SCHEDULE 1Additional works in Wolverhampton

Part IDescription of works [Section 4 (a).] specifically authorised

In the Metropolitan Borough of Wolverhampton—

Part IIDescription of [Section 4 (b).] further works and powers

In the Metropolitan Borough of Wolverhampton—

(a)

Set back the footway and kerbline on the southern side of Darlington Street and the eastern side of School Street at the junction of those streets, and raise the level of the surface of those streets at that junction, between the points marked A1 and A2 on the deposited plans;

(b)

Set back the kerbline on the western side of School Street between the points marked A3 and A4 on the deposited plans;

(c)

Set back the kerbline on the northern side of Darlington Street at its junctions with Red Lion Street and Waterloo Road between the points marked A5 and A6 on the deposited plans;

(d)

Set back the kerbline on the eastern side of School Street and the northern side of Cleveland Street at the junction of those streets between the points marked A7 and A8 on the deposited plans;

(e)

Stop up and discontinue the pedestrian subway under School Street at its junction with Cleveland Street and Salop Street between the points marked A9 and A10 on the deposited plans;

(f)

Set back the kerbline on the northern side of Cleveland Street between the points marked A11 and A12 on the deposited plans.

SCHEDULE 2Additional works in Dudley

Part IDescription of works [Section 5 (a).] specifically authorised

Note: In the following descriptions—

In the Metropolitan Borough of Dudley—

Part IIDescription of [Section 5 (b).] further works and powers

In the Metropolitan Borough of Dudley—

(a)

Repair and refurbishment of the existing Parkhead viaduct;

(b)

Stop up and discontinue the footpath between Pedmore Road and Cochrane Road between the points marked B1 and B2 on the deposited plans and remove the existing stairway between those points, substituting therefor a new footpath and stairway between the points so marked B2 and B3.

SCHEDULE 3Substituted works in Birmingham

Part IDescription of works [Section 6 (1) (a).] specifically authorised

In the City of Birmingham—

Part IIDescription [Section 6 (1) (b).] of further works and powers

In the City of Birmingham—

(a)

Stop up and discontinue so much of the footpath between Common Lane and a bridge over the River Tame west of Bromford Lane on the southern side of the existing Birmingham and Derby Railway as lies between the points marked C1 and C4 on the deposited plans, substituting therefor a new footpath between the points so marked C1, C3 and C4 in conjunction with the new service road referred to in paragraph (b) below between the points so marked C3 and C5;

(b)

Stop up and discontinue so much of the service road on the southern side of that railway as lies between the points marked C3 and C5, substituting therefor a new service road between those points;

(c)

Stop up and discontinue so much of the footpath between the bridge over the River Tame west of Bromford Lane and that street on the southern side of the existing Birmingham and Derby Railway as lies between the points marked C6 and C7 on the deposited plans, substituting therefor a new footpath between those points.

Part IIIAuthorised [Section 6 (2).] works and powers replaced by Works Nos. 5 and 5A and related powers

In the City of Birmingham—

(a)

So much of the Works Nos. 25 and 26 authorised by the No. 1 Act of 1992 as lies between the points of commencement and termination of Work No. 5 authorised by this Act, being the part of the said Work No. 25 from chainage 968 to its termination and the part of the said Work No. 26 from its commencement to chainage 1,300;

(b)

So much of the Work No. 25A authorised by the No. 1 Act of 1992 as lies between its point of commencement and the point of termination of Work No. 5A authorised by this Act, being the part of the said Work No. 25A from its commencement to chainage 716; and

(c)

The further powers authorised by section 5 (1) (a) of the No. 1 Act of 1992 and paragraph (1) (c) of Part II of Schedule 2 to that Act (stopping up and diversion of footpath on southern side of the Birmingham and Derby Railway).

SCHEDULE 4Substituted works in Dudley, Sandwell and Wolverhampton

Part IDescription of [Section 7 (1) (a).] works specifically authorised

Note: In the following descriptions—

In the Metropolitan Borough of Wolverhampton—

In the Metropolitan Borough of Sandwell—

In the Metropolitan Boroughs of Dudley and Sandwell—

Part IIDescription of further [Section 7 (1) (b).] works and powers

In the Metropolitan Borough of Wolverhampton—

(a)

Stop up and discontinue so much of the footpath between Sun Street and Freeman Street as lies between the points marked E1 and E4 on the deposited plans, including the pedestrian subway passing under the existing Wednesfield Depot branch siding between the points marked E2 and E3 on the deposited plans, substituting therefor a new footpath between the points so marked E1 and E4 passing on the western side of Work No. 7 under the bridge carrying Work No. 7A thereover;

In the Metropolitan Borough of Sandwell—

(b)

Stop up and discontinue the spur road on the south-western side of Holyhead Road between the points marked F1 and F2 on the deposited plans.

Part IIIAuthorised works and powers replaced by [Section 7 (2).] Works Nos. 8 and 9 andrelated powers

In the Metropolitan Borough of Sandwell—

(a)

So much of the Works Nos. 10, 11 and 12 authorised by the No. 1 Act of 1992 as lies between the points of commencement and termination of Work No. 8 authorised by this Act, being the part of the said Work No. 10 from chainage 1,816 to its termination, the whole of the said Work No. 11 and the part of the said Work No. 12 from its commencement to chainage 328;

(b)

The Work No. 12A authorised by the No. 1 Act of 1992;

(c)

The powers authorised by section 5 (1) (a) of the No. 1 Act of 1992 and the following provisions of Part II of Schedule 1 to that Act, namely:—

(i)

paragraph (5) (a) (stopping up of spur road off Holyhead Road); and

(ii)

paragraph (5) (b) (stopping up of part of Potters Lane); and

In the Metropolitan Borough of Dudley—

(d)

The bridge over Birmingham New Road forming part of the Work No. 15A authorised by the No. 1 Act of 1992.

Part IVAuthorised works and powers replaced [Section 7 (3).] by Works Nos. 7, 7A and 7B and related powers

In the Metropolitan Borough of Wolverhampton—

(a)

So much of the Works Nos. 1 and 2 authorised by the No. 1 Act of 1992 as lies between the points of commencement and termination of Work No. 7 authorised by this Act, being the part of the said Work No. 1 from chainage 683 to its termination and the part of the said Work No. 2 from its commencement to chainage 1,088; and

(b)

The powers conferred by section 5 (1) (a) of the No. 1 Act of 1992 and paragraph (1) (c) of Part II of Schedule 1 to that Act (stopping up and discontinuance of part of the footpath between Sun Street and Freeman Street).

Section 9.

SCHEDULE 5Railway [Incorporation or application of enactments.] crossings in highways

In the Metropolitan Borough of Wolverhampton—

In the Metropolitan Borough of Sandwell—Potters Lane at its junction with Victoria Street and Great Western Street

In the Metropolitan Borough of Dudley—Campbell StreetConstitution HillNew RoadCottage Street.

Sections 13 (1) (d) and 14.

SCHEDULE 6Additional land which may be acquired or used

PurposeLocationLands numbered on deposited plans
(1)(2)(3)
In the Metropolitan Borough of Dudley
For the provision of a working site for construction purposes and accessNew Road and adjoining land, South Dudley15, 16 and 19.
For the provision of a working site for construction purposes and accessShaw Road and adjoining land, South Dudley22 to 24.
For the provision of a working site for construction purposesBlowers Green Road and Cinder Bank and adjoining land, South Dudley26, 28 and 29.
For the provision of a working site for construction purposesThornleigh Trading Estate, South Dudley30.
For the provision of a working site for construction purposes and accessLand adjoining Buxton Road, South Dudley35.
For the provision of a working site for construction purposes and accessPedmore Road and adjoining land, South Dudley36 and 37.
For the provision of access for construction purposesPedmore Road and adjoining land, South Dudley35 and 37.
For the provision of a working site for construction purposes and accessCanal Street and adjoining land and Pensnett Canal, North Brierley Hill48, 49 and 51.
For the provision of a working site for construction purposes and accessLand adjoining Dudley Road, North Brierley Hill52 and 53.
For the provision of a working site for construction purposesLevel Street and adjoining land, Brierley Hill55a and 58a.
For the provision of a working site for construction purposesCottage Street and land between that street and Level Street, Brierley Hill59 and 61.
In the Metropolitan Borough of Sandwell
For the provision of a working site for construction purposes and accessLand adjoining Holyhead Road and Portway Road, Wednesbury1 and 2.