Heathrow Express Railway Act 1991

25Temporary use of land by Company

(1)In this section“the designated lands” means the land numbered on the deposited plans 75a in the London borough of Hillingdon and so much of the lands numbered on the deposited plans—

(a)90 in the London borough of Hillingdon;

(b)146 in the London borough of Hillingdon;

(c)5 in the borough of Spelthorne;

(d)17 in the borough of Spelthorne and 165 in the London borough of Hillingdon;

as lies within the lines marked “Limit of temporary working site” on the deposited plans.

(2)The Company, in connection with the construction of their works and after giving to the owners and occupiers of the designated lands not less than 28 days' previous notice in writing, may—

(a)enter upon and take possession temporarily of the designated lands for the purpose of temporary working sites;

(b)construct on the designated lands such temporary works or structures as may be required by them; and

(c)remove any structures and vegetation on the designated lands.