SCHEDULE 7Land of which temporary possession may be taken

(introduced by section 17)

Location

Sheet of Parliamentary plans

Number of land shown on plans

Purposes for which temporary possession may be taken

Authorised work

(1)

(2)

(3)

(4)

(5)

In the local government area of Midlothian—

Whitehill Mains

1

1

Construction compound, working space and access for construction.

Work No. 1

Whitehill Road

1

2, 4

Construction compound, working space and access for construction.

Work No. 1

Millerhill Marshalling Yard

1

7, 10

Construction compound, working space and access for construction.

Work No. 1

Shawfair

1

9

Construction compound, working space and access for construction.

Work No. 1

Millerhill

1, 2

5

Working space.

Work No. 1

Millerhill Marshalling Yard

1, 2

11

Construction compound, working space and access for construction.

Work No. 1

Shawfair

2

12, 12a, 12c, 13, 15, 17, 18, 19, 21, 23, 29a

Working space.

Works Nos. 1, 1A

Shawfair

2

27

Construction compound, working space and access for construction.

Work No. 1

Shawfair

2, 3

29, 31

Working space.

Work No. 1

Longthorne

3

32, 34, 40b

Construction compound, working space and access for construction.

Works Nos. 1, 1B, 1C

Newton Church Road

3

35, 35a, 36

Working space.

Work No. 1C

Harelaw Farm

3

38a, 38b, 41, 41c

Construction compound, working space and access for construction.

Works Nos. 1, 1C, 1D

Harelaw Farm

3

38g, 38j, 38k, 39a, 39b, 39c, 43, 43a, 48, 50

Working space.

Works Nos. 1, 1C, 1D, 1E

Harelaw

3

51, 53, 55, 57, 58, 70, 72

Working space.

Works Nos. 1, 1F

Harelaw

3

54, 59, 60

Construction compound, working space and access for construction.

Works Nos. 1, 1F

Longthorn

3

75

Construction compound, working space and access for construction.

Work No. 1

Longthorn

3, 4

78

Construction compound, working space and access for construction.

Work No. 1

Longthorn

4

79, 80, 83, 114

Construction compound, working space and access for construction.

Works Nos. 1, 1G, 1H

Millerhill Road

4

91a, 94, 95b, 98, 98a, 98b, 99, 102, 126a

Construction compound, working space and access for construction.

Works Nos. 1, 1G, 1J

The Cockatoo public house

4

117, 118

Construction compound, working space and access for construction.

Works Nos. 1, 1G, 1J

Wester Millerhill

4

119, 122

Construction compound, working space and access for construction.

Works Nos. 1, 1J

Millerhill Road

4, 5

126, 127

Construction compound, working space and access for construction.

Works Nos. 1, 1J, 1K

Sheriffhall

5

140

Construction compound, working space and access for construction.

Works Nos. 1, 1J

Sheriffhall

5, 6

139, 144

Construction compound, working space and access for construction.

Works Nos. 1, 1J

Sheriffhall

5, 6

141, 143

Construction of bridge under the City of Edinburgh Bypass.

Work No. 1

Sheriffhall

6

145, 147, 148, 149, 154, 155, 158

Construction compound, working space and access for construction.

Works Nos. 1, 2

Glenesk

6, 7

159

Construction compound, working space and access for construction.

Works Nos. 1, 2

Gilmerton Road

7

178

Construction compound, working space and access for construction.

Work No. 2

Glenesk

7

162, 163, 165, 166, 167, 168, 169, 170, 174, 175

Construction compound, working space and access for construction.

Work No. 2

Eskbank

7, 8

177

Construction compound, working space and access for construction.

Work No. 2

Eskbank

8

179a, 180

Construction compound, working space and access for construction.

Work No. 2

Station Road, Eskbank

8

186, 186a, 186c

Construction compound, working space and access for construction.

Work No. 2

Hardengreen

9

191a, 195, 197c, 200a, 200b, 209, 210, 211, 212

Construction compound, working space and access for construction.

Works Nos. 2, 2A, 2B, 2C, 2D

Hardengreen

9, 10

213

Construction compound, working space and access for construction.

Work No. 2

Hardengreen

9, 11

215, 216, 217

Construction compound, working space and access for construction.

Work No. 2

Hardengreen

10

214

Construction compound, working space and access for construction.

