Commission Regulation (EU) 2017/459 of 16 March 2017 establishing a network code on capacity allocation mechanisms in gas transmission systems and repealing Regulation (EU) No 984/2013 (Text with EEA relevance)
Pan adawodd y DU yr UE, cyhoeddodd legislation.gov.uk ddeddfwriaeth yr UE a gyhoeddwyd gan yr UE hyd at ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.). Ar legislation.gov.uk, mae'r eitemau hyn o ddeddfwriaeth yn cael eu diweddaru'n gyson ag unrhyw ddiwygiadau a wnaed gan y DU ers hynny.
Mae legislation.gov.uk yn cyhoeddi fersiwn y DU. Mae EUR-Lex yn cyhoeddi fersiwn yr UE. Mae Archif Gwe Ymadael â’r UE yn rhoi cipolwg ar fersiwn EUR-Lex o ddiwrnod cwblhau’r cyfnod gweithredu (31 Rhagfyr 2020 11.00 p.m.).
There are currently no known outstanding effects by UK legislation for Commission Regulation (EU) 2017/459, Article 6.![]()
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
1.The maximum technical capacity shall be made available to network users, taking into account system integrity, safety and efficient network operation.
(a)In order to maximise the offer of bundled capacity through the optimisation of the technical capacity transmission system operators shall take the following measures at interconnection points, giving priority to those interconnection points where there is contractual congestion pursuant to point 2.2.3(1) of Annex I to Regulation (EC) No 715/2009: the transmission system operators shall establish and apply a joint method, setting out the specific steps to be taken by the respective transmission system operators to achieve the required optimisation:
the joint method shall include an in-depth analysis of the technical capacities, including any discrepancies therein on both sides of an interconnection point, as well as the specific actions and detailed timetable — including possible implications and containing the regulatory approvals required to recover costs and adjust the regulatory regime — necessary to maximise the offer of bundled capacity. Such specific actions shall not be detrimental to the offer of capacity at other relevant points of the concerned systems and points to distribution networks relevant for security of supply to final customers, such as those to storage facilities, LNG terminals and protected customers as defined in [F1Regulation (EU) No. 2017/1938] of the European Parliament and of the Council;
the calculation methodology and the rules of making available the capacity, adopted by the transmission system operators, shall address specific situations where competing capacities across systems involve interconnection points and exit points to storage facilities;
this in-depth analysis shall take into account assumptions made in F2... national investment plans, relevant obligations under the applicable national laws and any relevant contractual obligations;
the relevant transmission system operators shall apply a dynamic approach to re-calculating technical capacity, where appropriate in conjunction with the dynamic calculation applied for additional capacity on the basis of point 2.2.2.2 of Annex I to Regulation (EC) No 715/2009, jointly identifying the appropriate frequency for re-calculation per interconnection point and having regard to the particular specificities thereof;
in the joint method, F3... transmission system operators [F4and non-UK TSOs] shall consult other transmission system operators specifically affected by the interconnection point;
transmission system operators shall have regard to information that network users [F5or the holder of a licence under section 7AA of the Gas Act 1986] may provide with regard to expected future flows when re-calculating the technical capacity.
[F6this in-depth analysis must also take into account any obligations of a non-UK TSO in relation to the Union-wide 10-year network development plan pursuant to Article 8 of Regulation (EC) No 715/2009 as it has effect in EU law.]
(b)the transmission system operators shall jointly assess at least the following parameters and where appropriate adjust them:
pressure commitments;
all relevant demand and supply scenarios [F7having regard to any information provided by the holder of a licence under section 7AA of the Gas Act 1986], including details on reference climatic conditions and network configurations associated with extreme scenarios;
calorific value.
[F81A.In relation to interconnection points at which any adjacent TSO is a non-UK TSO, transmission system operators must comply with paragraph 1 in so far as they are able to do so and must endeavour to cooperate with the non-UK TSO to comply with paragraph 1.]
2.Where the optimisation of technical capacity causes costs to the transmission system operators, particularly costs that unevenly impact transmission system operators on either side of an interconnection point, transmission system operators shall be allowed to recover such efficiently incurred costs via the regulatory framework established by the relevant regulatory authorities in accordance with Article 13 of Regulation (EC) No 715/2009 F9....
3.Where appropriate, national regulatory authorities shall consult network users on the applied calculation method and joint approach.
F104.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F1Words in Art. 6(1)(a)(1) substituted (31.12.2020) by The Gas (Security of Supply and Network Codes) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/531), reg. 1(2), Sch. 4 para. 6(2); 2020 c. 1, Sch. 5 para. 1(1)
F2Words in Art. 6(1)(a)(3) omitted (31.12.2020) by virtue of The Gas (Security of Supply and Network Codes) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/531), reg. 1(2), Sch. 4 para. 6(3); 2020 c. 1, Sch. 5 para. 1(1)
F3Word in Art. 6(1)(a)(5) omitted (31.12.2020) by virtue of The Gas (Security of Supply and Network Codes) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/531), reg. 1(2), Sch. 4 para. 6(4)(a); 2020 c. 1, Sch. 5 para. 1(1)
F4Words in Art. 6(1)(a)(5) inserted (31.12.2020) by The Gas (Security of Supply and Network Codes) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/531), reg. 1(2), Sch. 4 para. 6(4)(b); 2020 c. 1, Sch. 5 para. 1(1)
F5Words in Art. 6(1)(a)(6) inserted (1.10.2024) by The Energy Act 2023 (Consequential Amendments) Regulations 2024 (S.I. 2024/706), regs. 1(1), 43(a); S.I. 2024/957, reg. 2(a)
F6Art. 6(1)(a)(7) inserted (31.12.2020) by The Gas (Security of Supply and Network Codes) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/531), reg. 1(2), Sch. 4 para. 6(5); 2020 c. 1, Sch. 5 para. 1(1)
F7Words in Art. 6(1)(b)(2) inserted (1.10.2024) by The Energy Act 2023 (Consequential Amendments) Regulations 2024 (S.I. 2024/706), regs. 1(1), 43(b); S.I. 2024/957, reg. 2(a)
F8Art. 6(1A) inserted (31.12.2020) by The Gas (Security of Supply and Network Codes) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/531), reg. 1(2), Sch. 4 para. 6(6); 2020 c. 1, Sch. 5 para. 1(1)
F9Words in Art. 6(2) omitted (31.12.2020) by virtue of The Gas (Security of Supply and Network Codes) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/531), reg. 1(2), Sch. 4 para. 6(7) (as amended by S.I. 2020/1016, regs. 1(2), 4(4)(b)); 2020 c. 1, Sch. 5 para. 1(1)
F10Art. 6(4) omitted (31.12.2020) by virtue of The Gas (Security of Supply and Network Codes) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/531), reg. 1(2), Sch. 4 para. 6(8); 2020 c. 1, Sch. 5 para. 1(1)
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Mae’r llinell amser yma yn dangos y fersiynau gwahanol a gymerwyd o EUR-Lex yn ogystal ag unrhyw fersiynau dilynol a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig.
Cymerir dyddiadau fersiynau’r UE o ddyddiadau’r dogfennau ar EUR-Lex ac efallai na fyddant yn cyfateb â’r adeg pan ddaeth y newidiadau i rym ar gyfer y ddogfen.
Ar gyfer unrhyw fersiynau a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig, bydd y dyddiad yn cyd-fynd â’r dyddiad cynharaf y daeth y newid (e.e. ychwanegiad, diddymiad neu gyfnewidiad) a weithredwyd i rym. Am ragor o wybodaeth gweler ein canllaw i ddeddfwriaeth ddiwygiedig ar Ddeall Deddfwriaeth.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys