Search Legislation

Directive 97/23/EC of the European Parliament and of the Council (repealed)Show full title

Directive 97/23/EC of the European Parliament and of the Council of 29 May 1997 on the approximation of the laws of the Member States concerning pressure equipment (repealed)

 Help about what version

What Version

Close

This is a legislation item that originated from the EU

After exit day there will be three versions of this legislation to consult for different purposes. The legislation.gov.uk version is the version that applies in the UK. The EU Version currently on EUR-lex is the version that currently applies in the EU i.e you may need this if you operate a business in the EU.

The web archive version is the official version of this legislation item as it stood on exit day before being published to legislation.gov.uk and any subsequent UK changes and effects applied. The web archive also captured associated case law and other language formats from EUR-Lex.

Status:

EU Directives are being published on this site to aid cross referencing from UK legislation. After IP completion day (31 December 2020 11pm) no further amendments will be applied to this version.

  1. Introductory Text

  2. Article 1.Scope and definitions

  3. Article 2.Market surveillance

  4. Article 3.Technical requirements

  5. Article 4.Free movement

  6. Article 5.Presumption of conformity

  7. Article 6.Committee on technical standards and regulations

  8. Article 7.Committee on Pressure Equipment

  9. Article 8.Safeguard clause

  10. Article 9.Classification of pressure equipment

  11. Article 10.Conformity assessment

  12. Article 11.European approval for materials

  13. Article 12.Notified bodies

  14. Article 13.Recognized third-party organizations

  15. Article 14.User inspectorates

  16. Article 15.CE marking

  17. Article 16.Unduly affixed CE marking

  18. Article 17.. . . . . . . . . ....

  19. Article 18.Decisions entailing refusal or restriction

  20. Article 19.Repeal

  21. Article 20.Transposition and transitional provisions

  22. Article 21.Addressees of the Directive

    1. ANNEX I

      ESSENTIAL SAFETY REQUIREMENTS

      1. PRELIMINARY OBSERVATIONS

        1. 1. . . . . . . . . . ....

        2. 2. . . . . . . . . . ....

        3. 3. . . . . . . . . . ....

        4. 4. . . . . . . . . . ....

        5. 1. GENERAL

          1. 1.1. . . . . . . . . . ....

          2. 1.2. . . . . . . . . . ....

          3. 1.3. . . . . . . . . . ....

        6. 2. DESIGN

          1. 2.1. General

          2. 2.2. Design for adequate strength

            1. 2.2.1. . . . . . . . . . ....

            2. 2.2.2. . . . . . . . . . ....

            3. 2.2.3. Calculation method

              1. (a) Pressure containment and other loading aspects

              2. (b) Resistance

              3. (c) Stability aspects

            4. 2.2.4. Experimental design method

          3. 2.3. Provisions to ensure safe handling and operation

          4. 2.4. Means of examination

          5. 2.5. Means of draining and venting

          6. 2.6. Corrosion or other chemical attack

          7. 2.7. Wear

          8. 2.8. Assemblies

          9. 2.9. Provisions for filling and discharge

          10. 2.10. Protection against exceeding the allowable limits of pressure equipment

          11. 2.11. Safety accessories

            1. 2.11.1. Safety accessories must:

            2. 2.11.2. Pressure limiting devices

            3. 2.11.3. Temperature monitoring devices

          12. 2.12. External fire

        7. 3. MANUFACTURING

          1. 3.1. Manufacturing procedures

            1. 3.1.1. Preparation of the component parts

            2. 3.1.2. Permanent joining

            3. 3.1.3. Non-destructive tests

            4. 3.1.4. Heat treatment

            5. 3.1.5. Traceability

          2. 3.2. Final assessment

            1. 3.2.1. Final inspection

            2. 3.2.2. Proof test

            3. 3.2.3. Inspection of safety devices

          3. 3.3. Marking and labelling

          4. 3.4. Operating instructions

        8. 4. MATERIALS

          1. 4.1. . . . . . . . . . ....

          2. 4.2. . . . . . . . . . ....

          3. 4.3. . . . . . . . . . ....

      2. SPECIFIC PRESSURE EQUIPMENT REQUIREMENTS

        1. 5. FIRED OR OTHERWISE HEATED PRESSURE EQUIPMENT WITH A RISK OF...

        2. 6. PIPING AS REFERRED TO IN ARTICLE 3, SECTION 1.3

        3. 7. SPECIFIC QUANTITATIVE REQUIREMENTS FOR CERTAIN PRESSURE EQUIPMENT

          1. 7.1. Allowable stresses

            1. 7.1.1. Symbols

            2. 7.1.2. . . . . . . . . . ....

          2. 7.2. Joint coefficients

          3. 7.3. Pressure limiting devices, particularly for pressure vessels

          4. 7.4. Hydrostatic test pressure

          5. 7.5. Material characteristics

    2. ANNEX II

      CONFORMITY ASSESSMENT TABLES

      1. 1. . . . . . . . . . ....

      2. 2. . . . . . . . . . ....

      3. 3. . . . . . . . . . ....

      4. 4. . . . . . . . . . ....

    3. ANNEX III

      CONFORMITY ASSESSMENT PROCEDURES

      1. . . . . . . . . . ....

      2. Module A (internal production control)

        1. 1. . . . . . . . . . ....

        2. 2. . . . . . . . . . ....

        3. 3. . . . . . . . . . ....

        4. 4. . . . . . . . . . ....

        5. 5. . . . . . . . . . ....

      3. Module A1 (internal manufacturing checks with monitoring of the final...

      4. Module B (EC type-examination)

        1. 1. . . . . . . . . . ....

        2. 2. . . . . . . . . . ....

        3. 3. . . . . . . . . . ....

        4. 4. . . . . . . . . . ....

          1. 4.1. . . . . . . . . . ....

          2. 4.2. . . . . . . . . . ....

          3. 4.3. . . . . . . . . . ....

          4. 4.4. . . . . . . . . . ....

        5. 5. . . . . . . . . . ....

        6. 6. . . . . . . . . . ....

        7. 7. . . . . . . . . . ....

        8. 8. . . . . . . . . . ....

        9. 9. . . . . . . . . . ....

      5. Module B1 (EC design-examination)

        1. 1. . . . . . . . . . ....

        2. 2. . . . . . . . . . ....

        3. 3. . . . . . . . . . ....

        4. 4. . . . . . . . . . ....

          1. 4.1. . . . . . . . . . ....

          2. 4.2. . . . . . . . . . ....

          3. 4.3. . . . . . . . . . ....

        5. 5. . . . . . . . . . ....

        6. 6. . . . . . . . . . ....

        7. 7. . . . . . . . . . ....

        8. 8. . . . . . . . . . ....

        9. 9. . . . . . . . . . ....

      6. Module C1 (conformity to type)

        1. 1. . . . . . . . . . ....

        2. 2. . . . . . . . . . ....

        3. 3. . . . . . . . . . ....

        4. 4. . . . . . . . . . ....

      7. Module D (production quality assurance)

        1. 1. . . . . . . . . . ....

        2. 2. . . . . . . . . . ....

        3. 3. Quality system

          1. 3.1. . . . . . . . . . ....

          2. 3.2. . . . . . . . . . ....

          3. 3.3. . . . . . . . . . ....

          4. 3.4. . . . . . . . . . ....

        4. 4. Surveillance under the responsibility of the notified body

          1. 4.1. . . . . . . . . . ....

          2. 4.2. . . . . . . . . . ....

          3. 4.3. . . . . . . . . . ....

          4. 4.4. . . . . . . . . . ....

        5. 5. . . . . . . . . . ....

        6. 6. . . . . . . . . . ....

      8. Module D1 (production quality assurance)

        1. 1. . . . . . . . . . ....

        2. 2. The manufacturer must draw up the technical documentation described below....

        3. 3. . . . . . . . . . ....

        4. 4. Quality system

          1. 4.1. . . . . . . . . . ....

          2. 4.2. . . . . . . . . . ....

          3. 4.3. . . . . . . . . . ....

          4. 4.4. . . . . . . . . . ....

        5. 5. Surveillance under the responsibility of the notified body

          1. 5.1. . . . . . . . . . ....

          2. 5.2. . . . . . . . . . ....

          3. 5.3. . . . . . . . . . ....

          4. 5.4. . . . . . . . . . ....

        6. 6. . . . . . . . . . ....

        7. 7. . . . . . . . . . ....

      9. Module E (product quality assurance)

        1. 1. . . . . . . . . . ....

        2. 2. . . . . . . . . . ....

        3. 3. Quality system

          1. 3.1. . . . . . . . . . ....

