-paragraph (1)(a).]

(4)A making notice is a notice—

(a)describing the land;

(b)stating that the order has been made;

[F203(ba)if the order was made conditionally, stating the conditions and time specified under paragraph 4AA(3);]

(c)(except in the case of a notice under sub-paragraph (1)(a)) naming a place where a copy of the order as made and of the map referred to there may be inspected at all reasonable hours;

[F204(ca)specifying a website on which those copies may be viewed;]

(d)that a person aggrieved by the order may apply to the High Court as mentioned in section 23.

[F205(e)containing a prescribed statement about the effect of Parts 2 and 3 of the Compulsory Purchase (Vesting Declarations) Act 1981;

(f)inviting any person who would be entitled to claim compensation if a declaration were executed under section 4 of that Act to give the acquiring authority information about the person's name, address and interest in land, using a prescribed form.]

[F206(4A)If the appropriate authority is satisfied that, because of special circumstances, it is impracticable for the Minister to make the copies referred to in sub-paragraph (4)(c) available for inspection at an appropriate place, the appropriate authority may direct that the requirement in sub-paragraph (4)(c) is not to apply.]

[F207(4B)If the order was made conditionally and the Minister decides under paragraph 4AA that the conditions have been met, the Minister must serve—

(a)a copy of the order, and

(b)a fulfilment notice,

on each person on whom a notice was required to be served under paragraph 3.

(4C)Where sub-paragraph (4B) applies, the Minister must also—

(a)affix a fulfilment notice to a conspicuous object or objects on or near the land comprised in the order, and

(b)publish a fulfilment notice—

(i)in one or more local newspapers circulating in the locality in which the land comprised in the order is situated, and

(ii)on an appropriate website, until the end of the period of 6 weeks beginning with the day on which the Minister takes the final step needed to comply with sub-paragraph (4B).

(4D)A fulfilment notice is a notice—

(a)stating that the conditions subject to which the order was made have been met and that the order will therefore become operative, and

(b)annexing the information that was contained in the making notice.]

(5)A making notice [F208or fulfilment notice] must be in the prescribed form.

[F209(6)The Minister must send the making notice [F210, and any fulfilment notice,] to the Chief Land Registrar and [F211it] [F211each such notice] shall be a local land charge.]]

Textual Amendments

F198Sch. 1 para. 6 substituted (6.8.2004 for specified purposes, 31.10.2004 in so far as not already in force) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 101(5) (with s. 101(6)); S.I. 2004/2097, art. 2; S.I. 2004/2593, art. 2(a)

F199Words in Sch. 1 para. 6(2)(b) substituted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 3(3)(a) (with s. 247); S.I. 2024/389, reg. 2(t)

F200Words in Sch. 1 para. 6(3) inserted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 3(3)(b) (with s. 247); S.I. 2024/389, reg. 2(t)

F201Words in Sch. 1 para. 6(3) renumbered as Sch. 1 para. 6(3)(a) (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(6)(a)(i) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F202Sch. 1 para. 6(3)(b) and word inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(6)(a)(ii) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F203Sch. 1 para. 6(4)(ba) inserted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 3(3)(c) (with s. 247); S.I. 2024/389, reg. 2(t)

F204ch. 1 para. 6(4)(ca) inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(6)(b) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F205Sch. 1 para. 6(4)(e)(f) inserted (1.10.2016 for specified purposes, 3.2.2017 for specified purposes, 6.4.2017 in so far as not already in force) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 15 para. 3(2); S.I. 2016/956, reg. 2(b)(ii); S.I. 2017/75, reg. 3(i); S.I. 2017/281, reg. 4(j)

F206Sch. 1 para. 6(4A) inserted (31.1.2024 for specified purposes, 30.4.2024 for E. in so far as not already in force) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 1(6)(c) (with s. 247); S.I. 2024/92, reg. 2(r); S.I. 2024/389, reg. 3(c) (with reg. 4)

F207Sch. 1 para. 6(4B)-(4D) inserted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 3(3)(d) (with s. 247); S.I. 2024/389, reg. 2(t)

F208Words in Sch. 1 para. 6(5) inserted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 3(3)(e) (with s. 247); S.I. 2024/389, reg. 2(t)

F209Sch. 1 para. 6(6) inserted (3.2.2017 for specified purposes, 6.4.2017 in so far as not already in force) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 15 para. 3(3); S.I. 2017/75, reg. 3(i) (with reg. 5); S.I. 2017/281, reg. 4(j)

F211Words in Sch. 1 para. 6(6) substituted (31.3.2024 for specified purposes) by Levelling-up and Regeneration Act 2023 (c. 55), s. 255(7), Sch. 19 para. 3(3)(f)(ii) (with s. 247); S.I. 2024/389, reg. 2(t)

Section 3.

SCHEDULE 2E+W Minerals

Modifications etc. (not altering text)

C76Sch. 2 excluded by Water Act 1989 (c. 15, SIF 130), s. 159, (with ss. 58(7), 101(1), 141(6), 160(1)(2)(4), 163, 189(4)–(10), 190, 193(1), Sch. 26 paras. 3(1)(2), 17, 40(4), 57(6), 58)

Sch. 2 excluded (1.12.1991) by Water Resources Act 1991 (c. 57, SIF 130), ss.182, 225(2) (with ss. 16(6), 179, 222(3), Sch. 22 para. 1, Sch. 23 para. 6)

Part IE+W

Modifications etc. (not altering text)

C80Sch. 2 Pts. 1-3 applied (with modifications) (2.10.2014) by The Clocaenog Forest Wind Farm Order 2014 (S.I. 2014/2441), arts. 1, 22 (with art. 33)

1(1)A compulsory purchase order may, as respects all or any of the land to which the order relates, provide for the incorporation with the compulsory purchase order of—E+W

(a)Part II of this Schedule (which re-enacts section 77 of the Railways Clauses Consolidation Act 1845), or

(b)Parts II and III of this Schedule (which together re-enact sections 77 to 85 of that Act).

(2)In this Schedule, unless the context otherwise requires—

  • mines” means mines of coal, ironstone, slate and other minerals,

  • owner”, in relation to mines or minerals, includes a lessee or occupier.

(3)In this Schedule “underlying”, in relation to mines or minerals, means mines or minerals lying under, or within the prescribed distance from, the undertaking, and in this sub-paragraph “prescribed distance” means the distance prescribed by the compulsory purchase order, or if no distance is so prescribed, 40 yards.

(4)In this Schedule “the undertaking” means the undertaking which the acquiring authority is authorised to carry out by the enactment under which the purchase is authorised, but the compulsory purchase order may include such modifications of references in this Schedule to the undertaking as may be specified in the order.

(5)This Schedule has effect subject to [F212section 10(3) of the Coal Industry Act 1994] (coal not to be alienated under enactments authorising compulsory purchase of land).

Textual Amendments

F212Words in Sch. 2 para. 1(5) substituted (31.10.1994) by 1994 c. 21, s. 67, Sch. 9 para. 27(3) (with s. 40(7)); S.I. 1994/2553, art. 2

Modifications etc. (not altering text)

Part IIE+W

Modifications etc. (not altering text)

C83Sch. 2 Pts. 2, 3 applied (with modifications) (13.2.1992) by Severn Bridges Act 1992 (c. 3), s. 2(6), Sch. 2 Pt. II para.3

C84Sch. 2 Pt. 2 applied (16.3.1992) by Avon Weir Act 1992 (c. v), s. 4(2) (with s. 61)

C85Sch. 2 Pts. 2, 3 applied (16.7.1992) by Cattewater Reclamation Act 1992 (c. xiv), s. 3(3)

Sch. 2 Pts. 2, 3 applied (5.11.1993) by 1993 c. 42, s. 5, Sch. 4 para. 2 (with s. 30(1), Sch. 2 para. 9).

Sch. 2 Pt. 2 applied (28.7.1998) by 1998 c. iv, s. 7(1) (with s. 41)

C86Sch. 2 Pts. 2, 3 applied (with modifications) by Dartford-Thurrock Crossing Act 1988 (c. 20, SIF 59), s. 2(5), Sch. 2 Pt. II para. 4(1)

Sch. 2 Pts. 2, 3 applied (with modifications) (3.6.1999) by S.I. 1999/1555, art. 9

Sch. 2 Pt 2 applied (with modifications) (E.) (29.3.2001) by S.I. 2001/1347, art. 36(1) (with arts. 15, 37, 38(2))

Sch. 2 Pt. 2 applied (with modifications) (E.) (29.3.2001) by S.I. 2001/1348, art. 12(1)

C87Sch. 2 Pt. 2 modified (18.12.1996) by 1996 c. 61, s. 4, Sch. 4 Pt. III para. 13

C88Sch. 2 Pt. 2 applied (with modifications) (12.8.2002) by The Channel Tunnel Rail Link (Thames Tunnel Approach) Order 2002 (S.I. 2002/1943), art. 6(2)

Sch. 2 Pt. 2 applied (with modifications) (14.3.2002) by The Chester Guided Busway Order 2002 (S.I. 2002/412), art. 39(1) (with art. 38)

C90Sch. 2 Pts. 2, 3 applied (with modifications) (22.7.2005) by The Midland Metro (Birmingham City Centre Extension, etc.) Order 2005 (S.I. 2005/1794), arts. 1, 46(1) (with art. 47)

C91Sch. 2 Pt. 2 applied (with modifications) (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 6 para. 17

C92Sch. 2 Pts. 2, 3 incorporated (with modifications) (15.8.2013) by The North Blyth Biomass Power Station Order 2013 (S.I. 2013/1873), arts. 1, 14 (with art. 30)

C93Sch. 2 Pt. 2 incorporated (with modifications) (7.5.2014) by The National Grid (North London Reinforcement Project) Order 2014 (S.I. 2014/1052), arts. 1, 23

Sch. 2 Pt. 2 incorporated (with modifications) (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), arts. 1, 40

C94Sch. 2 Pt. 2 incorporated (with modifications) (29.10.2014) by The Able Marine Energy Park Development Consent Order 2014 (S.I. 2014/2935), art. 32 (with arts. 30(4), 53)

C96Sch. 2 Pt. 2 incorporated (with modifications) (25.2.2015) by The A160/A180 (Port of Immingham Improvement) Development Consent Order 2015 (S.I. 2015/129), arts. 1, 20

C97Sch. 2 Pt. 2 incorporated (with modifications) (1.4.2015) by The Knottingley Power Plant Order 2015 (S.I. 2015/680), arts. 1, 19 (with Sch. 8 para. 10)

C98Sch. 2 Pts. 2, 3 incorporated (with modifications) (9.6.2015) by The White Moss Landfill Order 2015 (S.I. 2015/1317), arts. 1, 13 (with art. 5)

C100Sch. 2 Pts. 2, 3 incorporated in part (with modifications) (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), arts. 1, 17(1) (with art. 30)

C101Sch. 2 Pt. 2 incorporated (with modifications) (26.8.2015) by The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (S.I. 2015/1592), arts. 1, 23 (with arts. 40, 41)

C102Sch. 2 Pt. 2 incorporated in part (with modifications) (30.12.2015) by The Port Talbot Steelworks Generating Station Order 2015 (S.I. 2015/1984), arts. 1, 14 (with art. 26)

C103Sch. 2 Pts. 2, 3 incorporated (with modifications) (2.2.2016) by The East Midlands Gateway Rail Freight Interchange and Highway Order 2016 (S.I. 2016/17), arts. 1, 27

C104Sch. 2 Pt. 2 incorporated in part (with modifications) (9.2.2016) by The National Grid (Hinkley Point C Connection Project) Order 2016 (S.I. 2016/49), arts. 1, 20 (with art. 32)

C105Sch. 2 Pt. 2 incorporated (with modifications) (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), arts. 1, 19 (with art. 37)

C106Sch. 2 Pts. 2, 3 incorporated in part (with modifications) (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), arts. 1, 21 (with art. 39)

C107Sch. 2 Pts. 2, 3 incorporated (with modifications) (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), arts. 1, 21 (with arts. 4, 5(3))

C109Sch. 2 Pts. 2, 3 incorporated (with modifications) (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), arts. 1, 26 (with arts. 35, 36)

C110Sch. 2 Pts. 2, 3 incorporated (with modifications) (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), arts. 1, 37 (with art. 43)

C111Sch. 2 Pts. 2, 3 incorporated in part (with modifications) (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), arts. 1, 33

C113Sch. 2 Pt. 2 incorporated (with modifications) (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), arts. 1, 19 (with art. 22)

C114Sch. 2 Pts. 2, 3 incorporated (with modifications) (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 22 (with arts. 4, 37)

