SCHEDULE 1Projects
Part 2
Production and processing of metals
I126
1
Installations for the production of pig iron or steel (that is, primary or secondary fusion) including continuous casting.
2
Installations for the processing of ferrous metals, that is to say—
a
hot-rolling mills;
b
smitheries with hammers;
c
application of protective fused metal coats.
3
Ferrous metal foundries.
4
Installations for the smelting of (including the alloyage of) non-ferrous metals except precious metals (including recovered products, for example, by refining or foundry casting).
5
Installations for surface treatment of metals and plastic materials using an electrolytic or chemical process.
6
Manufacture and assembly of motor vehicles and manufacture of motor-vehicle engines.
7
Shipyards.
8
Installations for the construction and repair of aircraft.
9
Manufacture of railway equipment.
10
Swaging by explosives.
11
Installations for the roasting and sintering of metallic ores.