          2. 3.2. . . . . . . . . . ....

          3. 3.3. . . . . . . . . . ....

          4. 3.4. . . . . . . . . . ....

        4. 4. Surveillance under the responsibility of the notified body

          1. 4.1. . . . . . . . . . ....

          2. 4.2. . . . . . . . . . ....

          3. 4.3. . . . . . . . . . ....

          4. 4.4. . . . . . . . . . ....

        5. 5. . . . . . . . . . ....

        6. 6. . . . . . . . . . ....

      10. Module E1 (product quality assurance)

        1. 1. . . . . . . . . . ....

        2. 2. The manufacturer must draw up the technical documentation described below....

        3. 3. . . . . . . . . . ....

        4. 4. Quality system

          1. 4.1. . . . . . . . . . ....

          2. 4.2. . . . . . . . . . ....

          3. 4.3. . . . . . . . . . ....

          4. 4.4. . . . . . . . . . ....

        5. 5. Surveillance under the responsibility of the notified body

          1. 5.1. . . . . . . . . . ....

          2. 5.2. . . . . . . . . . ....

          3. 5.3. . . . . . . . . . ....

          4. 5.4. . . . . . . . . . ....

        6. 6. . . . . . . . . . ....

        7. 7. . . . . . . . . . ....

      11. Module F (product verification)

        1. 1. . . . . . . . . . ....

        2. 2. . . . . . . . . . ....

        3. 3. . . . . . . . . . ....

        4. 4. Verification by examination and testing of each item of pressure...

          1. 4.1. . . . . . . . . . ....

          2. 4.2. . . . . . . . . . ....

          3. 4.3. . . . . . . . . . ....

      12. Module G (EC unit verification)

        1. 1. . . . . . . . . . ....

        2. 2. . . . . . . . . . ....

        3. 3. . . . . . . . . . ....

        4. 4. . . . . . . . . . ....

          1. 4.1. . . . . . . . . . ....

          2. 4.2. . . . . . . . . . ....

      13. Module H (full quality assurance)

        1. 1. . . . . . . . . . ....

        2. 2. . . . . . . . . . ....

        3. 3. Quality system

          1. 3.1. . . . . . . . . . ....

          2. 3.2. . . . . . . . . . ....

          3. 3.3. . . . . . . . . . ....

          4. 3.4. . . . . . . . . . ....

        4. 4. Surveillance under the responsibility of the notified body

          1. 4.1. . . . . . . . . . ....

          2. 4.2. . . . . . . . . . ....

          3. 4.3. . . . . . . . . . ....

          4. 4.4. . . . . . . . . . ....

        5. 5. . . . . . . . . . ....

        6. 6. . . . . . . . . . ....

      14. Module H1 (full quality assurance with design examination and special...

        1. 1. . . . . . . . . . ....

        2. 2. . . . . . . . . . ....

    4. ANNEX IV

      MINIMUM CRITERIA TO BE MET WHEN DESIGNATING THE NOTIFIED BODIES REFERRED TO IN ARTICLE 12 AND THE RECOGNIZED THIRD-PARTY ORGANIZATIONS REFERRED TO IN ARTICLE 13

      1. 1. . . . . . . . . . ....

      2. 2. . . . . . . . . . ....

      3. 3. . . . . . . . . . ....

      4. 4. . . . . . . . . . ....

      5. 5. . . . . . . . . . ....

      6. 6. . . . . . . . . . ....

      7. 7. . . . . . . . . . ....

    5. ANNEX V

      CRITERIA TO BE MET WHEN AUTHORIZING USER INSPECTORATES REFERRED TO IN ARTICLE 14

      1. 1. . . . . . . . . . ....

      2. 2. . . . . . . . . . ....

      3. 3. . . . . . . . . . ....

      4. 4. . . . . . . . . . ....

      5. 5. . . . . . . . . . ....

      6. 6. . . . . . . . . . ....

      7. 7. . . . . . . . . . ....

    6. ANNEX VI

      CE MARKING

      1. . . . . . . . . . ....

      2. . . . . . . . . . ....

      3. . . . . . . . . . ....

      4. . . . . . . . . . ....

    7. ANNEX VII

      DECLARATION OF CONFORMITY

      1. . . . . . . . . . ....

      2. . . . . . . . . . ....

Back to top

Options/Help

Print Options

You have chosen to open the Whole Directive

The Whole Directive you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources