xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

ANNEX I CU.K.Requirements for construction, testing, installation, and inspection

3.CONSTRUCTION AND FUNCTIONAL REQUIREMENTS FOR RECORDING EQUIPMENTU.K.

3.9 Detection of events and/or faults U.K.

3.9.11 ‘Communication error with the external GNSS facility’ event U.K.
(82)This event shall be triggered, while not in calibration mode, in case of interruption of the communication between the external GNSS facility and the vehicle unit for more than 20 continuous minutes, when the vehicle is moving.U.K.