C115Sch. 2 Pts. 2, 3 incorporated (with modifications) (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 20

C116Sch. 2 Pt. 2 incorporated (with modifications) (3.10.2018) by The A19/A184 Testos Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 21 (with arts. 3(3), 5)

C118Sch. 2 Pt. 2 incorporated (with modifications) (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 19

C119Sch. 2 Pt. 2 incorporated (with modifications) (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 33

C120Sch. 2 Pt. 2 incorporated in part (with modifications) (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), arts. 1, 28 (with Sch. 13 Pt. 1 para. 19)

C121Sch. 2 Pt. 2 incorporated (with modifications) (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 24 (with art. 3(1))

C122Sch. 2 Pt. 2 incorporated (with modifications) (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 17 (with art. 7)

C123Sch. 2 Pt. 2 incorporated (with modifications) (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 21 (with arts. 5, 44)

C124Sch. 2 Pt. 2 incorporated in part (with modifications) (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 28(1) (with art. 28(2))

C125Sch. 2 Pt. 2 incorporated (with modifications) (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 25 (with art. 37)

C126Sch. 2 Pt. 2 incorporated (with modifications) (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 21 (with arts. 5, 44)

C127Sch. 2 Pt. 2 incorporated (with modifications) (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 21 (with art. 5)

C129Sch. 2 Pt. 2 incorporated (with modifications) (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 26(b)

C130Sch. 2 Pt. 2 incorporated (with modifications) (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 24 (with art. 5, Sch. 27 para. 36)

C131Sch. 2 Pt. 2 applied (with modifications) (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), s. 64(1), Sch. 7 para. 4(3)(4)

C132Sch. 2 Pt. 2 incorporated (with modifications) (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 24 (with arts. 4, 47)

C133Sch. 2 Pt. 2 incorporated (with modifications) (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 30 (with arts. 15, 50, Sch. 11 para. 29)

C135Sch. 2 Pt. 2 incorporated (with modifications) (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 23 (with arts. 6, 34)

C136Sch. 2 Pts. 2, 3 incorporated (with modifications) (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 26 (with arts. 5, 36)

C138Sch. 2 Pt. 2 incorporated (with modifications) (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 29 (with arts. 62, 76, 87)

C140Sch. 2 Pt. 2 incorporated (with modifications) (8.9.2022) by The Manston Airport Development Consent Order 2022 (S.I. 2022/922), arts. 1, 20 (with arts. 5, 40)

C141Sch. 2 Pt. 2 incorporated (with modifications) (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 25

C143Sch. 2 Pt. 2 incorporated (with modifications) (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 23 (with art. 5)

C144Sch. 2 Pt. 2 incorporated (with modifications) (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 25 (with art. 4)

C145Sch. 2 Pt. 2 incorporated (with modifications) (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 25 (with arts. 4, 50)

C146Sch. 2 Pt. 2 incorporated (with modifications) (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 44 (with art. 19)

C147Sch. 2 Pt. 2 incorporated (with modifications) (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 26 (with arts. 5, 53, Sch. 8 paras. 6, 64)

C149Sch. 2 Pt. 2 incorporated (with modifications) (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 20 (with arts. 6(2), 18, Sch. 11 paras. 5, 30)

C150Sch. 2 Pts. 2, 3 incorporated (with modifications) (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 24 (with arts. 4, 45, Sch. 9 paras. 6, 46, 54(1))

C151Sch. 2 Pts. 2, 3 incorporated (with modifications) (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 21 (with arts. 36, 37, Sch. 9 para. 14, 44(1), 76, 103)

C153Sch. 2 Pts. 2, 3 incorporated (with modifications) (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 28 (with arts. 4, 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)

C154Sch. 2 Pts. 2, 3 incorporated (with modifications) (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 36 (with arts. 42, 43, Sch. 12)

C155Sch. 2 Pts. 2, 3 incorporated (with modifications) (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 47 (with Sch. 11)

C156Sch. 2 Pts. 2, 3 incorporated (with modifications) (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 20 (with arts. 18, 35, Sch. 9)

C158Sch. 2 Pts. 2, 3 incorporated (with modifications) (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 28 (with arts. 21, 41, Sch. 10)

C159Sch. 2 Pt. 2 incorporated (with modifications) (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 28 (with art. 6, Sch. 10)

C160Sch. 2 Pts. 2, 3 incorporated (with modifications) (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 21 (with Sch. 15)

2(1)The acquiring authority shall not be entitled to any mines under the land comprised in the compulsory purchase order unless they have been expressly purchased, and all mines under the land shall be deemed to be excepted out of the conveyance of that land unless expressly named and conveyed.E+W

(2)Sub-paragraph (1) above shall not apply to minerals necessarily extracted or used in the construction of the undertaking.

Part IIIE+W

Modifications etc. (not altering text)

C162Sch. 2 Pts. 2, 3 applied (with modifications) by Dartford-Thurrock Crossing Act 1988 (c. 20, SIF 59), s. 2(5), Sch. 2 Pt. 2 para. 4(1)

Sch. 2 Pt. 3 applied (with modifications) (28.7.1998) by 1998 c. iv, s. 7(1)(2)(with s. 41)

Sch. 2 Pts. 2, 3 applied (with modifications) (3.6.1999) by S.I. 1999/1555, art. 9

Sch. 2 Pt. 3 applied (with modifications) (E.) (29.3.2001) by S.I. 2001/1347, art. 36(1) (with arts. 15, 37, 38(2))

Sch. 2 Pt. 3 applied (with modifications) (E.) (29.3.2001) by S.I. 2001/1348, art. 12(1)

C163Sch. 2 Pt. 3 modified (18.12.1996) by 1996 c. 61, s. 4, Sch. 4 Pt. 3 para. 13

C164Sch. 2 Pt. 3 applied (with modifications) (12.8.2002) by The Channel Tunnel Rail Link (Thames Tunnel Approach) Order 2002 (S.I. 2002/1943), art. 6(2)

Sch. 2 Pt. 3 applied (with modifications) (14.3.2002) by The Chester Guided Busway Order 2002 (S.I. 2002/412), art. 39(1) (with art. 38)

C165Sch. 2 Pt. 3 applied (with modifications) (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 6 para. 17

C166Sch. 2 Pt. 3 applied (with modifications) (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 3 para. 3(5)

C167Sch. 2 Pt. 3 incorporated (with modifications) (7.5.2014) by The National Grid (North London Reinforcement Project) Order 2014 (S.I. 2014/1052), arts. 1, 23

Sch. 2 Pt. 3 incorporated (with modifications) (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), arts. 1, 40

C168Sch. 2 Pt. 3 incorporated (with modifications) (29.10.2014) by The Able Marine Energy Park Development Consent Order 2014 (S.I. 2014/2935), art. 32 (with arts. 30(4), 53)

C169Sch. 2 Pt. 3 incorporated in part (with modifications) (30.12.2015) by The Port Talbot Steelworks Generating Station Order 2015 (S.I. 2015/1984), arts. 1, 14 (with art. 26)

C170Sch. 2 Pt. 3 incorporated in part (with modifications) (9.2.2016) by The National Grid (Hinkley Point C Connection Project) Order 2016 (S.I. 2016/49), arts. 1, 20 (with art. 32)

C171Sch. 2 Pts. 2, 3 incorporated in part (with modifications) (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), arts. 1, 21 (with art. 39)

C174Sch. 2 Pt. 3 incorporated (with modifications) (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), arts. 1, 19 (with art. 22)

C176Sch. 2 Pt. 3 incorporated (with modifications) (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 19

C177Sch. 2 Pt. 3 incorporated (with modifications) (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 33

C178Sch. 2 Pt. 3 incorporated in part (with modifications) (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), arts. 1, 28 (with Sch. 13 Pt. 1 para. 19)

C179Sch. 2 Pt. 3 incorporated (with modifications) (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 24 (with art. 3(1))

C180Sch. 2 Pt. 3 incorporated (with modifications) (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 17 (with art. 7)

C181Sch. 2 Pt. 3 incorporated in part (with modifications) (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 28(1) (with art. 28(2))

C182Sch. 2 Pt. 3 incorporated (with modifications) (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 25 (with art. 37)

C184Sch. 2 Pt. 3 incorporated (with modifications) (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 26(b)

C185Sch. 2 Pt. 3 applied (with modifications) (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), s. 64(1), Sch. 7 para. 4(3)(4)

C187Sch. 2 Pt. 3 incorporated (with modifications) (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 24 (with arts. 4, 47)

C188Sch. 2 Pt. 3 incorporated (with modifications) (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 30 (with arts. 15, 50, Sch. 11 para. 29)

C189Sch. 2 Pt. 3 incorporated (with modifications) (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 29 (with arts. 62, 76, 87)

C192Sch. 2 Pt. 3 incorporated (with modifications) (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 25 (with art. 4)

C193Sch. 2 Pt. 3 incorporated (with modifications) (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 25 (with arts. 4, 50)

C194Sch. 2 Pt. 3 incorporated in part (with modifications) (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 44 (with art. 19)

3(1)If the owner of any underlying mines or minerals desires to work them, he shall give the acquiring authority notice in writing of his intention to do so 30 days before the commencement of working.E+W

(2)On receipt of the notice the acquiring authority may cause the mines to be inspected by a person appointed by them for the purpose.

(3)Subject to paragraph 4(1) below, if the acquiring authority consider that the working of the underlying mines or minerals is likely to damage the undertaking, and is willing to compensate the owner for all or any part of the mines, the owner shall not work or get them.

(4)If the acquiring authority and the owner do not agree on the amount of compensation the question shall be referred to and determined by the [F213Upper Tribunal].

4(1)If before the expiration of 30 days from the receipt of notice under paragraph 3(1) above the acquiring authority do not state their willingness to treat with the owner for the payment of compensation the owner may work any of the underlying mines for which the acquiring authority has not agreed to pay compensation by proper methods and in the usual manner of working such mines in the district in question.E+W

(2)If any damage or obstruction to the undertaking is caused by improper working of the underlying mines—

(a)the owner of the mines shall forthwith repair or remove the damage or obstruction at his own expense,

(b)the acquiring authority may, without waiting for the owner to perform his duty, or in case of his default, repair or remove the damage or obstruction and recover their expenses from the owner in proceedings in the High Court.

Severed minesE+W

5(1)If underlying mines in which any protected minerals are situated extend on both sides of the undertaking, the owner of the mines may cut and make any communication works through the protected minerals required for the ventilation, drainage and working of the mines.E+W

(2)The communication works shall not exceed the dimensions or sections prescribed by the compulsory purchase order, and where dimensions are not so prescribed, they shall not be more than eight feet high and eight feet wide.

(3)The communication works shall not be cut or made on any part of the undertaking, or so as to injure it or impede its use.

(4)In this paragraph—

(a)protected minerals” means mines, measures or strata the working of which is prevented under paragraph 3(3) above,

(b)communication works” means airways, headings, gateways or water levels.

6(1)If underlying mines extend on both sides of the undertaking, the acquiring authority shall from time to time pay to the owner of the mines (in addition to any compensation under paragraph 3 above) any expenses and losses incurred by him in consequence of—E+W

(a)the severance by the undertaking of the land lying over the mines,

(b)the interruption of continuous working of the mines in consequence of paragraph 3(3) above, and

(c)the mines being worked in such manner and subject to such restrictions as not to prejudice or injure the undertaking,

and for any minerals not purchased by the acquiring authority which cannot be obtained by reason of the making and maintenance of the undertaking.

(2)Any dispute as to the amount payable under this paragraph shall be determined by arbitration.

7(1)Where works carried out under paragraph 5 above cause loss or damage to the owner or occupier of land lying over the mines the acquiring authority shall pay full compensation to him for the loss or damage.E+W

(2)This paragraph shall not apply where the person sustaining the loss or damage is the owner of the mines.

Powers of entryE+W

8(1)For the purpose of ascertaining whether underlying mines have been worked so as to damage the undertaking the acquiring authority may, after giving 24 hours notice in writing—E+W

(a)enter on any land in which the mines are, or are thought to be, being worked, and which is in or near to the land where the undertaking is situated, and

(b)enter the mines and any works connected with the mines.

(2)For the said purpose the acquiring authority may make use of any apparatus or machinery belonging to the owner of the mines, and may use all necessary means for discovering the distance from the undertaking to the parts of the mines which are, or are about to be, worked.

(3)If the owner of the mines refuses to allow a person appointed by the acquiring authority for the purpose to enter the mines or works under this paragraph he shall be liable on summary conviction to a sum not exceeding £50.

Remedial worksE+W

9(1)If it appears that mines have been worked contrary to the provisions of this Schedule, the acquiring authority may give notice to the owner of the mines to construct such works and adopt such means as may be necessary or proper for making safe the undertaking, and preventing injury to it.E+W

(2)If the owner of the mines does not comply with the notice, the acquiring authority may themselves construct the works, and may recover their expenses from the owner by proceedings in the High Court.

Section 15A

[F214Schedule 2AE+WEnactments eligible for directions applying section 14A of the Land Compensation Act 1961

Textual Amendments

F214Sch. 2A inserted (31.3.2024 for W. for specified purposes, 30.4.2024 for E.) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 190(1)(d), 255(7) (with s. 247); S.I. 2024/92, reg. 4 (with reg. 6(6)); S.I. 2024/389, reg. 2(l)

Enactments authorising acquisitions for purposes including housingE+W

1Section 21A(1)(c) and (2)(c) of the Welsh Development Agency Act 1975 (acquisition by Welsh Ministers of land in England for Welsh development purposes).

2Section 142 of the Local Government, Planning and Land Act 1980 (acquisition by urban development corporation).

3Section 17 of the Housing Act 1985 (acquisition by local housing authority).

4Section 226 of the Town and Country Planning Act 1990 (acquisition by local authority for development or planning purposes).

5Section 333ZA of the Greater London Authority Act 1999 (acquisition by Greater London Authority for housing or regeneration purposes).

6Section 9 of the Housing and Regeneration Act 2008 (acquisition by the Homes and Communities Agency).

7Section 207 of the Localism Act 2011 (acquisition by mayoral development corporation).

Enactments authorising acquisitions for purposes of the NHSE+W

8Paragraph 46 of Schedule 4 to the Health and Social Care (Community Health and Standards) Act 2003 (acquisition by NHS foundation trust).

9Paragraph 27 of Schedule 4 to the National Health Service Act 2006 (acquisition by NHS trust).

10In the National Health Service (Wales) Act 2006—

(a)paragraph 20 of Schedule 2 (acquisition by local health board);

(b)paragraph 27 of Schedule 3 (acquisition by NHS trust).

Enactment authorising acquisitions for educational purposesE+W

11Section 530 of the Education Act 1996 (acquisition by local authority for purposes of educational institution or function).]

Section 28.

SCHEDULE 3E+W Acquisition of Rights over Land by the Creation of New Rights

Modifications etc. (not altering text)

C202Schedule 3 applied (1.12.1991) by Water Industry Act 1991 (c. 56, SIF 130), ss. 155(4), 223(2) (with saving in s. 188 and with ss. 82(3), 186(1), 222(1), Sch. 14 para. 6)

Schedule 3 applied (with modifications) (1.12.1991) by Water Industry Act 1991 (c. 56, SIF 130), ss. 167, 223(2), Sch. 11 para. 6(1)(b) (with ss. 82(3), 186(1), 222(1), Sch. 14 para. 6)

Schedule 3 applied (with modifications) (1.12.1991) by Water Resources Act 1991 (c. 57, SIF 130), ss. 154(4), 225(2) (with saving in s. 182 and with ss. 16(6), 179, 222(3), Sch. 22 para. 1, Sch. 23 para. 6)

Schedule 3 applied (with modifications) (1.12.1991) by Water Resources Act 1991 (c. 57, SIF 130), ss. 168, 225(2), Sch. 19, para. 6(1)(b) (with ss. 16(6), 179, 222(3), Sch. 22 para. 1, Sch. 23 para. 6)

Schedule 3 applied (with modifications) (10.11.1993) by 1993 c. 28, ss. 162(5), 169, Sch. 20 Pt. I; S.I. 1993/2762, art. 3.

Sch. 3 applied (18.12.1996) by 1996 c. 61, s. 5(4)

Sch. 3 extended (26.3.2001) by 2000 c. 26, s. 95, Sch. 5, Pt. II para. 4(2); S.I. 2000/2957, art. 2(3), Sch. 3

C203Sch. 3 applied (22.7.2008) by Crossrail Act 2008 (c. 18), s. 7(6)

C204Sch. 3 applied (with modifications) (1.12.2008) by Housing and Regeneration Act 2008 (c. 17), s. 325(1), Sch. 2 para. 2; S.I. 2008/3068, art. 2(1)(d) (with arts. 6-13)

Part I E+W

1U.K.In this Schedule “right” means a right to which section 28(1) of this Act applies, or any right to which this Schedule is applied by any Act passed after this Act.

General modificationsE+W

2(1)This Act shall have effect with the modifications necessary to make it apply to the compulsory acquisition of a right as it applies to the compulsory acquisition of land, so that, in appropriate contexts, references in this Act to land are read as referring, or as including references, to the right acquired or to be acquired, or to land over which the right is, or is to be, exercisable, according to the requirements of the particular context.E+W

(2)Without prejudice to the generality of sub-paragraph (1) above, Part II of this Schedule shall apply to the compulsory acquisition of a right in substitution for Part III of this Act.

Part II E+W Acquisition of New Rights Over Special Kinds of Land

Statutory undertakers landE+W

3(1)This paragraph applies where the land over which a right is to be acquired by virtue of a compulsory purchase order includes land which has been acquired by statutory undertakers for the purposes of their undertaking and on a representation made to the appropriate Minister before the expiration of the time within which objections to the order can be made he is satisfied—E+W

(a)that any of the said land is used for the purposes of the carrying on of their undertaking, or

(b)that an interest in any of the said land is held for those purposes.

[F215and the representation is not withdrawn.]

(2)The compulsory purchase order shall not be confirmed or made so as to authorise the compulsory purchase of a right over any land as to which the appropriate Minister is satisfied as aforesaid except land as to which he is satisfied that its nature and situation are such—

(a)that the right can be purchased without serious detriment to the carrying on of the undertaking, or

(b)that any detriment to the carrying on of the undertaking, in consequence of the acquisition of the right, can be made good by the undertakers by the use of other land belonging to or available for acquisition by them,

and certifies accordingly.

Textual Amendments

Modifications etc. (not altering text)

Orders subject to special parliamentary procedureE+W

Local authority and statutory undertakers’ landE+W

4(1)This paragraph applies to land which—E+W

(a)is the property of a local authority, or

(b)has been acquired by statutory undertakers, who are not a local authority, for the purposes of their undertaking.

(2)Subject to sub-paragraph (3) below, a compulsory purchase order shall, in so far as it authorises the compulsory purchase of rights over land to which this paragraph applies, be subject to special parliamentary procedure in any case where an objection to [F216the compulsory purchase of the rights] has been made by the local authority, or as the case may be the statutory undertakers, and has not been withdrawn.

(3)Sub-paragraph (2) above shall not apply to the compulsory acquisition of an interest in land where the person acquiring the interest is a local authority (as defined in sub-paragraph (4) below), [F217an urban development corporation][F218, a Mayoral development corporation]F219[F220...,]. . . F221. . ., [F222a Welsh planning board,]any statutory undertakers or a Minister.

(4)In sub-paragraph (3) above—

  • local authority” means—

    (a)

    in relation to England, the council of a county or district, the council of a London borough, the Common Council of the City of London and the Greater London Council,

    (b)

    in relation to Wales, the council of a county or [F223county borough],

and this definition applies to the Isles of Scilly as if the Council of those Isles were the council of a county;

  • statutory undertakers” has the same meaning as in section 17(3) of this Act.

  • [F224a Welsh planning board” means a board constituted under—

    (a)

    section 2(1B) of the Town and Country Planning Act 1990; F225. . .

    (b)

    F225. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .]

Textual Amendments

F216Words in Sch. 3 para. 4(2) substituted (25.6.2013) by Growth and Infrastructure Act 2013 (c. 27), ss. 25(7)(b), 35(1); S.I. 2013/1488, art. 3(e) (with art. 8(3))

F217Words in Sch. 3, para. 4(3) inserted (25.09.1991) by Planning and Compensation Act 1991 (c. 34, SIF 28:1), s. 70, Sch. 15, para. 11; S.I. 1991/2067, art. 3.

F218Words in Sch. 3 para. 4(3) inserted (15.1.2012) by Localism Act 2011 (c. 20), s. 240(1)(l), Sch. 22 para. 7(4)

F220Words in Sch. 3 para. 4(3) inserted (1.10.1998) by 1998 c. 38, s. 128, Sch. 14 Pt. II para. 20 (with ss. 139(2), 143(2)); S.I. 1998/2244, art. 4

F221Words in Sch. 3 para. 4(3) repealed (1.4.1997) by 1995 c. 25, s. 120, Sch.