Search Legislation

Edinburgh Tram (Line Two) Act 2006

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: SCHEDULE 1

 Help about opening options

Alternative versions:

Status:

Point in time view as at 27/04/2006.

Changes to legislation:

There are currently no known outstanding effects for the Edinburgh Tram (Line Two) Act 2006, SCHEDULE 1. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

SCHEDULE 1SScheduled works

(introduced by section 1)

In the local government area of the City of Edinburgh—

  • Work No. 1—A road tramway 463 metres in length (single line) extending from its junction with the termination of Work No. 3 at a point on Princes Street near the Sir Walter Scott Monument, along Princes Street, South St. Andrew Street, the east side of St. Andrew Square, North St. Andrew Street to a point on North St. Andrew Street south of the junction with Queen Street.

  • Work No. 2—A road tramway 495 metres in length (single line) extending from its junction with the termination of Work No. 3 at a point on Princes Street near the Sir Walter Scott Monument, along South St. David Street, the west side of St. Andrew Square, North St. David Street, Queen Street and North St. Andrew Street to its junction with the termination of Work No. 1 on North St. Andrew Street.

  • Work No. 3—A road tramway 1724 metres in length (double line) extending from its junction with the termination of Work No. 4, along Haymarket Terrace, Clifton Terrace, West Maitland Street, Shandwick Place, Rutland Place and Princes Street to its junction with the commencement of Work No. 1 at a point near the Sir Walter Scott Monument.

  • Work No. 4—A tramroad 670 metres in length (double line, with additional layover siding of approximately 100 metres in length) and associated retaining wall structures extending from a point close to 57 Balbirnie Place along the reserved public transport corridor between Balbirnie Place, CA House, Elgin House and the railway, on-road along Haymarket Yards, before running off-road to the north of Rosebery House to a point on the south side of Haymarket Terrace near Haymarket Station.

  • Work No. 5—A tramroad 1650 metres in length (double line) extending from its junction with the commencement of Work No. 4, crossing Russell Road by bridge, crossing Roseburn Street by bridge, crossing the Water of Leith by viaduct and crossing Balgreen Road by bridge, to a point close to the Jenners Depository, including construction of a viaduct along the north side of the main railway line.

  • Work No. 5A—A path and cycleway 300 metres in length extending from a junction with Russell Road south across the disused railway lines to a junction with Balbirnie Place near 46 Balbirnie Place.

  • Work No. 5B—A tramroad 105 metres in length (double line) extending from a point on Work No. 5 to the east of Russell Road, crossing Russell Road by bridge, to a point on the disused railway lines near 46 Balbirnie Place.

  • Work No. 5C—An access road 142 metres in length extending from a junction with Russell Road near 20 Russell Road, crossing Work No. 5 on the level, to a point near the main railway line sidings.

  • Work No. 5D—An access road 66 metres in length extending from a junction with Roseburn Street near the entrance to Murrayfield Stadium, under Work No. 5, to a point near the main railway sidings.

  • Work No. 5E—An access road 30 metres in length extending from a junction with Roseburn Street north of the junction with West Approach Road, under Work No. 5, to a point near Murrayfield Stadium.

  • Work No. 5F—An access road 116 metres in length extending from a junction with Balgreen Road near the junction with Whitson Road, along Pansy Walk and northeast to a point near the main railway line.

  • Work No. 5G—An access road 305 metres in length extending from a point near where the main railway line crosses Leith Water to a point near where the main railway line crosses Balgreen Road, including a junction with the termination of Work No. 5F.

  • Work No. 5H—An access road 172 metres in length extending from a junction with Balgreen Road south of the junction with Baird Drive, crossing Work No. 5 on the level, to a point close to the Jenners Depository.

  • Work No. 6—A tramroad 1188 metres in length (double line) extending from its junction with the termination of Work No. 5, crossing the main railway lines by bridge, to Saughton Mains Street.

  • Work No. 6A—Diversion of Carrick Knowe footpath 42 metres in length extending from a junction with Stenhouse Drive, crossing Work No. 6 on the level, to a point on the existing Carrick Knowe footpath.

  • Work No. 7—A tramroad 3150 metres in length (double line) extending from its junction with the termination of Work No. 6, crossing Saughton Road by bridge, crossing Broomhouse Road by bridge, crossing South Gyle Access by bridge and crossing the main railway line by viaduct, to a point near Lochside Way, including provision of a footpath and cycleway.

  • Work No. 7A—An access road 251 metres in length extending from a junction with Cultins Road to a junction with the roundabout at Hermiston Gait.

  • Work No. 8—A tramroad 950 metres in length (double line) extending from its junction with the termination of Work No. 7, crossing Lochside Avenue on the level, crossing South Gyle Broadway on the level and terminating at a point between South Gyle Broadway and the car park of the Gyle Shopping Centre.

  • Work No. 9—A tramroad 4099 metres in length (double line) extending from its junction with the termination of Work No. 8, under the A8 Glasgow Road, crossing the access road to Meadowfield Farm on the level, crossing the access road to Gogar Castle on the level, crossing the access road to Gogar Farm on the level, crossing Gogar Burn by bridge, crossing Gogar Mains Farm Road on the level, past the Ingliston Park and Ride, crossing the access road to Edinburgh Airport on the level and terminating at a point to the south of the Edinburgh Airport terminal building, including construction of a depot north of the A8 Glasgow Road and construction of a car park for the Ingliston Park and Ride.

  • Work No. 9A—An access road 585 metres in length extending from a junction with the access road to Meadowfield Farm along the access road to Castle Gogar to a junction with the A8 Glasgow Road.

  • Work No. 10—A tramroad 530 metres in length (double line) extending from its junction with Work No. 9 at the Ingliston Park and Ride, crossing Eastfield Road on the level, to a point near the A8 Glasgow Road north of No. 4 Ingliston, including construction of a car park for the Ingliston Park and Ride.

  • Work No. 11—A road tramway 890 metres in length (double line) extending from its junction with the termination of Work No. 10, crossing Ingliston Road on the level, along the A8 Glasgow Road to a point south of the junction with Hallyards Road.

  • Work No. 12—A tramroad 950 metres in length (double line) extending from its junction with the termination of Work No. 11, crossing Station Road on the level, to Harvest Road.

  • Work No. 12A—A path 84 metres in length, crossing work No. 12 on the level.

  • Work No. 13—A road tramway 1817 metres in length (double line) extending from its junction with the termination of Work No. 12, along Harvest Road, under the M9 motorway, along Cliftonhall Road, along Newbridge Industrial Estate Road and terminating at a point west of the Newbridge Roundabout.

  • Work No. 13A—A revision to the road layout 154 metres in length of the Newbridge Industrial Estate Access Road at the termination of Work No. 13.

  • Work No. 13B—A revision to the road layout 386 metres in length of the B7030 near Newbridge Industrial Estate and the Newbridge Roundabout at the termination of Work No. 13.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources