Robin Rigg Offshore Wind Farm (Navigation and Fishing) (Scotland) Act 2003

2Power to deviate from specified locationsS

In constructing and maintaining the turbines, the electrical substation or the anemometry mast, the undertaker may deviate laterally up to a limit of 50 metres from the locations described in the schedule to this Act.