SCHEDULELocation of the regulated works

(introduced by section 1)

1

The centre point of each of the turbines is to be at the following reference points—

Turbine No.

Easting (m)

Northing (m)

A1

290703

543168

A2

291153

542982

B1

290130

542923

B2

290524

542739

B3

290962

542541

B4

291367

542368

B5

291753

542132

C1

289517

542725

C2

289955

542530

C3

290352

542343

C4

290789

542134

C5

291181

541954

C6

291592

541751

D1

288897

542509

D2

289324

542311

D3

289777

542101

D4

290174

541915

D5

290602

541720

D6

290996

541539

D7

291424

541341

E1

288346

542239

E2

288711

542068

E3

289150

541873

E4

289583

541672

E5

289989

541489

E6

290416

541299

E7

290826

541088

E8

291237

540902

F1

288118

541830

F2

288560

541691

F3

288985

541449

F4

289405

541259

F5

289810

541075

F6

290246

540875

F7

290649

540678

F8

291067

540490

G1

287916

541413

G2

288343

541214

G3

288806

541024

G4

289227

540846

G5

289628

540661

G6

290060

540474

G7

290471

540285

G8

290901

540099

H1

288175

540806

H2

288621

540590

H3

289032

540418

H4

289453

540247

H5

289874

540061

H6

290303

539874

H7

290733

539706

J1

288425

540126

J2

288846

539948

J3

289267

539786

J4

289688

539616

J5

290109

539438

J6

290505

539284

K1

288660

539527

K2

289089

539349

K3

289502

539171

2

The centre point of the electrical substation is to be at reference point Easting (m) 291150 and Northing (m) 540380 or at reference point Easting (m) 288514 Northing (m) 539284.

3

The centre point of the anemometry mast is to be at reference point Easting (m) 288514 Northing (m) 539284 and the connecting power and communication cables are to run from that point and to join the system at turbine No. K1.

4

The routes of the cables referred to in section 1(1)(d) of this Act are to run in direct lines between any two adjacent turbines and between the electrical substation and—

a

turbines Nos. G8 and F8; or

b

turbine No. K1.

5

The route of the cables referred to in section 1(1)(e) of this Act is to commence by a connection with the electricity substation and to run in a south easterly direction until it reaches the boundary of Scotland at reference point Easting (m) 291510 Northing (m) 540140 or is to follow such alternative route as may be permitted by the Scottish Ministers under section 34 of the Coast Protection Act 1949 (c. 74).