Work No. 2

Hardengreen Junction

11

218, 218a, 218b, 220, 221, 223, 225, 226, 229

Construction compound, working space and access for construction.

Work No. 2

Dalhousie Mains

11

230, 231, 233

Construction compound, working space and access for construction.

Work No. 2

Newbattle Viaduct

11

236, 238, 239, 241, 243

Construction compound, working space and access for construction.

Work No. 2

Newbattle Viaduct

11, 12

244, 245

Construction compound, working space and access for construction.

Work No. 2

Newbattle Viaduct

12

247, 249, 249a, 250, 251, 254

Construction compound, working space and access for construction.

Work No. 2

Dalhousie Road

12

258

Construction compound, working space and access for construction.

Work No. 2

Butlerfield Industrial Estate

13

288, 289

Construction compound, working space and access for construction.

Work No. 2

Newtongrange

13

275, 275a, 276, 277

Construction compound, working space and access for construction.

Works Nos. 2, 2F

Victoria Road

13

286, 286b

Construction compound, working space and access for construction.

Work No. 2

Lady Victoria Colliery

13

291a

Construction compound, working space and access for construction.

Work No. 2

Butlerfield Industrial Estate

13, 14

290

Construction compound, working space and access for construction.

Work No. 2

Lady Victoria Colliery

13, 14

291

Construction compound, working space and access for construction.

Work No. 2

Butlerfield Industrial Estate

14

290a, 290b, 299

Construction compound, working space and access for construction.

Works Nos. 2, 3

Lady Victoria Colliery

14

293, 293a, 294, 296, 298

Construction compound, working space and access for construction.

Works Nos. 2, 3

Brewer's Bush Bridge

14

301, 303, 307

Construction compound, working space and access for construction.

Works Nos. 2, 3

Brewer's Bush Bridge

14, 15, 16

304

Construction compound, working space and access for construction.

Works Nos. 2, 3

Redheugh

15

308, 309, 310, 311, 312, 313

Construction compound, working space and access for construction.

Work No. 3

Redheugh

15, 16

316

Construction compound, working space and access for construction.

Work No. 3

Povert Road

16

317, 318, 319, 320, 321, 323, 326, 327, 328, 330, 331, 332, 333, 334

Construction compound, working space and access for construction.

Work No. 3

Gore Glen Country Park

16, 17

336, 337

Construction compound, working space and access for construction.

Works Nos. 3, 3A

Shank Bridge

16, 17

338

Construction compound, working space and access for construction.

Work No. 3

Shank Bridge

17

338a, 342, 345, 348

Construction compound, working space and access for construction.

Works Nos. 3, 3B, 3C

Millbank House

17, 18

344

Construction compound, working space and access for construction.

Work No. 3C

Shank Bridge

17, 19

348a

Construction compound, working space and access for construction.

Works Nos. 3, 3B, 3C

Arniston Engine

18

343

Construction compound, working space and access for construction.

Work No. 3

Stobs Mills House

19

360, 360a, 361, 362, 366

Construction compound, working space and access for construction.

Works Nos. 3, 3C

Stobs Mills House

19

363, 364, 365

Construction compound, working space, access and relocation of apparatus.

Works Nos. 3, 3C

Station Road

19

387

Construction compound, working space and access for construction.

Work No. 3

St Margaret's Church

19

391

Construction compound, working space and access for construction.

Work No. 3

Robertson's Bank

20

400, 401, 402, 413

Construction compound, working space and access for construction.

Works Nos. 3, 3D

Robertson's Bank

20, 21

404

Construction compound, working space and access for construction.

Works Nos. 3, 3D

Fushiebridge

21

414, 415, 416, 420, 421, 421a

Construction compound, working space and access for construction.

Work No. 3

Catcune

21

423, 424, 425, 426

Construction compound, working space and access for construction.

Work No. 3

Catcune

21, 22

427

Construction compound, working space and access for construction.

Work No. 3

Catcune

22

428, 431

Construction compound, working space and access for construction.

Work No. 3

Catcune

22, 23

429

Construction compound, working space and access for construction.

Work No. 3

Borthwick Mains

24

434, 436, 437, 439, 440, 445, 446

Construction compound, working space and access for construction.

Works Nos. 3, 4

Borthwick Mains

24, 25

444

Construction compound, working space and access for construction.

Works Nos. 3, 4

Birky Side

24, 25

450

Construction compound, working space and access for construction.

