Section 18: Requirement for heat network consent
39.A heat network must not be constructed or operated without a heat network consent (subsection (1)).
40.References in this Act to the construction of a heat network include references to the construction of an extension to an existing heat network (subsection (2)). The term “heat network consent” is defined in subsection (3).