Heathrow Express Railway Act 1991

27Temporary use of further land and access by Board

(1)In this section—

  • “the designated lands” means the Hanger Lane land or the Haven Green land, as the case may be;

  • “the Hanger Lane land” means the lands numbered on the deposited plans 4 and 5 in the London borough of Ealing, situate within the lines marked “Limit of temporary working site” and required by the Board in connection with the construction of Work No. 10; and

  • “the Haven Green land” means the land numbered on the deposited plans 1 in the London borough of Ealing, situate within the line marked “Limit of temporary working site” and required by the Board in connection with the reconstruction under their existing powers of the bridge carrying Haven Green and Spring Bridge Road over the railway between Paddington and Reading.

(2)The Board, after giving to the owners and occupiers of the designated lands not less than 28 days' previous notice in writing, may—

(a)(i)enter upon and take possession temporarily of the designated lands for the purpose of temporary working sites;

(ii)construct on the designated lands such temporary works or structures as may be required by them; and

(iii)remove any structures and vegetation (other than any trees) on the designated lands; and

(b)form and lay out means of temporary access—

(i)to and from Haven Green at point “A1”; and

(ii)to and from Hamilton Road at points “A2” and “A3”.