Work No. 4

Birky Side

25

451, 452

Construction compound, working space and access for construction.

Work No. 4

Birky Side

25, 26

454, 456

Construction compound, working space and access for construction.

Work No. 4

Maggie Bowies Glen

26

457, 458

Construction compound, working space and access for construction.

Work No. 4

Maggie Bowies Glen

26, 27

459, 460

Construction compound, working space and access for construction.

Work No. 4

Maggie Bowies Glen

27

461, 462, 463, 464, 465, 467, 468

Construction compound, working space and access for construction.

Work No. 4

Maggie Bowies Glen

27, 28

466, 469, 470

Construction compound, working space and access for construction.

Work No. 4

Tynehead

28

475, 478, 480

Construction compound, working space and access for construction.

Work No. 4

Tynehead

28, 29

482

Construction compound, working space and access for construction.

Work No. 4

Tynehead

29

484, 485, 486, 487

Construction compound, working space and access for construction.

Work No. 4

Tynehead

29, 30

488, 490

Construction compound, working space and access for construction.

Work No. 4

Tynehead

30

491

Construction compound, working space and access for construction.

Work No. 4

Tynehead

30, 31

495

Construction compound, working space and access for construction.

Work No. 4

Tynehead

31

499, 502

Construction compound, working space and access for construction.

Works Nos. 4, 5

In the local government area of Scottish Borders—

Tynehead

30

1, 5, 6

Construction compound, working space and access for construction.

Work No. 4

Tynehead

30, 31

9

Construction compound, working space and access for construction.

Work No. 4

Tynehead

31

10, 11, 12a, 12b, 15

Construction compound, working space and access for construction.

Work No. 5

Tynehead and Cowbraehill

31, 32

12

Construction compound, working space and access for construction.

Work No. 5

Cowbraehill

32

17, 18, 19, 21

Construction compound, working space and access for construction.

Work No. 5

Cowbraehill and Falahill

32, 33

22

Construction compound, working space and access for construction.

Works Nos. 5, 5A, 5B

Falahill

33

24, 28, 30, 30a, 31, 32, 40, 41

Construction compound, working space and access for construction.

Works Nos. 5, 5A, 5B

Falahill

33, 34

33

Construction compound, working space and access for construction.

Works Nos. 5, 5A, 5B

Falahill

34

46, 47

Construction compound, working space and access for construction.

Works Nos. 5, 5A

Falahill

34, 35

52

Construction compound, working space and access for construction.

Work No. 5

Falahill

35

55, 56, 57, 59, 60, 61

Construction compound, working space and access for construction.

Work No. 5

Heriot

35, 36

64, 65

Construction compound, working space and access for construction.

Works Nos. 5, 5C

Heriot

36

67, 74, 76, 77, 79, 88

Construction compound, working space and access for construction.

Works Nos. 5, 5C, 5D

Heriot

36, 37

85a, 91, 123

Construction compound, working space and access for construction.

Works Nos. 5, 5D, 5E

Heriot

37

101, 102, 113, 114, 115

Construction compound, working space and access for construction.

Works Nos. 5D, 5F

Hangingshaw

37

121a, 125, 126, 128, 132, 140, 144

Construction compound, working space and access for construction.

Works Nos. 5, 5D, 5G

Stagebank

38

146, 147, 153, 154, 155

Construction compound, working space and access for construction.

Works Nos. 5, 6

Stagebank

38, 39

158, 159

Construction compound, working space and access for construction.

Works Nos. 5, 6

Stagebank

39, 40

159a, 161

Construction compound, working space and access for construction.

Work No. 6

Haltree

40

167, 168, 169, 170

Construction compound, working space and access for construction.

Work No. 6

Crookston

41

173, 174

Construction compound, working space and access for construction.

Work No. 6

Crookston

41, 42

175

Construction compound, working space and access for construction.

Work No. 6

Crookston

42

176

Construction compound, working space and access for construction.

Work No. 6

Crookston Cottage

42

177

Construction compound, working space and access for construction.

Work No. 6

Crookston

42, 43

179, 181

Construction compound, working space and access for construction.

Works Nos. 6, 7

Hazelbank

43

182, 184, 185, 187, 189

Construction compound, working space and access for construction.

Works Nos. 6, 7

Hazelbank

43, 44

191

Construction compound, working space and access for construction.

Works Nos. 6, 7, 7A

Fountainhall

43, 44

193

Construction compound, working space and access for construction.

Works Nos. 7, 7A

Fountainhall

44

191a, 192, 200, 209, 217, 218, 218a, 220, 221, 222, 222a, 222b, 222c, 224

Construction compound, working space and access for construction.

Works Nos. 7, 7A, 7B

Fountainhall

44, 45

223

Construction compound, working space and access for construction.

Works Nos. 7, 7B

Fountainhall

45

224a, 225a, 233, 236, 237, 238, 242

Construction compound, working space and access for construction.

Works Nos. 7, 7B

Fountainhall

45

235

Access for construction of fence.

Works Nos.7, 7B

Fountainhall

45, 46

243

Construction compound, working space and access for construction.

Work No. 7

Plenploth

46

245, 246, 248

Construction compound, working space and access for construction.

Work No. 7

Plenploth

46, 47

250

Construction compound, working space and access for construction.

Work No. 7

Plenploth

47

251, 252, 253, 255, 255a, 257

Construction compound, working space and access for construction.

Work No. 7

Torquhan

47, 48

262, 264, 265

Construction compound, working space and access for construction.

Work No. 7

Torquhan

48

263

Construction compound, working space and access for construction.

Work No. 7

Torquhan

48, 49

266

Construction compound, working space and access for construction.

Work No. 7

Pirn House

48

270, 272

Construction compound, working space and access for construction.

Work No. 7

Pirn House

48, 50

275

Construction compound, working space and access for construction.

Work No. 7

Torquhan

49

267, 268

Construction compound, working space and access for construction.

Work No. 7

Torquhan

50

271a

Construction compound, working space and access for construction.

Work No. 7

Pirn House

50

277

Construction compound, working space and access for construction.

Work No. 7

Watherston

50

280, 281, 282, 283, 284, 285, 286, 287, 288, 289

Construction compound, working space and access for construction.

Work No. 7

Watherston

51

293, 294, 295, 295a, 297, 298, 299, 300, 301, 303

Construction compound, working space and access for construction.

Work No. 7

Watherston

51, 52

305, 306

Construction compound, working space and access for construction.

Work No. 7

Watherston

52

306a

Construction compound, working space and access for construction.

Work No. 7

Galabank

52

308, 311, 312, 313, 314, 315, 316, 318a, 320, 323

Construction compound, working space and access for construction.

Work No. 7

Stow

54

338

Construction compound, working space and access for construction.

Works Nos. 7, 8

Stow

Stow plan

344, s3

Construction compound, working space and access for construction.

Work No. 8

Stow

55

347, 348

Construction compound, working space and access for construction.

Work No. 8

Stow

55, 56

349, 350

Construction compound, working space and access for construction.

Work No. 8

Stow

56, 57

353

Construction compound, working space and access for construction.

Work No. 8

Stow

57

354, 355, 356, 360, 362, 363, 365

Construction compound, working space and access for construction.

Work No. 8

Stow

57, 58

366

Construction compound, working space and access for construction.

Work No. 8

Stow

57, 58, 59

369

Construction compound, working space and access for construction.

Work No. 8

Stow

58

366a

Construction compound, working space and access for construction.

Work No. 8

Ferniehirst

58, 59

372

Construction compound, working space and access for construction.

Work No. 8

Bow

59

394, 395, 396, 397

Construction compound, working space and access for construction.

Works Nos. 8, 8A

Ferniehirst

59

374, 376, 378, 378a, 379

Construction compound, working space and access for construction.

Works Nos. 8, 8A

Bow

59, 60

398, 402

Construction compound, working space and access for construction.

Works Nos. 8, 8A

Bow

60

403, 404, 405, 406a

Construction compound, working space and access for construction.

Work No. 8

Bowshank

60

407, 409, 500, 502, 503, 504, 506, 507, 508, 513, 514, 515, 515a, 520, 522

Construction compound, working space and access for construction.

Work No. 8

Bowshank

60, 61

515b, 523

Construction compound, working space and access for construction.

Work No. 8

Bowshank

61

515c, 527, 530, 531

Construction compound, working space and access for construction.

Work No. 8

Bowshank

62

533, 535, 536

Construction compound, working space and access for construction.

Works Nos. 8, 9

Bowland Bridge

62

537, 538, 543, 545, 546

Construction compound, working space and access for construction.

Works Nos. 8, 9

Bowland Wood

63

549, 550, 551, 552

Construction compound, working space and access for construction.

Work No. 9

Whitelee House

64

560, 561, 562, 563, 564, 565, 566, 568

Construction compound, working space and access for construction.

Work No. 9

Whitelee House

64, 65

566a

Construction compound, working space and access for construction.

Work No. 9

Whitelee House

65

566b

Construction compound, working space and access for construction.

Work No. 9

Robin's Knowe

65

570, 571, 572, 574, 575, 576, 577, 577a, 577b, 581

Construction compound, working space and access for construction.

Work No. 9

Robin's Knowe

65, 66

582

Construction compound, working space and access for construction.

Work No. 9

Torwoodlee

66

582a, 587, 589

Construction compound, working space and access for construction.

Work No. 9

Torwoodlee Golf Course

66, 69

588

Construction compound, working space and access for construction.

Work No. 9

Torwoodlee

66, 70

602, 604

Construction compound, working space and access for construction.

Work No. 9

Torwoodlee

66, 67, 68

603

Construction compound, working space and access for construction.

Work No. 9

Torwoodlee

69

588a, 590, 591, 591a, 592, 593, 594, 595, 596, 597, 598

Construction compound, working space and access for construction.

Work No. 9

Torwoodlee Tunnel

70

606, 607, 608, 609, 610, 614, 616, 617

Construction compound, working space and access for construction.

Works Nos. 9, 10

Wood Street

70

619, 619a, 620, 620a, 621, 623, 623a

Construction compound, working space and access for construction.

Works Nos. 9, 10

Mill Park

70

624a

Construction compound, working space and access for construction.

Works Nos. 9, 10

Mill Park

70, 71

624, 625

Construction compound, working space and access for construction.

Works Nos. 9, 10

Kilnknowe Place

71

632, 633, 635, 636, 637, 639, 640, 641, 644, 647, 654, 655

Construction compound, working space and access for construction.

Work No. 10

Kilnknowe Place

71, 72

656

Construction compound, working space and access for construction.

Work No. 10

Plumtreehall Brae

71, 72

658, 659, 660, 661, 662

Construction compound, working space and access for construction.

Works Nos. 10, 10A, 10B

High Buckholmside

72

691, 692

Construction compound, working space and access for construction.

Work No. 10

Low Buckholmside

72

693, 694, 695a, 696, 696a

Construction compound, working space and access for construction.

Work No. 10

Plumtreehall Brae

72

663, 666, 667, 668, 669, 672, 673, 676, 684, 687, 687a, 688, 690

Construction compound, working space and access for construction.

Works Nos. 10, 10A, 10B

Low Buckholmside

72, 73

695, 697, 699

Construction compound, working space and access for construction.

Works Nos. 10, 10C

Low Buckholmside

73

697a, 704, 708

Construction compound, working space and access for construction.

Works Nos. 10, 10C

Ladhope Vale

73

709, 710, 712

Construction compound, working space and access for construction.

Works Nos. 10, 10E

Currie Road

74

726, 728, 731, 731a, 732, 732a, 734, 736, 743, 743a, 748b, 750, 758, 762

Construction compound, working space and access for construction.

Works Nos. 10, 10D, 10E, 10F, 10G, 10H

Glenfield Road

75

763a, 765, 766, 770, 771

Construction compound, working space and access for construction.

Works Nos. 10, 10J

Glenfield Road

75, 76, 77

772

Construction compound, working space and access for construction.

Work No. 10

Glenfield Road

76

775, 776, 778

Construction compound, working space and access for construction.

Works Nos. 10, 10J

Woodstock Avenue

76

780, 781, 781a, 782, 784a, 785

Construction compound, working space and access for construction.

Work No. 10

Winston Place

76, 77

786a, 786b

Construction compound, working space and access for construction.

Work No. 10

Winston Place

77

787

Construction compound, working space and access for construction.

Work No. 10

Winston Road

77

788, 790, 791, 792, 794, 795

Construction compound, working space and access for construction.

Work No. 10

Galafoot

77

797, 797a, 798, 798a, 799, 802, 803, 804, 805, 807, 809, 810, 811

Construction compound, working space and access for construction.

Work No. 10

Tweedbank

77,78

812, 813

Construction compound, working space and access for construction.

Work No. 10

Tweedbank

78

815, 816, 822, 823, 823b, 824

Construction compound, working space and access for construction.

Works Nos. 10, 10K, 10L